Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Square 699n
See JDLand's Square 699n Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


96 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10

They haven't officially announced its launch, but I happened to wander by this evening and found that the Velocity Condos official web site is now live. It's got a sign-up form if you're interested in this 200-unit building at 1st and L, and a long list of the planned amenities, but no drawings of the building (you can see one of those along with more details on my own Velocity Condos page). The new site also says that sales center (at Half and K) will be opening soon, and it will have a "detailed scale model" and a "furnished model home right in the sales center." Digging has just gotten underway, and delivery is expected in 2009.

More posts: Square 699n, Velocity Condos
 

I've been posting over the past couple days all sorts of new photos: first off, there's the usual update to the exterior views in the Stadium Construction Gallery's main page and the more detailed north-south-east-west pages. The big change is the arrival of the scoreboard steel on the First Street side, which has also helped to give the stadium its more rounded feel when looking at it from the north. And, if you know what you're looking for, you can see the first real shots of progress on the west parking garage at Half and N, although it's still kind of hidden by trees and construction equipment. There's also my final shots from up on the South Capitol Street viaduct north of Potomac Ave. (waaaah!).
You can also see some new shots from inside the stadium, where you can get a better view of the scoreboard's progress and also of the seats being installed in right field. And the outfield restaurant is moving along as well.
I got a big surprise when I rounded First Street onto Potomac Avenue Saturday morning--all of the trees and growth on the south side of Potomac were removed this week, and the fence marking Florida Rock's property was moved back, in preparation for the widening of Potomac Avenue. I posted a bunch of new pictures showing the change on my Florida Rock page, but I'm not sure the photos do it justice. And of course it's about to change even more late this week when the Douglass Bridge Extreme Makeover starts.
And finally there's a lot of new shots from various locations north of M that I took on Thursday, catching things like a new "Capitol Yards" sign at 909 New Jersey, progress on the Velocity Condos sales center, and even the new sidewalks on the northern portion of New Jersey Avenue if you have x-ray vision. It's hard to see in the photos, but the vertical construction at both Onyx on First and 70 I Street is now right at street level, so in the coming weeks expect those buildings to burst on the scene. You can see all these non-stadium updated photos compiled here if you don't want to poke around on the project pages.
That ought to keep everyone busy during a slow vacation-tinged week....
 

It seems like it's been forever since I updated my Nationals Ballpark Construction Gallery, but I'm actually only a week behind my usual schedule--it's now updated with a pile of pictures I took during yesterday morning's beautiful weather, but beware that some of the showiest shots didn't get updated this time around thanks to actual construction going on at the construction site.
But to make it up to you, I have a whole new series of photos from inside the stadium so you can see stuff that the Webcam might not be showing real clearly.
And I've also finally expanded the construction gallery to include four additional pages of befores-and-afters (well, befores-and-durings) that have vantage points you don't see on my "main" gallery page. So knock yourself out looking at more shots from First Street, Potomac Avenue, South Capitol Street, and N Street. (There's also links to these new pages from the top of the main gallery.)
I also updated the Photo Archive with a fair number of photos from other spots around Near Southeast. You can see every new photo posted on this page; if you look really closely, you'll see a few shots that include the campers' tents at the Capitol Quarter sales office on 4th Street, as well as photos of the colorful new fence drapings that now surround the Velocity Condos site.
 

The folks at ADC Builders have passed along to me a new rendering of the Velocity Condos building planned for 1025 First Street (on the Square 699N block), which you can see on my Velocity page. Digging has now begun on the underground parking that will be shared by both this Velocity and its Phase II sibling; and within the next week you should see banners advertising the project hung on the fences surrounding the site. Work is continuing on the sales center trailers at Half and K, and it's projected to open in late July or early August. And the official web site, as I posted last week, is now "Coming Soon", but should be launched later this month. And, in answer to the question everyone *really* wants to ask, it's expected that the 200 units will start in the $300s; completion is expected in 2009. With all of this, I've now moved Velocity to a coveted "Under Construction" slot on my project directory.
So, on the New Development Tote Board, we're now loooking at 950 new residential units delivering in Near Southeast in 2008, and at least 800 in 2009 (not counting Capitol Quarter). And I can envision another 800-plus in 2010 (with JPI's 23 I Street and the residential projects at The Yards the likely candidates). Maybe someone will build a grocery store by then!

More posts: Square 697n, Square 699n, Velocity Condos
 

I'm not sure how often readers look at my DC Government Feeds box on the home page, but I wait with baited breath each day as they're released, hoping for some tidbit of news; and today there's a double reward in the Building Permits list.
First, at the Velocity Condos lot at 1001 First Street, a sheeting/shoring/excavation permit has now been approved, so that digging work can begin on the three-level underground parking garages that will serve the two condo buildings that are the first phases of this project on Square 699N, the block that used to be home to Wet/Edge and Club 55. (I'm trying to make the switch away from the 699N designation, so for a few weeks I'll be referring to both the old and new names.) The first condo building is scheduled for completion in 2009; we should see the official web site launching soon, and the sales center at Half and K opening this summer. If you can't bear to wait to see what the first building is going to look like, I've added a rendering to my Velocity page (scroll down a bit); there are others on ADC Builders web site, but you'll need to click on "Portfolio", then on "Planning", then on "L Street Project" to page through them. (Damn Flash sites!) These renderings have been there for a while, but I've only recently confirmed that they are indeed of Velocity; but I've also been told that far nicer ones will be available with the official web site comes online. Anyway, look for the digging to begin along the west side of First between K and L soon.
The other issued building permit is for 909 New Jersey Avenue, the site of the old Nexus Gold Club and where JPI is building its second residential project in Near Southeast, across the street from the soon-to-be-above-ground buildings at 70/100 I Street. Quoting directly from the permit, but with typos fixed: "INSTALL ONE 40X70 TENT: NO LIGHTING GENERATORS COOKING PROPANE OR HEATERS. TEMPORARY USE FOR GROUNDBREAKING CEREMONY EVENT ON JUNE 6TH 2007." Fun! So if you see a big party at New Jersey and I on Wednesday, that's what it is. Alas, I haven't been invited; but there's still time to contact me, JPI!
More posts: 909 New Jersey, jpi, Square 699n, Velocity Condos
 

The mixed-use project on Square 699N (the block bounded by Half, K, L, and 1st, which was cleared of all of its buildings during April) now has a "placeholder" web site--Go to http://www.velocitydc.com, and you'll see a "Coming Soon" image for Velocity Capitol Riverfront. (Does "Velocity" refer just to the first 14-story condo building getting underway soon on the northwest corner of 1st and L, or the entire development? I don't know.) This first phase of the block's redevelopment is expected to be completed in 2009, and the sales center should be opening this summer; eventually there will be a "sister" residential building built at Half and K; the final phase could be office or hotel or Whatever The Market Will Bear When the Time Comes. For pre- and post-demolition photos, see my now-renamed Velocity page.
(And what the heck, I'll give myself a public pat on the back for guessing the URL--I've been checking it for weeks, wondering if I was right or not, and today finally got my payoff.)

More posts: Square 699n, Velocity Condos
 

What a beautiful day! And with that weather, what luck that I had arranged some trips high up into a few of the tall buildings around the neighborhood to get new shots of the latest demolished lots and holes in the ground. I've uploaded these new pictures From Above and matched them with "before" shots on a whole slew of pages (you might have to scroll a bit to see the new pictures): Nation/1015 Half, the old Edge/Wet block on Square 699N, the North of M overview page, the Monument Half Street page (that's a biiiiig hole in the ground), the 100 M/Onyx on First page (where the construction on the Onyx end of the block is getting close to street level), 70/100 I Street, 909 New Jersey (showing the A1 garage all alone) and even the Stadium Construction Gallery (waaaaaay at the bottom, with a view from just a bit to the side of Dead Center Field, albeit four blocks away). I also created a new Overhead Photos page, showing all the ones I've posted on the site, grouped together by location. And I also created a special view with larger-than-usual pictures from today (don't miss it!), because it was so beautiful and you really could see forever from those high-up locations, and I wanted people to be able to see more than just little specks of buildings.
 

With Edge, Wet, Secrets, Ziegfield's, and the other adult nightclubs having now been gone from Near Southeast for quite some time, I'm going to stop giving updates on their progress as they try to find new homes. If you're wanting to keep up with the latest, check out Frozen Tropics, who has been adding a number of entries over the past few days on the plans for some of the clubs to move to Northeast.
More posts: Restaurants/Nightlife, Square 699n, Velocity Condos
 

A couple of quick links in quick succession:
"Stadium Legal Expenses Mounting" from the Examiner, about the escalating legal costs still being incurred from the battles over the taking of the stadium land via eminent domain (Kwame Brown says the $611 million spending cap is not in danger even while the council introduces legislation to pay Venable LLP up to $3.8 million over the next two years to continue to work out the lawsuits by displaced landowners still pending.)
To cleanse the palette from that, you can read about the new 47-ft-by-101-ft high-definition video screen (scroll to the bottom of the page) that the Nationals will be installing, the second-largest one in baseball. The Nationals' owners ponied up the additional $2.8 million to upgrade from the smaller scoreboard that the DC Sports and Entertainment Commission was paying for.
Yesterday a DC Council subcommittee approved B17-0109, "The One-Time Relocation of Licensees Displayed by the Ballpark Amendment Act of 2007", which if passed would allow Ziegfield's and Heat (which closed because of the stadium's eminent domain land takeover) and Edge/Wet and Club 55 (which weren't on the stadium footprint but closed in Sept. 2006 to make way Square 699N's redevelopment), to relocate in Ward 5 near Mt. Olivet cemetery. The Post reports that Ward 5 council member Harry Thomas will oppose the bill, and that his office heard from more than two dozen residents yesterday complaining about it. You can also read a couple of pieces from last week about the bill being introduced.
Also, there isn't really anything new in it, but just for archiving sake (or for those of you coming in late), here's a quick blurb from Costar on the Metropolitan Police Department's planned move to the old Post Plant at 225 Virginia. Here's my previous entry on the move, for more background.
 

Today I saw for the first time new signs hung on the fence surrounding the firewood lot on the southwest corner of 1st and I Streets, emblazoned with "DRI Development/Office and Retail" (or some such). I have absolutely no information on this--this lot has been owned for quite some time by the Potomac Development Corporation, but I don't see any records as of yet in the online public records to indicate a sale has taken place, so perhaps it's a joint venture. Or not. I don't know. Anyway, I'll try to see what I can find out (whispers in my ear always welcome!), and hopefully some light can be shed on perhaps ANOTHER project getting started in the North of M section of Near Southeast, to go along with JPI's two residential towers, ADC Builders' Square 699N, Faison's Onyx on First condos, and Opus East's 100 M office building (and maybe the Nation site, too?), and perhaps something on the Sunoco lot by Monument Realty.
 
96 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10