Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Sep 13, 2011
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2 Blog Posts

First, a reminder that Wednesday Sept. 14 brings the Public Scoping Meeting for the Virginia Avenue Tunnel project. This is a "we want to hear what YOU think!" meeting, so there will be no presentations of actual plans for the construction. It will just be an open house with information on what exists and what needs to be done, and a chance for interested parties to submit their feedback to DDOT and the FHWA. The meeting is from 6:30 to 8:30 pm at Van Ness Elementary School; you can read more about the meeting in my post from last month. There's also the official web site, and this flyer from the newly formed Concerned Citizens of Virginia Avenue that makes clear their opinion on what's to come. Additional meetings where CSX will finally provide some specifics on their designs and plans should come later this fall.
As for doings at Monday night's ANC 6D meeting beyond the Metro station renaming items I already wrote about:
* Capper Time Extensions: The commission voted 7-0 to support the request for two-year extensions on two planned Capper apartment buildings and the office building planned for 600 M Street, which is also part of the Capper redevelopment. (I hadn't realized that 600 M was part of this request when I wrote my entry last week.) This would push the planned start dates for these three projects into the late 2013-early 2014 time frame.
As is usually the case with any Capper issue in front of the commission, Chairman McBee brought up the delayed community center, which Housing Authority representatives said should get its needed $7.4 million in funding when a new bond issuance happens later this year, and a building permit should be filed for in advance of the July 2012 deadline. As is also most always the case with Capper issues, the commission also wanted statistics and information on the former residents of the project, and whether they are being tracked and worked with. The DCHA reps said that 129 residents have returned to Capper, with another 550 on the waiting list, though some of those have turned down recently completed units for various issues (not wanting a walkup, etc.). This is with about half of the required 707 public housing units already constructed.
This extension was to have been heard by the Zoning Commission on Monday night, but since the ANC had not yet had a chance to weigh in, the applicants agreed with a request to delay action until the Zoning Commission's Sept. 26 meeting. If you want to know more, you can read my entry from last week (no need to write it all again!).
* Redistricting: The ANC proffered an alternate Single Member District map from what the Ward 6 Redistricting Task Force has proposed. It tweaks the proposed boundaries in a way that moves current commissioner David Garber's building and the 70/100 I buildings back into 6D07 (along with the small block in Southwest bordered by South Capitol, M, N, and Carrollsburg Place), while placing Capitol Hill Tower, 909 New Jersey, and Velocity in 6B03, which reaches across South Capitol from Southwest. (The proposed SMDs that cover Near Southeast are in my quickie map at right.) Commissioner Cara Shockley, whose 6D02 was altered substantially from what the task force had proposed (it would have covered the portion of Near Southeast now given to 6D03, along with 70/100 I and Onyx, but not CHT), told the commission she was completely opposed to the new boundaries, and had no idea that such a big change was being proposed by the ANC, having been unable to open the attachments with the map images. David Garber took no official position on 6D's map, saying that because his constituents have made clear that they feel Near Southeast belongs in 6B and not 6D he would not be voting. In the end, the ANC supported the resolution offering up the alternate map in a 4-1-2 vote, with Garber and Bob Craycraft abstaining and Shockley voting against.
The task force's next public meeting is on Sept. 19 to propose the second draft of SMD boundaries, followed by a final meeting to approve their final draft maps on Sept. 22. Tommy Wells will then submit recommendations on boundaries to the city council by Sept. 30. For more on all the redistricting process, see my previous entries.
 

With WMATA looking to tighten up the naming conventions for Metro stations and also preparing for a new map thanks to the impending service expansion to Tysons Corner and eventually Dulles, the three local jurisdictions have been encouraged to come up with proposals by the end of this month for any station name revisions they may want. This brought Steve Strauss of DDOT to Monday's ANC 6D meeting, to find out whether the community had any feelings about the names of the four stations within the commission's borders, and in particular whether the ANC had any desire to take a second look at two proposed name changes it supported last year in light of WMATA's recommitment to the notion that station names should be no longer than 19 characters (13 for transfer stations).
Yes, it's time for the Curly W discussion again.
Last December the commission voted to support requests from both the Capitol Riverfront BID and the Nationals to change the station name to Navy Yard-Capitol Riverfront-, but that is well above 19 characters (and would be even worse if the Curly W weren't approved and "Nationals Park" were substituted, as called for in the ANC resolution at the time). The discussion on Monday night centered around whether using the logo would set a dangerous precedent, whether it would be confusing in terms of pronouncing the station name, whether it's de facto advertising, and whether riders with vision impairments would or would not be better served by having a logo versus a spelled-out "Ballpark." Commissioner Andy Litsky was also vocal in wanting some assurance that the Nationals would be paying the estimated $100,000 for the changing of the name of a station, and would not try to argue that the city should pay the cost since the stadium is a public building.
Gregory McCarthy of the Nationals told the commission many of the same things he did back in December: the Curly W is the official logo of a city-owned building, and the team wants the logo to appear on transit signage just as it does on freeway signs around the area. McCarthy also said the team very much wants to promote transit as the best way to get to the stadium, and that having the logo on signs and maps helps to emphasize the connection between Metro and the Nationals year-round. There's also no desire to have any variation of "Nationals Park" in the name, given the possibility that the stadium's naming rights will someday be sold and the name changed.
An initial motion to rename the station Navy Yard-Ballpark failed on a 3-3 vote; after more discussion, a new motion to support Navy Yard- if a logo were allowed, and Navy Yard-Ballpark if not, passed on a 4-2 vote. (Technically, these motions were all about amending the resolution from December, but I'm giving you the blessedly short version.)
I should also note that the Capitol Riverfront BID's recent request to simply rename the station Capitol Riverfront- was briefly mentioned at the start of the discussion, but clearly had zero support from the commission or the audience and was never voted on.
The ANC also voted 7-0 to change Waterfront-SEU to Waterfront-Arena Stage. But the resolution acknowledged that the new station name would be 22 characters long, and so a second resolution was passed on a 4-3 vote asking to rename the station as SW Waterfront if Arena Stage does not get added to the name.
There was a brief discussion as to whether there might be interest in adding Banneker Park to the L'Enfant Plaza station, but there was little support, and recognition that the name would be too long anyway.
All requests for changing station names will first go through the city's evaluation procedures, with the mayor's office then submitting formal recommendations to WMATA.
 




                  © Copyright 2025 JD.