The
Anacostia Waterfront Corporation has posted
a PDF of a presentation from Wednesday's board meeting, with bullet-point updates about their initiatives, including the Southwest Waterfront, Poplar Point, Hill East, and of course, the "South Capitol Street Waterfront". Nothing really new in it regarding the
Ballpark District, though I was little surprised to see a map they had (page 29 of the PDF) of the area that they have some sort of weird layout of the southeastern corner of the
stadium site, with a big plaza that easily crosses over to the riverfront, and even shows P Street running halfway through the stadium site. Unless there's been some huge reconfiguration of the stadium design that I haven't yet heard about, methinks they're being a tad blue sky and are trying a bit too hard to turn the stadium into a "waterfront" ballpark. They've also got a watercolor on page 27 that doesn't even depict the stadium in its correct layout. There's a map at the top of my
Ballpark District page, released by the AWC in Dec. 2005, that is I believe a more realistic rendering of how the stadium interacts with the waterfront; and page 15 of the
DCSEC renderings presented to the Zoning Commission shows the design of the southern side of the stadium (but don't get me started on that blue-grey "future development" monstrosity shown on that slide--I'm guessing the ZC wouldn't be interested in approving THAT). Hopefully the long-awaited (and very long overdue) Ballpark District Master Plan will be released before too much longer, where we can see concrete designs of what they're anticipating.