Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: 909 New Jersey
See JDLand's 909 New Jersey Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


80 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8

Here's a brief wrap-up of Near Southeast-related items from last night's ANC 6D meeting (though the folks following my Twitter feed got some pithy tidbits in real time):
* JPI was there requesting support for a public space permit to put up a sign at 909 New Jersey. If you've been thinking that this apartment building looks pretty far along, you're correct: the JPI rep said that they're looking to deliver the first units in February. The building has 6,000 square feet of ground-floor retail space, of which 4,000 is expected to be leased to restaurants. The discussion about the sign permit devolved into concerns about the main staircase on New Jersey Avenue splitting up the public space, which DDOT's public space committee has already approved but which ANC members weren't sure they'd ever seen. The vote on the sign permit request was 4-0-2 in favor of asking DDOT to postpone the decision on the sign as a protest against the sign and NJ Ave public space permits not having been done together.
* EYA and the DC Housing Authority presented their request for ANC support for some new brick "screens" on certain public housing units at Capitol Quarter that won't have alley access and so will need to have their trash and recycling cans placed by the buildings' fronts. There are nine corner buildings in Capitol Quarter with 27 public housing units that will need these screens, though there are also corner buildings at CQ that are not public housing, and there are additional public housing units that are not in these corner buildings. But the ANC felt that these trash screens would make the affected units easily identified as public housing, which would negate what commissioners described as the "concept of Hope VI" where you're not supposed to be able to "tell the difference" in market-rate and public-housing units from the outside. There were also concerns about units with windows above the trash enclosures (i.e., the smell and also having to look out at the trash bins). The rep from DCHA asked the ANC to table the request for support rather than oppose it (so that EYA and DCHA could come back with some revised designs), but the ANC voted 5-0 to oppose the request anyway.
Both these public space permits are on Thursday's agenda of the city's Public Space Committee.
There was also to be a discussion of the stadium Traffic Operations and Parking Plan, but it got moved to late in the agenda, and it sounded like it was going to be just in terms of the impact on Southwest, so I will admit that I didn't stick around.
Comments (0)
More posts: 909 New Jersey, ANC News, Capper, Capitol Quarter, jpi
 

* The ANC 6D agenda for its meeting on Monday Oct. 20 has been sent around (though not yet posted online). There will be a discussion of the Ballpark Traffic Operations and Parking Plan as it relates to Southwest, plus public space requests for building signage at 909 New Jersey and "Brick Walls for Trash Enclosures" at Capitol Quarter. (These are also on the Oct. 23 agenda of the city's Public Space Commitee.)
* The short list for a design/build team to reconstruct the 11th Street Bridges is out--Shirley Design-Build LLC, Skansa/Facchina, Archer Western Contractors LLC, Perini/Parsons Joint Venture, and KCA Constructors Joint Venture. According to the procurement schedule, a draft RFP should already be out (haven't found it online), and final RFP should be issued by the end of the year, with a contract signed with the vendor by June 1, 2009.
* Metro announced yesterday that 53 percent of baseball game attendees this year arrived at Nationals Park via Metrorail. That's 1.8 million bodies, averaging 23,000 people entering and exiting the Navy Yard station at the 80 home games in 2008. (It apparently doesn't count people who took the bus or walked down from Capitol South.) In the last two years at RFK, only 38 percent of attendees took the subway. Marc Fisher has some thoughts on it all (including some questions on Metro's math).
 

I took a few quick pictures on First Street and Fourth Street on Saturday, to capture 909 New Jersey and Capitol Quarter in the late-afternoon sun--you can see all of them with their befores here.
I also finally got to some other shots to fill in two glaring holes in my portfolio, but it might be a couple of days until I get those posted. Until then, you'll just have to guess.
Comments (0)
More posts: 909 New Jersey, Capper, Capitol Quarter, jpi
 

From today's print edition of the Washington Business Journal (subscribers only): "In response to the burgeoning credit crisis, local multifamily developer JPI East has reduced its development and production capacity, laying off half its development divisions. The company would not say how many people were involved, but insiders say it was fewer than 10."
As for JPI's projects in Near Southeast, including the almost-completed 70 and 100 I, the under-construction 909 New Jersey, and the in-development 23 I? "The company still has 10 deals under construction in the region, including three luxury apartment projects in the Capitol Riverfront district near Nationals Park. All three have the debt and equity to go forward, [JPI East's president] says." It might be worth noting, however, that the previously announced September 2008 start date for 23 I has come and gone; and the Wendy's building is still standing, and I haven't so far seen any raze permits coming through the pipeline for it.
Comments (0)
More posts: One Hill South, 70/100 I, One Hill South, 909 New Jersey, jpi, Square 697n
 

Before the storm clouds arrived yesterday (literally and figuratively), I got out and took an incomplete smattering of pictures along Second, New Jersey, First, Cushing, and Half. (Use those links to see all the before-and-nows of these latest shots.) These new photos are mainly of 909 New Jersey, Velocity, 55 M, the empty skyline where 1015 Half is just about to reach ground level, and the final "after" photos from the demolition of the Merritt Cab building at First and K on Square 696. The sun disappeared before I could get over to Capitol Quarter, so new photos from there will have to wait a few days, and since the afternoon remained cloudy (and busy), I didn't take an afternoon batch (i.e., no photos looking east).
And, if you haven't wandered through them for a while, the gallery of my favorite before-and-afters is a striking walk through the past few years, as the memories of the old Near Southeast start to get just a wee bit hazy.
 

The facings and brick continue to go up at 909 New Jersey (and there's even a window or two). I took a pretty complete set of the close-up photos, some of which you can see on the project page; for more, and to see the building from farther away (to get an idea of how prominent it is these days in the neighborhood's ever-changing skyline), check the Expanded Project Archive.
I also got updated shots of the northwestern part of Near Southeast from one of the more popular vantage points, up on the Southeast Freeway approaching South Capitol Street. The before-and-afters (especially the grainy one from September 2000) are a good reminder of how much has happened, and how fast. And with 1015 Half's crane now front and center, we know that this view will be changing (again!) within a few months. (And this is where I need to remind that I take these freeway photos from a passenger seat at 55 mph, not on foot or behind the wheel. Duh!)
Comments (0)
More posts: 909 New Jersey, jpi
 

A few weeks ago I was told that the Onyx on First apartment building would probably be opening its first three floors in early August, and judging by the newly installed sidewalk along First Street and a peek into the lobby, it doesn't appear to be far off. The building will have approximately 260 units, and began construction in fall 2006. On my Onyx project page, you can see updated photos, along with a few new images of the buildings that preceded Onyx on this site.
Two blocks to the north, 909 New Jersey speeds along, with its distinctive roofline now visible from many locations around the neighborhood, as you can see both on the project page and in the Expanded 909 Photo Gallery. (What do we call this roof thing? The crow's nest? The bow?) The photos also show that brick is now being added to the First Street side of the building. This 237-unit rental building with ground-floor retail space will be the third of JPI's four "Capitol Yards" residential developments, and is expected to be completed next year.
(And while you look at all the latest photos, be sure to take a moment to thank the supreme being of your choice for bestowing upon us Sunday's gorgeous weather and severe clear blue sky, which is such a rarity given DC's normally haze-filled Augusts.)
Comments (0)
More posts: 909 New Jersey, jpi, Onyx, Square 743N
 

It's almost hard to believe that in 2001 there were only two buildings taller than five stories in Near Southeast; gazing now across the neighborhood from the vantage point of the Southeast Freeway gives off a decidely different vibe, with 14 taller-than-five-stories buildings completed or under construction. (And there's a baseball stadium, too.)
You can see the changes via the Photo Archive, where I've just added updated photos from the freeway at South Capitol Street that you can browse by looking at just the oldest and newest shoots or by including all the photos in between. And, in honor of 909 New Jersey now being visible from the freeway, I've added photos starting in late 2005 of the view down New Jersey Avenue while zooming east on the freeway at [redacted] mph.
Comments (0)
More posts: 909 New Jersey, jpi
 

Now this is what Spring is supposed to be like. I didn't have much time, but I wandered around to get mainly new photos of 909 New Jersey, which is sprouting like a weed. Here's the entire batch of today's photos, centered mainly on the area bounded by Half, New Jersey, I, and K (with a few from Second Street thrown in). You can also look at the Half and I, Half and K, First and I, First and K, New Jersey and I, and New Jersey and K intersection archives to see the before-and-after comparisons. (You'll also see the new rental office trailer for 70/100 I on the southwest corner of Half and I.) Watch for the icon, though the photos I took on gloomy May 1 are marked as "new" still, too. And, as always, the See All Photos of This Angle icon will show you all photos in the archive of a certain intersection (like the northwest corner of New Jersey and K, which you can watch get demolished, then see 70/100 I rise up in the distance, and now watch 909 New Jersey climb up.)
Comments (0)
More posts: 70/100 I, 909 New Jersey, jpi, Square 699n, Velocity Condos
 

Since it's such a rotten day, I'll go back to when the sun was shining (Tuesday), and give you my first-ever photos from the roof of 20 M Street. (I've taken a few photos from inside the 10th floor going back to April of last year, but from the roof I don't have deal with the pesky glass reflections.) Here are these new photos matched with the oldest ones from the same angle, so you can compare 13 months' worth of changes easily; you can also look at all the photos if you want to watch the progression of changes. There's views to the north (above), showing the digging now underway at 1015 Half Street along with the construction progress at 70/100 I, 909 New Jersey, and Velocity (plus the site-clearing at 23 I). To the south is the increasingly-shiny 55 M, as well as the ballpark, of course. I also tossed in some photos toward the west, showing the skyline of Southwest.
 
80 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8