Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Jul 30, 2007
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


3 Blog Posts

The Zoning Commission shoe-horned in one last public meeting tonight before its August break, and took up a couple of Near Southeast-related items.
After having asked for revisions, clarifications, and refilings on three previous occasions, the commissioners once again had before them a first vote to approve the planned 276-unit residential project by Camden Development at 1325 South Capitol Street, across the street from the Nationals ballpark. The major sticking point in the last two meetings has been the design of the western side of the building, which is technically the "rear" of the building but will be on full display to much of Southwest because only low-rise buildings back up to the project site. Commissioner Turnbull had led the complaints in previous meetings about the need to "step up" the architecture, and while he was not jumping up and down for joy (calling the latest revisions "brutal at times"), he indicated that the plans had indeed made some progress. Commissioners Parsons and Hood agreed, and the commission voted to give first approval to the project three votes to zero, with commissioners Mitten and Jeffries not voting (having not participated in the case). The project now goes to the National Capital Planning Commission for its review, with a final vote by the Zoning Commission in the fall.
The Commission also gave its final approval to Case 07-08, which amends the zoning regulations to allow temporary surface parking lots on various blocks near the stadium. This is the case that stirred an outcry a few weeks ago when it was discovered after the commission's preliminary approval that the language specifying the parcels approved for parking included the three blocks slated for Canal Park. But with a supplemental report from the Office of Planning amending the language, and also with the report from the National Capital Planning Commission indicating its support of the amendment as long as the Canal Park boo-boo was fixed, the zoning commission approved the amended amendment three votes to zero, with commissioners Parsons and Jeffries not voting. And then they amended the original emergency amendment, too, just to make 100% sure that there were no loopholes big enough to build a parking lot on.
 

As expected, WMATA has re-posted its Invitation for Bids to purchase the Southeastern Bus Garage land at 17 M Street, with a new deadline of 2 pm Aug. 28, at which time the bids will be opened and a winner immediately chosen. Minimum bid price is still $60 million, and settlement is to be held on Nov. 30. The IFB still contains a leaseback provision, requiring that the bidder rent the land back to Metro for 36 months. UPDATE: Here's the Metro press release on the sale process being re-opened.
So, it looks like the temporary detour taken when the city briefly expressed an interest in buying the property and then withdrew that interest (would love to know the real story behind that) has only caused about a one-month delay in the bid process. But does this mean WMATA will still have to be operating this very busy garage when the ballpark opens a block away, or is there still enough time for them to get a temporary facility built at DC Village before April 2008?
On the bright side, this means there will be at least one Near Southeast news item in August; otherwise, I think it's gonna be a little quiet around here over the next few weeks, other than some photo updates of the stadium, the Douglass Bridge, Onyx, and 70 I. But it's not necessarily a bad thing--even obsessive-compulsive webmasters can use a bit of a breather once in a while!
 

The Examiner has a piece today entitled "City Considers 'Ballpark Fare' For Fans Who May Ride Metro to Games": "Concern about game-night gridlock on the roads surrounding the new Washington Nationals ballpark is leading D.C., transit and team leaders to consider a special 'ballpark fare' for those fans who ride Metro to the stadium." But most of the quotes in the piece seem to emphasize that this is not anything close to a done deal, that it is just one of many options being looked at as planners try to figure out how to get as many fans as possible off the streets and onto Metro or other transit options. And: "Neither side would release details of talks between Metro and the Nationals -- including what entity or government would absorb the cost." This idea is apparently mentioned in the latest Transportation Operations and Parking Plan draft.
More posts: parking, Nationals Park