Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Metro/WMATA
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


218 Blog Posts Since 2003
Go to Page: 1 | ... 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 ... 22
Search JDLand Blog Posts by Date or Category

While the main stories in the media coming out of today's WMATA board meetings will no doubt be the approval of fare increases, my focus was on other action items:
* Without discussion, the board voted to execute the sale announced back in June of the 5,612-sq-ft WMATA land at New Jersey and M to "NJA Associates" (aka Donohoe). For more detail, you can read my entry from last week about how this land fits in with Donohoe's plans for 1111 New Jersey Avenue.
* The board also approved the plan to build a new 114-bus garage at DC Village to replace the Southeastern Bus Garage at Half and M, contingent on not only a series of land transfers between the city and WMATA but also on the $69.25 million sale of the current bus garage site to Akridge, since the proceeds from that sale are necessary to both fund the new garage and the interim costs associated with continuing the old garage's functions until the new site is ready. Marion Barry spoke forcefully in support of the move, speaking not only of his constituents' strong support for building a new facility in Ward 8 but also that the current garage is "in the way of progress," situated as it is smack in the middle of the fledgling Ballpark District.
No timeframe for closing the current garage was discussed by the WMATA board, and it was only mentioned in passing that Monument Realty's litigation surrounding the sale of the old garage is still pending. WMATA employees who I've talked to at Half and M in recent days have said they were initially told the garage would be vacated this month, then were told it would be next month, and are now being told that there's no firm date planned.
If indeed WMATA is not planning to close the garage before Opening Day, it will need to come up with plans for moving their buses in and out of that space while dodging tens of thousands of pedestrians, or how they'll shut down the garage during game times. It would also mean that the garage's possible use as a temporary parking facility would be off the boards.
 

From the BID, more details on the holiday music planned for the Navy Yard Metro entrance this week, and it's three performances over three days, not just one on one day. On Wednesday, Dec. 12, from 11:30 am to 1:00 pm, the a cappella group Reverb will be performing; Patty Reese will perform on Thursday, Dec. 13, from 4 to 5:30 pm, and on Friday, Dec. 14, Reverb will be back from 8 to 9 am. This is sponsored by the BID, WMATA, and the DC Commission on Fine Arts. UPDATE: Here's the release from last Friday (that I overlooked, grrrrrr) on the Metroperforms! program. One thing in it that might be worth noting, just to be on the safe side: "Program participants are not permitted to sell merchandise, nor ask for money from the public while performing."
More posts: Metro/WMATA, staddis
 

A short blurb in today's Post says that at lunchtime on Dec. 12 there will be an a cappella quintet performing holiday music at the Navy Yard Metro station. "The performances are part of MetroPerforms!, a program designed to showcase the talents of area artists at select station entrances." Fa-la-la-la-la-la-la!
More posts: Metro/WMATA
 

Because I'm not always so successful in getting people to tell me the current status of various projects, I spend a lot of time pouring through documents hoping to get hints here or there, and within the past few days I've uncovered a few new ones. I sent out some e-mails asking for additional information, but those have gone unanswered (waaaaah!), so I'll just post what I've seen, and wait for the various bureaucratic processes to move along to get more information.
The developers of the planned office building at 1111 New Jersey Avenue are having a Capitol Gateway Overlay Review in front of the Zoning Commission on Jan. 31. This review is now required because Donohoe is buying the land on top of the Navy Yard Metro station east entrance, which means that the project's property now "fronts" M Street and must get a review by the Zoning Commission to make sure it follows the design and usage requirements laid out by the CG Overlay. I haven't seen any new renderings yet to know whether the building has grown from its original 146,000-sq-ft design (note: see UPDATE below). No mentions yet of when construction might start. Presumably this design will be presented to ANC 6D, at perhaps its January meeting.
And, in the Questions and Responses posted along with the Capper PILOT underwriters RFP, there's the following statements:
* 250 M Street, the 200,000-sq-ft office building by William C. Smith, "will commence construction on or about May 2008";
* 600 M Street, the 500,000-sq-ft office building by Forest City on the old Capper Seniors site, "is expected to commence construction in late 2009 or early 2010 -- Stage II PUD process with the District Zoning Commission has already commenced"; and
* 800 New Jersey/120 Canal, the planned 1.1-million-sq-ft mixed use project by William C. Smith on the land north of I between Second and New Jersey (known as Square 737), "will commence Stage II PUD upon transfer of District land in early 2008."
1111 NJ UPDATE: Amazingly, just a few hours later, another document popped up with additional information on 1111 New Jersey: it's for the Dec. 13 WMATA board meeting, a request to execute the sale announced back in June of the 5,612-sq-ft WMATA land at New Jersey and M to "NJA Associates" (aka Donohoe). And it describes the "new" 1111 NJ thusly (emphases mine):
"The Developer proposes to combine the WMATA property with an adjacent 16,406 sf developer-owned site and develop an office building with ground floor retail. Its current proposal to the District of Columbia Zoning Commission is for an approximately 211,000 sf building, a portion of which cantilevers over the WMATA property. At ground level, the proposal includes a wide plaza surrounding the Metro entrance, consistent with the Anacostia Waterfront Initiative Framework Plan. The Developer will make modifications to Metro facilities at its own cost and subject to WMATA approval. At present the modifications are expected to be limited to adjustments to the vent shaft and new paving in the plaza area. The existing entrance canopy will remain. The entrance will be protected during construction. The Developer has stated that it does not currently anticipate any need to close the entrance during construction."
WMATA is selling the land for $2.3 million plus an unnamed additional payment if the approved project is larger 206,000 square feet.
 

Voice of the Hill has posted an article on the status of parking and traffic plans for the new ballpark, which boils down to: team and city officials say it will be okay, neighborhood residents and activists say it won't. The team, as it always has, will be emphasizing Metro as the best way to get to the stadium, and is apparently working on plans for guiding people who drive to the games on the "right way" to get to the various parking lots that will be available. As for the infrastructure work: "Street and sidewalk work is on schedule, and the Navy Yard Metrorail station will be ready to use, but possibly unfinished, by opening day, said Ken Laden, the Transportation Department's associate director for transportation policy and planning. Laden also said the agency is working with Ward 6 Council member Tommy Wells on new street-parking regulations that would discourage on-street parking during games."
According to the Voice there was a community meeting about baseball-related traffic concerns on Nov. 28, which I didn't see announced anywhere. But apparently there's another one scheduled for Dec. 19 at 6:30 pm at Southeastern University.
More posts: Metro/WMATA, parking, Nationals Park
 

During my poking around on the DC Office of Cable Television web site recently, I discovered that many of the groundbreakings and other events in Near Southeast this year that have been broadcast on the city's cable channel 16 are also available On Demand; the same goes for council hearings, available on Channel 13's On Demand page. (I kinda sorta knew that the On Demand stuff was there, but when I checked it many moons ago, it didn't seem quite so complete, so I hadn't looked back in on it for a while.)
So if you've missed any of the following four-star telecasts from 2007, you can watch them at your leisure:
* The July bill-signing ceremony at the Earth Conservations Corps pumphouse where the Anacostia Waterfront Corporation and the National Capital Revitalization Corporation were officially abolished;
* JPI's June "groundbreaking" for its four projects along I Street ("Capitol Yards");
* The January groundbreaking marking the start of the Navy Yard Metro renovation and Monument's Half Street project;
* And pretty much any ceremony anywhere in the city the mayor was at since the beginning of the year, plus a lot of other presentations and events. (Be sure not to miss the Reporters' Roundtable "Snitching Debate.") Check the dropdown boxes on the On Demand page for the offerings. I've added the above links to all of the various project pages in case you're desperate to find them again someday.
Two of the most recent shindigs haven't gotten added to the lineup yet--the Oct. 22 kickoff ceremony for the Capitol Riverfront BID (in which you can find out where the "Traveling Roadshow" moniker originated), and the mayor's remarks at the Nov. 13 turf unveiling at the ballpark. Ditto with the Waterside Mall Demolition program, which is currently playing on Channel 16 but hasn't yet made it to On Demand. But perhaps they'll show up eventually.
 

This has been rumored for a long while, but today's Examiner is reporting that it appears to be moving forward: "The D.C. Circulator bus system is expected to expand with at least two new routes in 2008, one between the Walter E. Washington Convention Center and Adams Morgan, and the other from Union Station to the new Washington Nationals ballpark. [...] But it is not expected to be implemented until late 2008, after the Nationals' season." The article doesn't give an exact route, but previous statements by DDOT and others mentioned that it could run past the new US Capitol Visitors Center (yeech--don't get me started) and the Capitol South Metro station as well. And no reason is given for why it wouldn't start until late next year. The Circulator is run by DDOT.
UPDATE: Here's the Washington Business Journal blurb on the plans, with not much additional detail but saying that the areas "should be covered by the end of 2008." And there's also a somewhat confusing statement late in the story, after it says that two new routes will be added, that says "The department will try to modify the existing three routes by extending them to the needed areas, but if that becomes too cumbersome, it will create the two new routes[.]" So now the question is, are there really two new routes, or just expanded routes being covered by the existing routes?
More posts: circulator, Metro/WMATA, Nationals Park
 

From the Post: "Monument Realty, which has filed a federal lawsuit against Metro over a land dispute, said Friday that the expansion of the Navy Yard station near the new Washington Nationals baseball stadium would be completed on schedule. Executives at the District company had threatened to slow work on the project because the transit agency plans to sell land near the stadium to another development company, Akridge. Jeff Neal, a Monument principal, said in a written statement that the project would be completed before the start of the 2008 baseball season. 'We have worked diligently and transparently to develop an aggressive timeline,' he said. Lisa Farbstein, a spokeswoman for Metro, said, 'We have every reason to believe that they will fulfill that pledge.' " Monument also stated that the station would be done on time a few weeks ago in a letter to ANC6D vice chair Andy Litsky and others, which I posted here. You can see my Monument Half Street page for more information on the station expansion as well as 55 M Street, the office building that Monument is constructing on top of it. (There's also the Half Street Web Cam for tracking the progress, but it's been offline for the past few days. UPDATE: It's back now.)
UPDATE II: There's also this interview with Russ Hines and Amy Phillips of Monument, conducted last Friday by the Nats320 blog, about the on-time-ness of the project.
 

Monument Realty has created a high-tech animation of what its under-construction project on the east side of Half Street will look like when completed; some images captured from the animation are now on my Monument Half Street page. (I'm waiting to find out where the animation will reside, and hopefully will be able to link to it.) Compare the drawings of the Half and M corner with the latest shots from the Half Street construction web cam, and you'll see that the steel beams are now being put in place that make up the distinctive pattern around the Navy Yard Metro entrance. (But don't look too closely at what's shown for the west/right side of the street, since that's the site of the WMATA Southeastern Bus Garage, which Monument thought it was going to acquire but which has been won by Akridge with a $69.25 million bid. And which is now subject of a Monument lawsuit.)
UPDATED, 10/25: I've now got a low-bandwidth version of the animation posted. Please note that in order to not have it be huge file that you'd need an afternoon to download, the animation is not as sharp as the original.
More posts: West Half St., Metro/WMATA, Monument Valley/Half St., staddis
 

From WTOP, a story about someone thinking about maybe doing something sometime: "It looks like the Metro station nearest to the Washington Nationals new stadium will be renamed, but who will pay for it? WTOP has learned the Nats may intend to pick up the tab. Nationals President Stan Kasten says discussion of what the Metro station might be called has been delayed because stadium naming rights have yet to be determined. But as far as paying for the new signage, Kasten says it is something the organization is 'talking about' and one of the things it is 'considering.' "
More posts: Metro/WMATA, Nationals Park
 
218 Posts:
Go to Page: 1 | ... 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 ... 22
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.