Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Capper
See JDLand's Capper Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


376 Blog Posts Since 2003
Go to Page: 1 | ... 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 ... 38
Search JDLand Blog Posts by Date or Category

The agenda is now posted for Monday's ANC 6D meeting, and it does have a few Near Southeast-related items on it. So it follows logically that I'm not going to be able to be there.
Items include: A report from the housing authority on a request for a zoning time extension for the planned (and long-delayed) community center at Fifth and K streets, SE; an update on the upcoming second phase of Capitol Quarter (which EYA tells me resulted in 11 reservations in the first 15 days); an update on the stadium Traffic Operations and Parking Plan, presumably coming out of the two recent public meetings; and reports/possible votes on Justin's Cafe's proposed sidewalk cafe and the proposed "Harry's" liquor store at New Jersey and I, both of which you can get more detail on from my report on last week's ABC subcommittee meeting.
The meeting is at 7 pm at St. Augustine's church at Sixth and M streets, SW--they're trying to get moved to their space in the new Waterfront buildings, but it still hasn't happened.
I'm going to try to find out more about the community center request, though I imagine there isn't much more to it other than DCHA says it doesn't still have the money to build it yet and so can't meet the deadline that was set in the zoning PUD (planned unit development) for Capper. The time frame for the community center has already been extended once, and in fact DCHA told the Zoning Commission last year that they fully expected that new deadline of filing building permits by Jan. 1, 2011, would be too short and that they'd be back to request another extension. Which appears to be what's transpiring.
 

Monday's Post covers for the first time the Marines' search for a new barracks site, from the point of view of the residents who maintain the Virginia Avenue Garden at Ninth and Potomac, which could be relocated to another section of the park if the Marines choose the area east of Eighth Street. "But the community gardeners, in Capitol Hill style, are mobilizing to save their home. [...] [T]he gardeners say it has taken them years to amend the unforgiving clay soil with nutrients."
The article quotes Capt. Lisa Lawrence as saying, "Our goal is not to take over a neighborhood," and that the Marines are looking at every option. "But we won't be able to please everybody."
Also mentioned is that the DCHA/Square 882 site at Seventh and L "has moved to the bottom of the list," according to Lawrence (presumably in response to this letter). And there's information about what appears to be Tommy Wells's preferred solution, that he's "fighting to keep the garden alive by urging the Marines to tear down the parking lot next to the annex and rebuild it underground, freeing space for a new barracks. Lawrence said a parking lot under a barracks would probably pose a structural challenge. 'We don't have a strong negotiating position," Wells said. "Who wants to take on the U.S. Marines?'"
If you want more background on the Marines' search, I've written a word or two on it over the past few months.
UPDATE: I meant to also include this link to a recent Hill is Home post on the history of the park, tied to whether or not the Marines' plans would conflict with the L'Enfant Plan. (Though I'm not sure Monsieur L'Enfant envisioned a big, honking, elevated freeway, either.)
 

With many thanks to reader S. for doing all of the legwork on this, I'm passing along the news that neglected the three-foot deep pool on L Street SE between Fifth and Seventh (between Van Ness Elementary and the parking lot that was once Old Capper Seniors) has been renovated, and is now open as the Lincoln Capper Children's Pool. The DC Parks and Recreation web site has the hours, which are noon to 6 pm on Saturdays and Sundays until June 20, and then 11 am to 5 pm Mondays through Fridays from June 21 through August 20. It may not be as swinging as the scene at the Capitol Skyline Pool, but for parents looking to dunk their children (I mean, get their children some swim time), it's a nice addition to the neighborhood tableau.
 

I'm just now coming across a Washington Post story entitled "Housing Area Pushing for Supermarket," which says that a group of residents "in a small triangle of Southeast Washington launched a 'supermarket project' yesterday to persuade a grocery chain to build a store in their neighborhood," with a planned petition drive looking to get 1,500 signatures.
But, of course, I'm yanking your chain, since this Post article is dated Dec. 16, 1965.
The group, the "Community Commitee Group," planned to visit the regional offices of Safeway, Giant, and Kroger to present the case that the residents of the area bounded by 8th, Virginia, M, and New Jersey had only two corner groceries, with the closest supermarket being at Seventh and G, SE, which was too far for the "aged who live in the Carrollsburg Dwellings project at Fourth and M." Also, because many of the residents in the area qualified for food stamps, they needed to be able to shop at a full supermarket, where the stamps would stretch farther.
The group "also hopes to interest a chain drug store and a combination dry cleaning-shoe repair shop to locate next to the proposed supermarket." Their suggested locations? "The west side of New Jersey Avenue between K and L Streets to replace some condemned buildings [ahem], the Washington Navy Yard parking lot on 2nd Street between M and I Streets [ahem], and the Lennox School annex at 4th and M Streets [ahem]."
In the meantime, while you're mourning the fact that no progress has been made in the brief 45 years since this article was published, you can think about another big development that Near Southeast missed out on: In the early 1990s the Federal Bureau of Prisons was looking for a location for a new 1,000-bed federal detention center, and one of the spots it considered was on the north side of I Street between South Capitol and New Jersey, the spot that's now home to the Axiom and Jefferson apartment buildings. And McDonald's. And Splash. (The other possible locations were in Northeast, but after battles with the National Capital Planning Commission and thanks to some pretty staunch opposition by city officials and residents, the Justice Department scrapped the plans in 1993.)
 

I've been chroncling over the past few months the Marine Corps' search for a spot for a new barracks, which has focused on a number of sites in Near Southeast, including the block bounded by Fifth, Seventh, L and M just south of their newest barracks that used to be home to the old Capper Seniors apartment building. It's been clear in public meetings and various other rumblings that both city planning officials and the DC Housing Authority are very much against the Marines using this site, with plans having been in place for a number of years for this now-empty/parking-lot block to become home to both a 600,000-square-foot office building and a 189-unit mixed-income apartment building (shown above) as part of the Capper/Carrollsburg redevelopment.
Clearly feeling that the Marines haven't given up on the site as an option despite these plans, DCHA has now sent the Marines a letter officially requesting that the Corps "not continue to propose redevelopment options on the DCHA-owned Square 882 as a future site for its facility needs." The letter explains that DCHA has already secured funds to improve the infrastructure around the square, has spent "substantial predevelopment funds" on design and engineering drawings, and is anticipating beginning work on the residential portion of the site in October. (There's currently no timetable for the office portion.) Further, DCHA says it "recently received an invitation from HUD to submit an application for a FHA loan guarantee to support the planned residential construction on the site," and that this construction is expected to start "this winter."
Nothing in the letter is necessarily a surprise--I've written fairly extensively about DCHA's plans and about the zoning travails they went through before getting a second-stage PUD approval for Square 882 last year, which even included many discussions and agreements with both the Marines and the Navy about security requirements for the new buildings on this block. But clearly DCHA is hoping to be completely removed from the Marines' list of potential sites in the same way that the DC Public Schools (and parents) got Tyler Elementary removed from consideration. But it's also clear from the public workshops that the Marines very much like what Square 882 has to offer them in terms of space and proximity to the other USMC operations in the area.
The Marines are hoping to make a decision on a site by September. You can see all the sites under consideration and the various options on the "Community Integrated Master Plan" web site.
 

I'm untethering myself from Lost long enough to pass along the news from Capitol Quarter that six houses were reserved in today's first offering of Phase 2 units, and apparently more will be released on Monday. (I don't know which, or anymore beyond that.) Now, back to my last precious moments with Desmond.
Comments (0)
More posts: Capper, Capitol Quarter
 

An e-mail has just gone out from EYA saying that "reservations for Phase II market rate townhomes at Capitol Quarter will begin on Sunday, May 23rd, at 11 AM on a first come, first served basis." Nine houses will be made available in this first batch, ranging in base price from $640,000 to $829,000. The specific models and more information are available here; the e-mail also says that other homesites made be made available. (See yesterday's entry for more details.)
Comments (0)
More posts: Capper, Capitol Quarter
 

The news has filtered my way that EYA is about to begin taking reservations for market-rate townhouses in the second phase of Capitol Quarter. The timeframe is *very soon*, quite possibly within the next week or so. This phase will cover the three remaining blocks of the development, between Third and Fourth streets SE, south of I down to the stretch just south of L (backing up to the 300 M Street office building). There will be infrastructure work to do first (including carving out the new north-south "3 1/2 Street" running between I and L), with "vertical construction" then starting in the fall, followed by the first move-ins happening in mid-2011. There will be 77 market-rate and 34 workforce-rate houses, 47 affordable rental units, and five Section 8 purchase units. (There will be a lottery for the workforce units, but I don't know when.)
When I get word of when reservations will start being taken, I will post ASAP. I don't know if there will be people camping out like in the old days, but it will be interesting to see the response. I don't know anything about prices or anything else beyond the fact that we'll know more soon.
One footnote that might be of interest: what helped get this second phase kicked off was the $9.5 million grant from HUD that the DC Housing Authority received late last year, which came from a pool of federal stimulus funds. DCHA had been unable to get any financing for the second phase throughout last year thanks to the moribund municipal bond market, but the HUD grant allowed DCHA to pay for the completion of construction drawings, the land preparation costs, and other costs that then made it possible for the second phase to begin to move forward.
Comments (0)
More posts: Capper, Capitol Quarter
 

I haven't been able to go anywhere near Fifth and Virginia for weeks now without feeling desperately guilty--I haven't taken photos of the Capitol Quarter construction there since JANUARY. (In my defense, that intersection is my personal Waterloo--I've never been able to standardize my spots for photos.) I also hadn't gotten updated photos along the northern part of Fourth Street since the snows of February. I've been a little better about the upper block of Third, but not a lot.
So I finally rectified that today. Here are the before-and-afters along Fifth, Fourth, and Third, with a perennial reminder to click on the icon to see all photos of a certain spot over the past seven years.
Comments (0)
More posts: Capper, Capitol Quarter
 

This week the Marines held a third community workshop as part of their quest to find a new location for their Bachelor Enlisted Quarters (BEQ), to replace the aged and un-secure "Building 20" at Eighth and I, SE. This session centered on visions/possible layouts of the five locations that the Marines are zeroing in on, all of which are in Near Southeast, now that Tyler Elementary has been knocked off the list. The people running this planning process deserve a lot of props for being very good about posting their meeting materials online, mostly because it obviates the need for me to go on and on trying to describe them. (Yay!)
While the presentation slides are good for an overview of the process, the real meat to chew on is the new "Regions Forums." (Though, a hint to the folks running the web site: I'd turn off the "Interactive Map" scroll that is the link to these Options slides, and maybe rename the link, because it's easy to miss and contains such important information.) This is a series of very detailed drawings of possible layouts (and pros and cons) for the locations they're studying, which include four that have been previously discussed (the current Barracks site on Virginia Avenue between Fifth and Seventh, DCHA's Square 882 just to the south on L between Fifth and Seventh, the Exxon/Virginia Avenue Park site at 11th and M, and inside the walls of the Navy Yard), and a new location (Squares 929/930), which are the blocks between Eighth and Ninth and Virginia Avenue and M Street.
The 929/930 site seemed to get some interest from the sparse number of community members who attended the Wednesday night session I was at (I don't know about the response at Thursday's session), even though it would close L between Eighth and Ninth and would take a big bite of the Virginia Avenue Park (requiring the move of the community garden closer to the freeway). A representative of Madison Marquette--owners of the "Blue Castle" right across the street--said that they are very much in favor of this option, saying that it would help to "animate" lower Eighth Street. There was also some talk that perhaps the Navy Yard, in its quest for more space of its own, might then look at the Exxon site at 11th and M as an attractive location to expand to, giving that big stretch from Eighth to 11th south of the freeway a very military feel. There is of course a stretch of private homes along Potomac between Ninth and 10th where the homeowners might not be quite so interested in having military installations on three sides, and the Spay/Neuter Clinic at 10th and L might also end up needing to relocate. It would appear that the businesses along the east side of Eighth would get to stay (Port Cafe, Quizno's, Chicken Tortilla), but Dogma at Ninth and Virginia might lose out under this proposal.
As for Square 882, the Marines said that DCHA has said the location can remain on the "options" list even though the agency is actively working to secure funding for the apartment building they're planning for the site. It must be said that there does seem to continue to be a bit of a disconnect between how the Marines are characterizing the availability of this lot compared to what DCHA is indicating; also, Ward 6 planner Melissa Bird spoke up to say that the city continues to be very much opposed to Square 882 as a location for the Barracks.
But, blah blah blah, these few points are just a bit of atmosphere. Anyone who's interested in what the neighborhood may look like in a few years should be looking at all of the location options, as well as the "Potential Shared Community Projects" that the Marines see as what they can give back to the community in return for the land they will occupy. Readers should also make use of the "Comments" options that are available on each option page of the CIMP web site, as the Marines continue to stress that they truly have no plan at this point, and need the input of the community to help guide their final decisions. The next workshop, on "Consensus Elements," is scheduled for Saturday, May 22.
 
376 Posts:
Go to Page: 1 | ... 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 ... 38
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.