Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: New Jersey Ave.
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


51 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6

Positive Nature, the non-profit at 1017 New Jersey that works with at-risk youngsters, is having a "radical rally" on Saturday March 15 from noon to 3 pm, an invitation to the public to tour the facilities and meet the participants as they try to save their program. You can read about their work and their struggle to remain at their New Jersey Avenue site as their property taxes have skyrocketed in this recent City Paper article.
Comments (0)
More posts: New Jersey Ave., square 740
 

* The tarp is coming off the field today--look at that pretty turf! It's probably being done today because Tuesday the Nats are holding a ceremony to install home plate and officially unveil the HD scoreboard (not open to the public).
* The Examiner reports that Metro is tamping down expectations a bit for performance along the Green line for weeknight ballgames: "The transit agency expects the number of riders on the Green Line, which serves the Navy Yard station near the ballpark, to more than triple on game days. But Metro can't add more cars to that section of the system during the week because all of its 820 railcars are committed to rush hour service, officials said." So, perhaps that notion of walking from Capitol South is looking more attractive--I've added to my Take Metro! page a map of the JDLand Suggested Route between Capitol South and the stadium, along with a few photos showing the current state of New Jersey Avenue (which certainly isn't as scary as it used to be).
And, Tuesday is just chock full of Near Southeast-related activities. In addition to the ceremony mentioned above, there's also these items to remember:
* Single-game ticket sales open at 9 am (yes, including Opening Day).
* The City Council will be meeting at 10 am for its monthly legislative meeting, and the agenda includes emergency legislation to enact the "Performance Parking Pilot Zone Emergency Act of 2008", B17-0644, the "Ballpark Safety Emergency Amendment Act of 2008", and B17-0608, the "Vending Regulation Emergency Act of 2008". It's in Room 500 of the Wilson Building, beginning at 10 am, and will be broadcast on DC cable 13 and live webcast.
* The first of two public meetings on the South Capitol Street Draft Environmental Impact Statement is at 6:30 pm at Birney Elementary School, 2501 Martin Luther King Jr., Ave., SE, from 6:30-8:30 pm. The second one is Wednesday night (March 5) at Amidon Elementary School, 401 I St., SW, also from 6:30-8:30 pm.
Comments (0)
More posts: Metro/WMATA, New Jersey Ave., South Capitol St., Nationals Park
 

In our latest edition of What's the Deal With...., reader JD of JDLand.com asks: "WTDW with the old trash transfer site at 900 New Jersey Avenue, that place with the smokestack and all the Department of Public Works operations?"
At Wednesday's marathon capital budget hearing (no, I'm still not done watching it) the agency's director mentioned both the New Jersey Avenue site and the maintenance yard on O Street beneath the 11th Street Bridges as DPW locations that will eventually be moving to make way for development associated with the city's Anacostia Waterfront initiatives. I e-mailed DPW to get some clarification on his remarks, and have been told that the street sweepers that currently operate out of 900 New Jersey will be relocating in November to DPW's Bryant Street, NW, facility, but that other DPW functions are going to remain at New Jersey and K until the Office of Property Management can find them a new home.
This site is eventually supposed to be redeveloped as a mixed-income apartment building under the Capper/Carrollsburg Hope VI plan, but no timeline has been announced. And William C. Smith's plans for a 1-million-square-foot project on the block just to DPW's north, which include reopening I Street between New Jersey and Canal, would seem to need DPW to move out before they can get started.
As I wrote about over the summer, neighbors have been wanting that building closed for a long, LONG time.
 

I visited my perch above New Jersey Avenue today and got updated photos looking to the south and west and northwest, which provide quite the overview of the changes in the past 21 months on the blocks I've wittily dubbed North of M (between M, South Capitol, the freeway, and New Jersey). The two links above show you just the oldest and the newest photos for each angle, or you can try these links to see all the photos I've taken of those angles, at about three-month intervals.
Of course, the arrivals of 100 M, Onyx, and 70/100 I are the biggest changes; you can also see that Velocity is building the garage levels and will be above ground by late winter, and that 909 New Jersey's crane is now in place, meaning that vertical construction there is not far off. But thanks to the 100 M/Onyx construction, peeks at the ballpark and Monument Half Street from this vantage point are now pretty well gone.
I also took a few ground-level photos of the New Jersey and L intersection to capture the change in the skyline above St. Matthew's, which is easier to see now that that big old tree has dropped its leaves. You can see just today's ground-level shots, or compare them with past photos.
If none of these billion links tickle your fancy, all ground-level and sky-high photos from today can be seen on a single page.
 

Because I'm not always so successful in getting people to tell me the current status of various projects, I spend a lot of time pouring through documents hoping to get hints here or there, and within the past few days I've uncovered a few new ones. I sent out some e-mails asking for additional information, but those have gone unanswered (waaaaah!), so I'll just post what I've seen, and wait for the various bureaucratic processes to move along to get more information.
The developers of the planned office building at 1111 New Jersey Avenue are having a Capitol Gateway Overlay Review in front of the Zoning Commission on Jan. 31. This review is now required because Donohoe is buying the land on top of the Navy Yard Metro station east entrance, which means that the project's property now "fronts" M Street and must get a review by the Zoning Commission to make sure it follows the design and usage requirements laid out by the CG Overlay. I haven't seen any new renderings yet to know whether the building has grown from its original 146,000-sq-ft design (note: see UPDATE below). No mentions yet of when construction might start. Presumably this design will be presented to ANC 6D, at perhaps its January meeting.
And, in the Questions and Responses posted along with the Capper PILOT underwriters RFP, there's the following statements:
* 250 M Street, the 200,000-sq-ft office building by William C. Smith, "will commence construction on or about May 2008";
* 600 M Street, the 500,000-sq-ft office building by Forest City on the old Capper Seniors site, "is expected to commence construction in late 2009 or early 2010 -- Stage II PUD process with the District Zoning Commission has already commenced"; and
* 800 New Jersey/120 Canal, the planned 1.1-million-sq-ft mixed use project by William C. Smith on the land north of I between Second and New Jersey (known as Square 737), "will commence Stage II PUD upon transfer of District land in early 2008."
1111 NJ UPDATE: Amazingly, just a few hours later, another document popped up with additional information on 1111 New Jersey: it's for the Dec. 13 WMATA board meeting, a request to execute the sale announced back in June of the 5,612-sq-ft WMATA land at New Jersey and M to "NJA Associates" (aka Donohoe). And it describes the "new" 1111 NJ thusly (emphases mine):
"The Developer proposes to combine the WMATA property with an adjacent 16,406 sf developer-owned site and develop an office building with ground floor retail. Its current proposal to the District of Columbia Zoning Commission is for an approximately 211,000 sf building, a portion of which cantilevers over the WMATA property. At ground level, the proposal includes a wide plaza surrounding the Metro entrance, consistent with the Anacostia Waterfront Initiative Framework Plan. The Developer will make modifications to Metro facilities at its own cost and subject to WMATA approval. At present the modifications are expected to be limited to adjustments to the vent shaft and new paving in the plaza area. The existing entrance canopy will remain. The entrance will be protected during construction. The Developer has stated that it does not currently anticipate any need to close the entrance during construction."
WMATA is selling the land for $2.3 million plus an unnamed additional payment if the approved project is larger 206,000 square feet.
 

A rumor that's been floating around for the past few weeks is apparently true--sources are telling me that the St. Matthew's Baptist Church, on the southwest corner of New Jersey and L, is being sold. The sale hasn't been finalized yet (though there is a contract), and there's no word on what the sale price is or when the church would vacate; they're now looking for property in Prince George's County where they can build a new church. The property is assessed at just under $4.5 million, though the person I talked to cited problems with parking for members of the congregation (and knowing that it's only going to get worse) as the reason for leaving, not some sort of big payday.
In a real surprise, my sources are indicating that it's not being sold to Donohoe, which has reportedly tried in the past to acquire the church property as part of its plans for 1111 New Jersey Avenue. Given this, I wonder if there are further moves in the works at this corner. And then there's the question of whether Ann's Beauty Supply and Wigs next door to the church will stand fast, having arrived on L Street not that long ago after having to leave Waterside Mall in Southwest.
UPDATE, 11/24: Hmmm, well, now I'm hearing a different it's-not-Donohoe name than what I heard/posted yesterday, from a different source, and so I'm deleting the original reference just to try to be safe. Perhaps we'll read about it in the papers eventually. Grrrr, I hate boo-boos!
UPDATE, 11/26: Oh, for crying out loud, I was right the first time. (In other words, I was wrong about being wrong.) Additional checking has confirmed that is indeed the Ruben Companies, owner of three of the four corners at South Capitol and L (including 1100 South Capitol) that is buying the church's property.
 

To those who ask me from time to time when the Department of Public Works' operations at the old trash transfer station at New Jersey Avenue and K Street might be closed down, I offer this quote from the Post: "As a result of a hearing granted representatives of the East Washington Citizens' Association, the Commissioners yesterday announced that they would endeavor to change the location of the present garbage transfer station, and K Street and New Jersey avenue southeast, provided the arrangement does not call for the expenditure of too large a sum of money." Said M.I. Weller, vice president of the association, " '[O]ne or two improvements of large dimensions are in progress in our section of the city, and really we can spare the garbage transfer station.' "
Oh, wait. This report is from April 7, 1905.
Neighbors protested about the "noxious fumes" for many years, and finally an "odorless, dust-free" station was built, opening in July 1949. That building still stands on the site today, though it hasn't been used as a trash transfer operation for some years.
(Plans from the current century call for a mixed-income 322-unit apartment building to be built on the site as part of the Capper/Carrollsburg Hope VI public housing redevelopment, but construction probably won't start before 2010. This site has also been eyed as a possible location for parking as part of the shoe-horning of MPD into the Post Plant, which may or may not still be happening in some fashion.)
More posts: Trash Transfer Site/DPW, New Jersey Ave., Rearview Mirror
 

Thanks to reader G. for giving me a heads up on the work being done along New Jersey Avenue to put in new sidewalks (specifically across the street from Capitol Hill Tower and alongside the DPW Trash Transfer station north of K). DDOT tells me that this is part of the planned South Capitol Streetscape improvements that we'll be seeing over the next few months along the streets between New Jersey and South Capitol. I don't have many details yet on exactly what the improvements will entail and the exact locations, but I think we'll get some additional information from next week's DDOT briefing on the Douglass Bridge Extreme Makeover. These may not be fabulous artsy-fartsy sidewalks in this phase, but concrete is better than dirt pathways--and when the blocks get redeveloped, the developers will be responsible for bringing their sidewalks up to Anacostia Waterfront Initiative standards. The new New Jersey Avenue sidewalks are being done all the way north to the freeway, to make it easier for folks to walk to Capitol Hill--and by extension, to the Capitol South Metro station (take note, ballpark-goers).
More posts: New Jersey Ave.
 

Today the Board of Zoning Adjustment heard an application by Donohoe to waive the rear-yard requirement for its planned 146,000-sq-ft office building at 1111 New Jersey. I don't want to get too far into the weeds of it all, but basically this rear "yard" requirement was actually applying to the airspace along the alley between L and M above the project's first floor (because by right the first floor can run right to the alley line). Donohoe's position was that, by allowing them to build to the rear property line on all floors, they could build an 11-story building with higher ceilings on the 1st floor (16 feet), making the space far more desirable to prospective retail tenants. If they were unable to use that airspace, they would instead build a 12-story building of the same square footage, but with only 12-ft ceilings on the 1st floor (and shorter ceiling heights on the other floors). Although ANC 6D opposed this application on the grounds that it lacked a community benefits package (which is not required in a "by-right" project), the BZA felt that the higher ceiling heights on the first floor that would be allowed by granting this special exception, and the resulting higher-quality retail prospects that could be drawn to the building, could be considered to benefit the community. And with the pastor of St. Matthew's Church (which sits directly to 1111's north) saying that he is in favor of the project, and with the Office of Planning, the Capitol Hill Historical Society, and the neighboring developments (100 M Street and Onyx on First both sit across the alley from 1111 New Jersey) supporting it as well, and with other required standards of the rules met (sufficient distance between 1111 and adjacent structures, sitelines sufficiently separated, and adequate off-street parking [114 spaces], loading docks, and delivery space), the BZA voted 5-0 to approve this application. I've been told that this project could begin construction this summer.
UPDATE: Actually, I now hear that the project may not start until closer to the end of 2007. I don't know for sure, but perhaps the schedule is also being impacted by an upcoming item on the WMATA Planning, Development and Real Estate subcommittee agenda for June 14: "Approval of Developer Selection and Term Sheet for the Navy Yard East Entrance", which is referring to a joint development solicitation proposal back in September 2006, looking to develop the 4,400 square feet owned by WMATA above the Navy Yard station entrance at New Jersey and M with some combination of a public plaza at ground level and development above it. So we shall see....
 

Donohoe's planned 146,000-sq-ft office building at 1111 New Jersey Ave. (on the west side of New Jersey between L and M) takes a step forward tomorrow with a hearing in front of the Board of Zoning Adjustment--they're looking for a special exception for a waver of the rear yard requirement, which apparently would allow them to put up an 11-story building with higher ceilings as opposed to a 12-story building with lower ceilings if they have to keep the rear yard. ANC 6D voted in April to oppose this application, but more because the developers are not providing a community benefits package than any issues with the application itself. The hearing should be webcast, and I'd tell you what time it's scheduled for, but the Zoning Schedules and Agendas site has been down for three days now, so I can't look it up to confirm.
UPDATE: The BZA site is back, so I can tell you that the hearing is the third item on the agenda for the session that begins at 9:30 am.

More posts: 1111 New Jersey/Insignia on M, New Jersey Ave., Square 743N, zoning
 
51 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6