Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: 225 Virginia/Old Post Plant/200 I
See JDLand's 225 Virginia/Old Post Plant/200 I Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


75 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8

Isn't it great that the icky humid cloudy weather of the past few weeks finally broke? Aren't the skies glorious and blue? Does that mean I finally got to get out to take some photos? Why, yes!
First up are new photos from ground level at Canal Park, including the new L Street streetscape and the sculptures:
If you're big on Canal Park, you may also be interested in the many before-and-afters in the Canal Park Expanded Photo Archive, which leads off with the first decent bunch of photos from 2nd Place and L Street since construction started on the park many moons ago and then takes you on a before-and-after walk around the park's perimeter.
And then there's the progress on L Street between 3rd and 4th as the Capitol Quarter townhouse construction continues to wrap up:
I also added a few sunny-day Boilermaker Shop exterior photos and a shot of the hole in the ground at the Twelve12 apartment/Teeter project, because the ones I took on back Gloomy Thursday, when I got to go inside the Boilermaker building, drove me nuts:
External construction has pretty much wrapped up at 200 I/225 Virginia/Old Post Plant/Old Star Plant, especially on the south side of the building, facing Canal Park. There was a ribbon-cutting on Friday for the DC Commission on the Arts and Humanities gallery in the building's new lobby on I Street, but unfortunately I wasn't able to make the event. Hope to get photos inside before too long. In the meantime, you'll just have to look at the outside, and compare it to the White Monolith that it used to be:
If these all aren't enough for you, you can spend some time in the Photo Archive, where you pick the intersection you want to see and then you can see the entire range of photos I've taken for all angles or just the ones of your choice. You may even end up in the Photo Archive without realizing it, if you click on the Click to see all available photos of this location. icon on any of the pages above, which also will give you the full range of photos for that angle. It's pretty much the Near Southeast equivalent of heading down the rabbit hole.
Comments (3)
More posts: 225 Virginia/Old Post Plant/200 I, Boilermaker Shops/Yards, Canal Park, photos, The Yards, Twelve12/Teeter/Yards
 

Because of a need to burn off some calories before digging into my "Reeseter's Bunny" (milk chocolate-coated peanut butter bunny, which the label says is four servings [ha!] at 180 calories per), I did my usual wanderings this morning to grab updated photos around, Capper, 200 I, Canal Park, and the Boilermaker Shops. Alas, I did not hide any Easter eggs in any of these shots, nor did I find any.
The framing and Tyvek-ing is underway on 3rd Street south of L, in the shadow of the 300 M Street office building, as Capitol Quarter continues its march toward completion. I also took a lot of photos of other CQ Phase II blocks, so spend some time in the Capitol Quarter Phase 2 Expanded Photo Archive (and scroll down a bit) to hop through the many (many!) before-and-afters.
Then there's the Boilermaker Shops at the Yards, where some work was being done even on Easter Sunday. The walling off the interior space for the different tenants has begun, with the studs visible--and some drywall has even gone in on the mezzanine level, as seen at right, in a view from 4th Street, through what will be the Bluejacket space.
The work is on-going at Canal Park, but continues to not be terribly exciting from a photographic standpoint, unless you're wowed by images of new curbs. But the Canal Park Expanded Photo Archive can take you for a walk around the park's perimeter to see the current views, if you don't see it every day. (I also like my barbed wire shot [above right], the result of desperation after being without photos from the east side of 2nd and L for a very long time now. But, no, I didn't jump the fence.)
I also enjoyed being watched very closely by a USDOT security guard with a clipboard as I took photos of the park's progress from the south side of M Street. "What are you taking photos of?" she finally asked, trying to sound stern. "Stuff," I replied, as I smiled and kept walking.
There's also updated shots from 225 Virginia/200 I (seen at right), with the landscaping now starting to go in.
If you want to see today's entire batch (213 of 'em), here they are, remembering to click the fun little Click to see all available photos of this location. icon if you want to see the entire range of photos for a certain location. If you want even more new-ish pictures, here's photos I took around 1st and Half Streets on Tuesday, to get the Fairgrounds exterior into the official archive.
Now I need to go find that peanut butter bunny. I think I earned it.
Comments (7)
More posts: 225 Virginia/Old Post Plant/200 I, Boilermaker Shops/Yards, Canal Park, Capper, Capitol Quarter, photos, photos, The Yards
 

With Pictures:
* Shipping containers have been arriving at the Fairgrounds (Bullpen) site. (They say there's going to be a "preview" event on March 30--looks like a lot of work to do in eight days. But the real opening is supposed to be in time for the Nats' season opener on April 12.)
* Greenery is arriving at 200 I/225 Virginia, and the sidewalks are done. Apparently the fences will be moved back sometime next week to keep the building perimeter secure but to allow the sidewalks to be used. (In other words, the "street sidewalk" will finally disappear.) There should also be repaving and crosswalk striping around the site coming in early April.
Without Pictures:
* Framing is racing along on the stretch of Capitol Quarter townhomes on 3rd south of L.
* Curbs are going in on 2nd Place next to Canal Park and the pavilion.
* The cherry trees in the Center Field Plaza at Nats Park are budding, but don't look on the verge of popping yet. Perhaps they can hold on until April 3.
Elsewhere:
* Mark Batterson says the demolition of the Miles Glass building and the garage next door on Virginia Avenue will happen next week.
* Yesterday we were talking about the possibility of a little BOOM, but here's what might happen 'round these parts if there's a really BIG BOOM.
* The Post writes about the neighborhood as part of the big Mega RealEstate focus on walkable communities, and keys in on the fact that the area has a number of different names. (For the record, it's not like I made up "Near Southeast"--I was just following the city's lead.) Within a few hours, though, Greater Greater Washington may have solved the problem by pointing us to the area's late-19th-century moniker: "Bloodfield." Wouldn't that work great for ballpark headlines? ("Phillies Dismembered at Bloodfield.")
Anything else folks are seeing?
Comments (11)
More posts: 225 Virginia/Old Post Plant/200 I, Fairgrounds/Bullpen, Canal Park, Capper, Capitol Quarter, Nat'l Community Church, square 906
 

Take a gorgeous Sunday, add an obsessive-compulsive need to document all the change underway, and what do you get? Nearly eight miles of walking and a shameful number of new photos.
The Foundry Lofts building is all but done, with only the retail spaces left to be built out, so I took a bunch of "after" photos that will probably last for a while. But that new Potbelly sign sure stands out! I also pressed my nose against the glass to peek inside the sandwich shop's space--it sure doesn't look far from opening.
Embarrassingly, I haven't had a camera in hand on the Navy Yard's portion of the Anacostia Riverwalk since 2004. (I'm always worried they're going to toss me in the brig as a security threat, especially after a run-in a few years back where I was chased down by both a gate sentry and the DC police after taking photos of the Hull Street gate from across M Street.) But I pushed forward yesterday and got a bunch of new shots that I've added to my Navy Yard page, taking care to demonstrate to the many security cameras that I was photographing the river and not the installation. (Don't miss the especially cool before-and-after of the gate to the Yards Park.)
I will probably be creating a separate Riverwalk page before too long, but not today.
Along 11th Street at N and M, photos are more notable for what's not there anymore, as the demolition of the embankment for the old outbound RFK ramp is done, and the path of the new ramp from M Street for traffic headed to the outbound 11th Street Bridges freeway traffic becomes more obvious. Also see this picture of the work on the 11th Street Local bridge, showing the demolition of part of the old outbound bridge approach, which has to be done before the new local bridge can hook up with 11th Street. (You can see it as well in my O Street before-and-afters, if you figure out what to look for.) Check my 11th Street Bridges photo page for more images.
Then there's Canal Park, where I mainly took some new photos of the pavilion under construction near M Street, since photos of digging and ground work don't quite rise to the level of "interesting." I also hit most of the angles for the Boilermaker Shops, as well as for Capitol Quarter Phase II, where the security guard expressed concern about my actions (I need a laminated Photography Approved card or something). And I wandered the 225 Virginia/200 I perimeter.
If you're a glutton for punishment, you can browse the 267 pictures from this trek that are now in my Photo Archive, using the links to see before-and-afters.
 

I guess I'm not unhappy that there's not much to pass along right now, given the firehose of content sprayed from these parts last week. So, while we all wait to find out whether Prince Fielder is going to be a new neighbor, here's the best I can come up with:
* The Atlantic Cities writes a paean to the Yards and the Yards Park, noting that Washington "is finally getting a green waterfront to be proud of," after years and years of poor waterfront access throughout the city for residents.
UPDATE: I'll toss this in, since I'm short on content: a writer at the Hill is Home is bummed that the Lumber Shed is going to be enclosed for retail space (and Forest City's offices upstairs), and is taking a poll to find out who does or doesn't agree.
* Exterior work continues to wrap up at 225 Virginia/200 I, with the new parking deck at 3rd and I mostly completed. Visitors to the building will park on the deck's upper level, via an entrance on 3rd just south of Virginia, while staff will enter the deck's lower level on I Street; there is also employee parking in the building's basement. I imagine traffic on 3rd is going to get even more interesting when the building opens to three city agencies later this year.
Comments (1)
More posts: 225 Virginia/Old Post Plant/200 I, The Yards, Yards Park
 

Yes, it's time for another batch of updated construction photos. This is a tough stretch of year to take these--the sun never gets very high in the sky, so anything facing due south is about impossible to get without glare. And, for places like Canal Park, it's hard to even get some locations out of the shadows long enough to get a photo that you can decipher. But you can see (below left, and on the project page) a couple of shots of the progress on the park's pavilion where the Park Tavern restaurant will be housed, along with plenty of shots vaguely showing the other ongoing ground-level work. Meanwhile, at Capitol Quarter (below right), they continue to just zip right along, with framing now well underway on the north side of L and around up 4th, and prep work for foundations continuing in the project's final block, on the south side of L.
In the Renovation/Rehabilitation portion of the tour, we have a few updated images of the Boilermaker Shops (above left), another building that's tough to shoot in winter, even more so when there's not much of it other than steel beams at the moment (though they have recently been painted white). Meanwhile, 225 Virginia/200 I is coming pretty close to the end of its exterior renovations, though work inside will continue in preparation for the arrival of three DC agencies later this year.
There isn't much new to see of Lot 38 Espresso (aka the Little Red Building 2.0, above left), which the grapevine says is now shooting for a mid-December opening. (But, really, at this point, it opens when it opens--the last batch of permits and approvals is always slow going, and I bet the owner wants it open even more than you do.) I also took a bunch of shots of the former National Geospatial Intelligence Agency building at 1st and M (above right), not because there's been any changes to it, but because I really enjoyed finally being able to aim a camera at it without having guards reaching for their guns. (Nyaah! Nyaah! Click! Click! Click!)
I came home with 438 new photos (yikes), and you can browse the 180-plus I decided to upload to the online archive here. (Yes, it's true, you don't actually get to see every photo I've ever taken. Which is probably for the best.)
Remember to click the icon to see the entire range of photos for any location, while the project pages linked to above are your best bet if you're looking for paired before-and-afters and/or narrated tours.
And, in case you didn't see my tweet or my late-night update, the residential/Teeter project at 4th and M got all the dotted i's and crossed t's I mentioned in my initial post, and is officially now considered by Forest Ctiy as "commenced." (I just can't call it 1212 4th Street yet. Doesn't really make the location pop as well as "4th and M.")
 

October may be my favorite month for taking photos of Near Southeast--if you can get a bright clear day, the just-starting-to-change trees give a nice additional color pallette, plus the sun still gets high enough in the sky to (mostly) allow for southward-facing photos. It was eight years ago I first found this out, as you can see in this October 2003 gallery--there's still a lot of shots where clearly I hadn't found my routine yet (and you can see my dirty windshield here and there!), but there is still something special about the light in them. And looking at how different things look is kind of cool, too.
There isn't really all that much to take photos of in the neighborhood right now, especially since I did a full set back in September, but I did take a quick walk through Capitol Quarter and over to 225 Virginia/200 I to get updated images:
The old Post Plant monolith ain't quite so monolith-y anymore, is it?
You can browse the expanded photo archives for 225 Virginia and Capitol Quarter Phase 2 for lots and lots of images (with today's shots marked by the icon, as always), or visit the Capitol Quarter and 225 Virginia/200 I project pages for a more "narrated" tour.
There's apparently been some concern by Capitol Quarter residents about the 200 I construction, but representatives of Stonebridge gave an update to them saying that "base building work" (i.e., outside stuff) will be completed in the next four months, which seems pretty much on the schedule announced when work began back in February. Interior work will begin in December, with DC agencies expected to begin moving in around June 2012. But 3rd and I streets will probably be a bit of a mess as utility work and the construction of the single-deck parking garage continue. My post from March on the parking garage configuration may also be of interest, if you haven't been following along, as might all of my 225 Virginia/200 I posts, going back many years....
And, once you're finished wandering through these shots, how about filling out my Reader Survey? (I PROMISE that this link actually works!) It's only going to be up for a few more days....
Comments (0)
More posts: 225 Virginia/Old Post Plant/200 I, Capper, Capitol Quarter
 

With raze permits for the old structures along 1st Street SE between K and L finally approved in mid-June, the days were truly numbered for the Market Deli and its neighbors, and today the demolition got underway, with most of the rear section of the Deli's structure knocked in. Fences are up all around the 1st Street structures, which are all owned by Akridge, and with this initial wrecking underway I imagine it won't be long until the five buildings are added to my Demolished Buildings Gallery, as entries 161 through 165.
There's a few more images here, showing that the demolition isn't quite so obvious from 1st Street (yet). Also, hopefully the folks who have been tending to the cats living in the abandoned building can report in as to their fate. (I heard a rumor that some kittens were removed today, but would defer to an update from anyone with more knowledge. UPDATE: In the comments of another post, reader jenniferp says that five very young kittens were indeed captured this morning, but there are several more still on the loose.) And, if you haven't been following along on the tale of the Market Deli for the past few years, here's some enlightenment.
And, because it would have been silly to wander down there in the ghastly heat and humidity and walk past a whole lot of spots where I needed to take updated photos, you can see the latest progress at 225 Virginia (aka 200 I Street) and the second phase of Capitol Quarter, where framing is being completed on the last portion of its first block, along Fourth Street.
Comments (5)
More posts: 225 Virginia/Old Post Plant/200 I, Capper, Capitol Quarter, marketdeli, square 740
 

While the number of photos I took while in Spain and Italy should have been enough to tide me over for quite a while in the camera department, the guilt at not having taken Hood photos since APRIL (!) shoved me out the door on hot and hazy Sunday morning (ick) for a walk around the major activity zone between 2nd and 4th Streets.
The re-dressing of 225 Virginia/200 I/Old Post Plant/Old Star Plant continues, with most of the north face now sporting the building's new look; some windows have even been installed on the east front, facing 3rd Street. It's expected that the exterior work will be done by early 2012, with tenants from three city agencies starting to move in about a year from now. My 225 Virginia project page has a guided tour of the project, or you can take the virtual walk-around-the-block for a bigger batch of before-and-after photos to watch the building's transformation from Big White Monolith to 21st century office building.
In the meantime, work is speeding along at Capitol Quarter, where the block bounded by 3rd, 4th, I, and K (bisected by the soon-to-be-birthed 3rd Place) has construction in all phases, from the nearly completed houses at 3rd and I to the new framing at 4th and I, and foundations now poured at 4th and K. And, as briefly mentioned a few days ago, the trailer that housed the original sales center at 4th and L is now gone. If you just want the short version of Capitol Quarter's second-phase transformation, check out my Capitol Quarter project page, otherwise you can take the virtual walk around the blocks now under construction for a boatload of before-and-afters.
I also took some photos of the northern perimeter of Canal Park, but pictures of fences and digging equipment are never terribly exciting.
As always, remember that the Click to see all available photos of this location. icon on any page gets you to the full batch of photos I've taken at any location. Or, if you're interested in only a certain location, you can use my Photo Archive map to get right to it. The entire set of 178 photos I posted today can be seen all at once, too, if you're so inclined.
(And, as an aside, let me send my huzzahs to Microsoft for getting fixed in IE9 whatever it was in IE8 that would cause the browser to stop displaying local hard drive images after a certain amount of page loads, causing me to having to restart the dang thing eight or nine times during each photo archiving stint. [It's pretty much the only thing I still use IE for.])
Comments (0)
More posts: 225 Virginia/Old Post Plant/200 I, Canal Park, Capper, Capitol Quarter
 

I'm back in DC, having spent 11 wonderful days in Madrid, Barcelona, and cruising across the Mediterranean to Pisa, Florence, Rome, the coast south of Naples, and Mallorca. Needless to say, while I checked in on the news back home from time to time and tweeted an item or two if the timing was right, I wasn't following developments closely, and I'm pretty out of the blogging groove at this point. So I'm going to start back slowly with some easy items.
* Redistricting: The city council voted Tuesday to approve a redistricting map that, as expected, keeps Near Southeast in Ward 6. This continues to make Marion Barry extremely unhappy, and the Examiner reports that he'll be "asking U.S. Attorney General Eric Holder to open a Justice Department review of proposed new D.C. ward boundaries because, Barry says, they violate residents' civil rights." There's still a final vote to be had on the plan, probably on June 21. As for the last-minute changes that ended up keeping much of Ward 6 intact (moving Reservation 13 to Ward 7 instead of other areas), you can read Tommy Wells's blog for more details.
* Riverwalk: The Navy Yard announced last week that its portion of the riverwalk along the Anacostia River, running from the 11th Street Bridges to the Yards Park, will now be open from 5:30 am until "official sunset," seven days a week and including holidays; though there will still be closures as needed, which are announced on the Navy Yard Riverwalk Twitter feed. (I admit that I got a bit of a kick passing along this news via Twitter while riding on a train north of Rome.)
* DPW Move: The council passed emergency technical legislation on Tuesday that allows Capper PILOT funds to be used to build a new location for DPW operations in Northeast, which means that they should be moving from the 2nd and K site this fall (before "leaf season").
* Ward 6 Family Day: Tommy Wells's yearly event for Ward 6 residents will be held on Saturday, June 25, and will be at the Yards Park for the first time. It's from 1 to 5 pm, with "free food, live music, games and activities for the whole family as well as raffles featuring gift certificates from local businesses and sporting memorabilia from the Wizards, DC United and Washington Nationals."
* ANC 6D has its next meeting on Monday, June 13, at 7 pm at Arena Stage. The agenda is light on Near Southeast items, with only a resolution by David Garber about Near Southeast bike stations and requests by Cornercopia and Harry's Reserve to be exempted from the ban on the sale of "singles."
* Food Truck Festival: Bo Blair, the owner of the Bullpens and the organizer of Truckeroo on June 3, said in an e-mail that the event was a "massive, incredible success," with somewhere between 17,000 and 18,000 attendees and "zero problems." The next date for the event will be announced soon.
* Construction and Destruction: Construction has stalled on the Little Red Building v2.0 at 2nd and L, which ANC commissioner Garber says is a "building permit issue that is in process of being resolved - construction should start back 'soon.'" Meanwhile, the "re-dressing" of 225 Virginia is well underway, with the new exterior walls being hung on the north side of the building. And if it hasn't already happened, the trailer that was the original sales office for Capitol Quarter is being torn down, since construction of townhouses is now underway on that block. (Photos to come, at some point.)
* The Yards on Facebook/Twitter: I kind of stumbled across these (never saw any announcement about them), but the Yards now has an official Facebook page (which is available on Twitter, too) along with a separate one for the Foundry Lofts (its Twitter account is protected, though).
UPDATE: And, since this just came across Twitter: Dan Steinberg reports that Shake Shack and the other new Nats Park restaurants will open next Tuesday, the beginning of the homestand vs. the Cardinals.
 
75 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8