Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: staddis
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


195 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 20
Search JDLand Blog Posts by Date or Category

On Monday night the Zoning Commission considered two Near Southeast cases on its consent calendar. I wasn't there (having chosen to go to the ANC meeting scheduled for the same time), and the ZC's web feed experienced technical difficulties, so I'm posting some bare bones info that folks at the meeting have been nice enough to pass along.
Monument Realty asked for 22 "minor modifications" to its previously approved design for the under-construction eastern side of Half Street. According to the Office of Planning report, the changes mostly centered on adjustments to the exterior architecture and the layout of the residential component. The most noteworthy change request is probably switching from a multicolored LED screen at the Metro entrance at Half and M (which WMATA turned down, apparently) to a backlit laminated glass panel. Also, nestled deep in the OP report is a request to modify the design for the hotel windows because the "hotel operator has pulled out" -- early on, the word had been that W Aloft would be running the midblock hotel on Half Street, but apparently this is no longer the case; I've heard nothing on any new operator. You can read the report to see the other requested changes. Though this was on the Zoning Commission's consent calendar, and the commission acknowledged that the changes are small, they still wanted to see some renderings showing the befores-and-afters of the proposed changes, and have scheduled a special public meeting for Jan. 28 at 6 pm to consider the request.
Now that the eastern side of Second Street (running along Canal Park) is considered "re-opened" (it's a long story), the developers of 250 M Street are requesting to base the office building's height on the width of Second Street, which is wider than M Street. This would allow 250 M to go up to 130 feet, which apparently is the same as the height of 1100 New Jersey on the west side of the park, although apparently the building's planned square footage would actually decrease slightly which would increase the total square footage to 233,405. Though this was on the consent calendar, the commission asked the Office of Planning to submit a report on this, and there will be a public hearing.
UPDATED to fix an error about 250 M's proposed new square footage.
 

Having pledged to pace myself a bit better over the next three months so that I don't have to cover Opening Day from a padded room, I'll be posting the results of Monday night's ANC 6D and Zoning Commission meetings in drips and drabs over the next few days. So stay tuned, especially if you're interested in Florida Rock, or Diamond Teague Park, or Monument Realty's projects north of the ballpark, or 1111 New Jersey, or 250 M Street.
This of course means that all the local media outlets checking in at JDLand looking for leads and tips will have to wait too. (The information is all free, of course, but some small hat tip some day would be nice. Although I do enjoy being an assignment editor of sorts....)
 

Just a quick couple of links:
* The Washington Times profiles Steve Cohen of Opus East, who's been promoted to vice president of real estate. Opus's two current projects in the District are both in Near Southeast: 100 M Street and 1015 Half Street (not "1015 F" as the article says). The article touches a bit on how Opus plans to handle any slowdown in the commercial real estate market.
* A few days back the WashBiz Blog on washingtonpost.com featured a quick overview of Monument's Half Street project and an interview with the company's executive vice president, F. Russell Hines. No news in the piece to any regular readers of JDLand--it mentions Monument's lawsuit against WMATA over the Southeastern Bus Garage, but gives no status report on where it stands.
* This is also a few days old, but I can't let an entry go by without mentioning parking, so here's a link to a WUSA piece from last week that, in a stunner, finds baseball fans who are upset at the idea of Tommy Wells's Performance Parking Plan, given that it might prevent them from parking for free on neighborhood streets for three-plus hours 81 nights a year.
 

I've been told by "someone with knowledge of the Ballpark District" that demolition of the old buildings on the Willco Construction site bounded by M, N, Cushing and First is scheduled to start on Monday. And that a temporary surface parking lot is slated to be built in this spot, just north of the eastern garage at the ballpark. We shall see if this does indeed come to pass....
UPDATE: Seeing that there's no bulldozers in action on this block today, I'm officially never believing a start-of-demolition rumor ever again. Though I did see heavy equipment parked near one of the buildings a few hours ago.
Comments (0)
More posts: parking, staddis, Nationals Park, Square 701
 

Agendas are out for two public meetings on Monday night (Jan. 14) that have Near Southeast items of interest:
*ANC 6D's agenda includes presentations and requests for support on the following: a new request for an alley closing on the southern end of the block bounded by Half, M, N, and South Capitol (B17-0552, "Closing of a Public Alley in Square 700"); the Capitol Gateway Overlay Review for 1111 New Jersey Ave., which will be at the Zoning Commission on Jan. 31; and new design/modified second-stage PUD for RiverFront on the Anacostia (Florida Rock), which is expected to go to the Zoning Commission in the next few months. The meeting is at St. Augustine's Church, 6th and M Streets, SW, at 7 pm.
* The Zoning Commission will hear requests for "minor modifications" to William C. Smith's 250 M Street project and Monument's Half Street project; alas, I haven't been able to find out what these modifications are. That meeting is at 6:30 pm at 441 Fourth St., NW, and is also available via live webcast.
I should also mention here that last night the Zoning Commission voted preliminary approval of a series of text and map amendments at the Yards, most of which are far too dull for even me to get into; read the hearing announcement if you want more details.
 

It was time this weekend to catch up on photos for a bunch of locations, including the most aged batch of them all, the views of the ballpark's northern footprint along N Street, which haven't been updated since September, so you can now have your fill of photographs of imposing parking garages. The curbs and historic streetlamps are now in, and N Street has been paved from South Capitol to Half, and it looks like the paving east to First isn't far behind. So even though the half-shadow half-sunlight conditions weren't the best to work with, I took full updates of the First, Half, Cushing, and Van intersections along N, all of which you can see here.
One thing that really struck me today for the first time is just how wide First Street is becoming, as you can see in this batch of northward-looking photos. I also saw that all the businesses on the west side of First south of M have now vacated--as you can see above, it's odd to see those old about-to-be-demolished buildings with sparkly new sidewalks and streetlamps in front of them.
I also trudged around the road construction along First Street north of M as best I could to update photos of 100 M, Onyx, and 70/100 I, and also got a good new batch of 55 M photos as well as the always showy views from the freeway at South Capitol. And I finally got the last set of old Capper Seniors photos to show that the building is indeed gone. And heaven help me I even took a photo of the new sign advertising the Square 696 project, and also a few shots barely showing that work started this week on the first Capper parking lot at Third and I (because there's nothing more exciting than documenting the construction of a parking lot). There's just too much change, and I couldn't stop until it had all been documented! Aaaiiiieeeeee!!!!
For those of you brave enough to try, here's all the photos from the past two days on one page. (Thank heavens I've done a lot of work over the past year or so to automate the update process as much as possible.) Don't forget to click on the icons to see all photos of a location over the years....
 

The Washington Business Journal has a huge "Looking Forward" piece in today's print edition, and its first prediction is this: "The place to be in D.C. in 2008 will be the Southeast waterfront." It then gives a quick run-down of what's going on (some baseball stadium project leads the list), and references the expected lack of amenities near the ballpark until Monument Half Street opens in 2009. Also: "Real estate insiders will be watching to see when the first major private office tenant lands in Southeast. Both CNN and National Public Radio have short-listed sites, but no company has committed to pioneering the private office sector yet." And: "Major work is expected to get under way in 2008 at The Yards, which Forest City Washington is developing in the area formerly known as the Southeast Federal Center. The first offerings at the 42-acre project will be residential and retail, with projects slated to open in 2009." But JDLand readers knew all this already....
 

In today's attempt to read the Building Permit tea leaves, I see that a plumbing and heating company has received a slew of permits along N, Cushing, and First streets, where Willco Construction is planning a 500,000-square-foot office/residential/retail project. I'm not an expert in these things, but a few years of watching the flow of permits has shown me that plumbing and heating companies get permits to shut off the pipes prior to buildings being demolished, and these addresses do have raze permits approved for them. Details about the Willco project are few, and there's been no announcement of any start date.
And now that 55 M's construction has mostly obscured these lots from the view of the Half Street web cam, I'm hoping those of you at NGA and 80 M Street with bird's eye views of these spots can drop me a line if you see any demolition happening.
Comments (0)
More posts: staddis, Square 701
 

In case you've already grown tired of the ballpark photos I posted on Monday showing the eastern and southern sides of Nationals Park, I've now updated the South Capitol Street images, too. (The northern views will have to wait until the reconstruction of N Street eases.) The main Ballpark Exterior Photo Gallery is now in pretty good shape after a short span of neglect (but as I said the other day, I think I needed the break).
I also took some new photos to capture the progress at 55 M Street, plus the completion of demolition at 1345 South Capitol.
If you don't feel like clicking around on all those links, here's all the photos I've posted in the past week. Try not to be blinded by those blue skies!
A few other items of note: The BP Amoco station on the northeast corner of South Capitol and N has fences up around it--I can't believe no one let me know! It's owned by Monument Realty, and I haven't heard about any near-term plans for the site. This leaves only one gas station in Near Southeast--the Exxon way over at 11th and M. There used to be three gas stations on South Capitol, now there aren't any. (And I've lost yet another source for my Gas Prices page. Waah!)
Also, new fences have gone up around the 1015 Half Street site, taking up one lane on K Street and on Half Street. Some exterior work was done to the DC Foreign Car building, but the little building is still there. For now.
I hope to get updated photos of 70/100 I and the pile of rubble that used to be old Capper Seniors within the next week. There's just too much activity to document these days--I've got to break it up into manageable pieces....
 

I was trying to take a few days off, but an idea popped into my head during an attempted nap that I just couldn't ignore. So say hello to a new page: my Nationals Park Frequently Asked Questions and Rumor Destruction Page (call it the Ballpark FAQ for short). I tried to pull together the questions that I hear and see the most often, from basics about the park's location to all the questions about Metro, parking, and entertainment options around the site. I'm going to keep it updated as events warrant--I know there's going to be a flood of information from the team and the city about how to get to the ballpark as Opening Day gets closer, which will allow many of the FAQ's "specifics haven't been announced" answers to be fleshed out with actual details. It also doesn't address much of the in-the-weeds detail of baseball at the ballpark--I'll leave that to Nationals fan sites.
This FAQ is now the default ballpark page, and replaces the old Stadium Renderings gallery, which has now been moved to a new page (after all, renderings are less important when the dang thing is just about three months away from opening!). So if your bookmarks have changed, apologies. The exterior and interior stadium photo galleries are still in their proper places.
(As for why on earth I didn't do a page like this a loooooong time ago, I plead insanity. Yeesh.)
Comments (0)
More posts: Metro/WMATA, parking, staddis, Nationals Park
 
195 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 20
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.