Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1111 Blog Posts Since 2003
Go to Page: 1 | ... 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 ... 112
Search JDLand Blog Posts by Date or Category

I'm a few days late with this, but it's still worth marking the milestone that infrastructure work has now indeed begun at Capitol Quarter, on the northwest corner of 5th and L. Considering that the announcement in 2001 of the plans for revitalizing Capper/Carrollsburg was one of the first things that got me interested in goings-on south of the freeway, it's quite satisfying to see that forward movement (beyond just demolition) has finally started.
More posts: Capper, Capitol Quarter
 

From today's Washington Times: "The head of the D.C. Sports and Entertainment Commission yesterday said he would like to increase the pace of work on the Nationals' new ballpark to ensure that it is completed in time for Opening Day of next season. Commission CEO Greg O'Dell said he has asked the stadium construction team, led by Clark Construction of Bethesda, to boost the number of workers at the site from 720 to the maximum of 900." And yet: "The project is on time and on budget[.]" The blurb also mentions that the commission is looking into non-baseball uses for the ballpark (such as concerts), since the city has the rights to use the stadium for 18 events each year.

More posts: Nationals Park
 

Dr. Gridlock got a tour of the Douglass Bridge makeover on Wednesday, and reports about it today on his Get There blog (with pictures). Next milestone? "They are a few days away from the concrete pour that will connect the lowered roadway to an approach slab that will bring it down to street level. The workers also will install new lighting on the bridge, finish removing the old, ugly railing along the sides and replace it with something more decorative, and finish the deck repair and paving. 'Come back in two weeks and you'll be amazed at the changes,' [DDOT acting associate director Ardeshir] Nafici said." (Not mentioned by the Doctor but worth plugging again: the M Street overpass will also be getting the new, more decorative railings in place of the current chain link fence.) There's also paving going on along the northern stretches of South Capitol Street.
Overall, "Nafici says that's been going remarkably well, and the bridge reconstruction is on schedule. They say they'll be done by their deadline of Sept. 7, but are hoping to finish up before that."
 

I'm pretty sure that this blog has posts about more than just parking lots, but it sure doesn't seem like it lately in my Ballpark and Beyond column in the Post, as this week's items are about the draft Transportation Operations and Parking Plan and the various Zoning Commission votes in the past week on temporary surface lots at The Yards and other locations around Near Southeast. You can also check out Stadium Parking page for more background on the scrambling to find enough parking spaces for ballpark goers, and my Yards page for more information and renderings about the plans for its redevelopment. And if you're interested in the TOPP, don't forget the open house tonight from 6 to 8 pm at 20 M Street, SE.
 

Thursday's Post reports that the new Nationals ballpark "will have wheelchair seating in nearly every section and will fully comply with the Americans With Disabilities Act," which "requires sports arenas to reserve 1 percent of their seating for wheelchairs with affixed companion seats." The Justice Department pushed stadium architects HOK Sport to include more disabled seating in the luxury suites, while architects with the Paralyzed Veterans of America recommended "inconspicuous, wheelchair-accessible seating throughout the stadium -- from luxury boxes to the cheap seats" along with "designs that make the ticket booths and concessions more accessible."
More posts: Nationals Park
 

Just a reminder (as I scramble desperately for fresh content during the August Dead Zone) that tomorrow night (Thursday, Aug. 2) is the open house on the new ballpark's Transportation Operations and Parking Plan. There will be information stations "manned by DDOT, Sports Commission and traffic consultants to allow residents to learn about Traffic Operations and Parking; Transit, Pedestrian Access and Bikes; and Residential Parking Permits, [and] Curbside Management (including shuttle and charter buses)." If you haven't peeked at it yet, here's the TOPP executive summary, or, if you're in need of 8 or 10 hours of light reading, the complete 58 MB version (summary, contents, and appendices). Or you can read my quick impressions from a few days ago.
The open house is at the new 20 M Street office building at Half and M, SE, from 6 to 8 pm.
More posts: parking, Nationals Park
 

A few weeks back I linked to a new video created by the Washington DC Economic Partnership showcasing all of the plans for the Anacostia waterfront, not only in Near Southeast but also the other areas along the Anacostia River. Since then, the WDCEP has launched a full web site devoted to this "Capitol Riverfront" area, with details on the various projects in the pipeline. While there's not much there about Near Southeast that you can't already find on certain obsessive-compulsive web sites, there's a good deal of information and renderings about planned projects in Southwest and Anacostia. (And you can watch the video again, too.)
Note: this is not the web site for the new Capitol Riverfront Business Improvement District--that site is still under development, though it will probably feature much of the same information, specific just to Near Southeast and Buzzards Point.
 

Within the past few weeks I've posted a lot about the MPD move to 225 Virginia Ave. and the falderal over the surface parking lots zoning amendment including Canal Park, but if you can't get enough, the August issue of the Hill Rag has pieces on both items. And a summary of the July ANC 6D meeting, too.
 

The Zoning Commission shoe-horned in one last public meeting tonight before its August break, and took up a couple of Near Southeast-related items.
After having asked for revisions, clarifications, and refilings on three previous occasions, the commissioners once again had before them a first vote to approve the planned 276-unit residential project by Camden Development at 1325 South Capitol Street, across the street from the Nationals ballpark. The major sticking point in the last two meetings has been the design of the western side of the building, which is technically the "rear" of the building but will be on full display to much of Southwest because only low-rise buildings back up to the project site. Commissioner Turnbull had led the complaints in previous meetings about the need to "step up" the architecture, and while he was not jumping up and down for joy (calling the latest revisions "brutal at times"), he indicated that the plans had indeed made some progress. Commissioners Parsons and Hood agreed, and the commission voted to give first approval to the project three votes to zero, with commissioners Mitten and Jeffries not voting (having not participated in the case). The project now goes to the National Capital Planning Commission for its review, with a final vote by the Zoning Commission in the fall.
The Commission also gave its final approval to Case 07-08, which amends the zoning regulations to allow temporary surface parking lots on various blocks near the stadium. This is the case that stirred an outcry a few weeks ago when it was discovered after the commission's preliminary approval that the language specifying the parcels approved for parking included the three blocks slated for Canal Park. But with a supplemental report from the Office of Planning amending the language, and also with the report from the National Capital Planning Commission indicating its support of the amendment as long as the Canal Park boo-boo was fixed, the zoning commission approved the amended amendment three votes to zero, with commissioners Parsons and Jeffries not voting. And then they amended the original emergency amendment, too, just to make 100% sure that there were no loopholes big enough to build a parking lot on.
 

As expected, WMATA has re-posted its Invitation for Bids to purchase the Southeastern Bus Garage land at 17 M Street, with a new deadline of 2 pm Aug. 28, at which time the bids will be opened and a winner immediately chosen. Minimum bid price is still $60 million, and settlement is to be held on Nov. 30. The IFB still contains a leaseback provision, requiring that the bidder rent the land back to Metro for 36 months. UPDATE: Here's the Metro press release on the sale process being re-opened.
So, it looks like the temporary detour taken when the city briefly expressed an interest in buying the property and then withdrew that interest (would love to know the real story behind that) has only caused about a one-month delay in the bid process. But does this mean WMATA will still have to be operating this very busy garage when the ballpark opens a block away, or is there still enough time for them to get a temporary facility built at DC Village before April 2008?
On the bright side, this means there will be at least one Near Southeast news item in August; otherwise, I think it's gonna be a little quiet around here over the next few weeks, other than some photo updates of the stadium, the Douglass Bridge, Onyx, and 70 I. But it's not necessarily a bad thing--even obsessive-compulsive webmasters can use a bit of a breather once in a while!
 

The Examiner has a piece today entitled "City Considers 'Ballpark Fare' For Fans Who May Ride Metro to Games": "Concern about game-night gridlock on the roads surrounding the new Washington Nationals ballpark is leading D.C., transit and team leaders to consider a special 'ballpark fare' for those fans who ride Metro to the stadium." But most of the quotes in the piece seem to emphasize that this is not anything close to a done deal, that it is just one of many options being looked at as planners try to figure out how to get as many fans as possible off the streets and onto Metro or other transit options. And: "Neither side would release details of talks between Metro and the Nationals -- including what entity or government would absorb the cost." This idea is apparently mentioned in the latest Transportation Operations and Parking Plan draft.
More posts: parking, Nationals Park
 

Yeeech. I managed to get out this morning before the rain started, and while there was a smidgen of sunlight at first, I've mainly got a bunch of gray, gray photos for you to look at. I updated the main Stadium Exterior Construction Gallery (and have added a few new angles), plus the north/south/east/west additional views for the diehards. New things to look for: the arched steel atop the scoreboard, the rounded steel marking the construction of the outfield restaurant, a lot more glass installed on the southwest side of the ballpark, and the ever-growing west parking garage. There's also now a big ole' trench dug down the middle of Potomac Ave. and rounding up onto First Street (two roads now completely closed south of N Street to anything but construction traffic). But with these photos being so dingy, if there wasn't something obviously new and different in the shot, I didn't update every angle on every page.
I also posted some shots of the Douglass Bridge extreme makeover, as work continues on the new ramp up from Potomac Avenue to the existing bridge. The rest the closed section of South Capitol Street doesn't look too different, although I did see that new sewer drains/curbs have started to be installed. (I also spied from the freeway a nice fresh layer of pavement on South Capitol heading into the underpass beneath M Street, but no pictures.)
And I also updated the Onyx on First and 70/100 I Street pages as both those projects now have an additional floor since last week. And 100 M looks to be getting close to coming out of the ground.
You can also just browse all of today's photos on a single page, and click the Click to see all available photos of this location. icon if you want to see older photos in the archive of a certain location.
 

From this morning's Post: "Metro is reopening bids for the sale of its Southeastern Bus Garage in the District. The board had been scheduled to consider a request yesterday to sell the property to the District, but a Metro spokeswoman said the District is no longer going to buy the property. [...] Metro had received three bids, but after the city decided it was not going to buy the garage and an employee parking lot, Metro decided to reopen the process, agency spokeswoman Candace Smith said. 'We think some firms were dissuaded from putting in a bid because the District had said it wanted to buy the property,' she said. The bidding period will last 30 days, beginning Monday, she said." (Note that one of the stories earlier this week said that no bids were received by the original deadline. Hmmmm.)
They've taken down the links on the bid process from this page, but here's the original Invitation for Bids, with a minimum bid set at $60 million. Perhaps the documents will be reposted on Monday.
 

With little discussion, the Zoning Commission tonight took final action and approved Case 07-17, the request for a special exception and a Southeast Federal Center Overlay District review of plans for temporary surface parking lots to last no more than five years at The Yards. The only news coming out of the hearing (other than the approval itself) was that just today it was decided to not include Parcel L, the lot just to the east of the WASA building, because of property line, fencing, and other issues still being negotiated with WASA. This means that approximately 785 spaces can be created at The Yards with this zoning approval (down from the 900 or so originally anticipated, though the Parcel L lot may still be requested at a later date). The National Capital Planning Commission will be voting on this case at its August 2 hearing, but zoning Commissioner Hood announced that the NCPC staff was recommending approval of the case as well. You can see the locations of the Yards lots on my Stadium Parking page, with the Parcel L lot now removed from the map. UPDATE: Should have included this link for folks looking for more information--the Office of Planning's report to the Zoning Commission on this case, which lays out the request in greater detail and explains OP's support.
More posts: parking, The Yards, zoning
 

The WMATA board of directors had on its agenda this morning a scheduled vote on the sale of the Southeastern Bus Garage property at Half and M Street to the District of Columbia (more on this proposed sale here). However, when it came time for the items from the Planning, Development, and Real Estate committee, it was announced that one of the items had been removed from the agenda--which turned out to be the Southeastern Bus Garage sale. The first 10 minutes of the board meeting were not included in the live and archived audio streams, so I don't know whether anything was explained during the "approval of the agenda" portion. I have a query into WMATA. UPDATE: WMATA posted a complete version of the audio file, but alas the sound isn't very good--with two sets of ears listening, it *sounds* as if the motion was made to remove the bus garage sale from the agenda and was then approved without any explanation or discussion.

 

The long-awaited draft version of the stadium Transportation Operations and Parking Plan is becoming available online, in either the full version (58 MB!) an executive summary, or individual chapters and appendices. According to a press release just out from DDOT and the DCSEC (not yet online), there will be an open house about the TOPP on Thursday, Aug. 2 from 6-8 pm at 20 M Street SE with information stations "manned by DDOT, Sports Commission and traffic consultants to allow residents to learn about Traffic Operations and Parking; Transit, Pedestrian Access and Bikes; and Residential Parking Permits, Curbside Management (including shuttle and charter buses)."
I haven't read it yet, so check back for any tidbits I find. But I didn't want to delay getting the link out....
UPDATE: Links are now working.
UPDATES, as I read: Immediate headline jumping out at me: plans for parking spaces and lots aren't completed. Not going to go over well. On the other hand, they are recommending that the restricted residential-parking-only areas (similar to what's been used around RFK) cover all of Near Southeast, Southwest (except possibly a few blocks in Buzzards Point), and Capitol Hill from South Capitol Street to 7th Street SE and from C Street SE to the freeway. (Map on page 20 of the main report).
As has been mentioned for months, they are trying to set up satellite parking at RFK, add a new Circulator line from Union Station, and perhaps get water taxi service running to the foot of First Street. But there's no updated status in the TOPP on any of these ideas (except for RFK parking, for which they are "securing agreements" and having shuttle companies test various possible routes). They're also now looking for between 5,000 and 7,000 total parking spaces. Parking for charter buses is still being worked on as well.
Note: This is a huge document. I'll try to hit highlights, but if there's something of particular concern to you, I suggest putting on your snorkel and flippers and diving in to get your answers, especially in the main report. If you want further background, there's my Stadium Transportation and Parking page, with presentations and flyers from the public meetings that were held as this was being drafted.

 

Back in mid-June there was a Saturday morning public roundtable by the city council's Committee on Economic Redevelopment on current development projects in Southwest and Near Southeast. If you didn't get to go, you can watch it tomorrow (Thursday June 26) at 6:40 pm on DC Cable 13, or via live streaming video. Of course, that's at the same time as the Zoning Commission hearing on Forest City's request to add temporary surface parking lots to the The Yards (also available via streaming video) so you'll have to make a choice.
And if you want to give over your entire day to monitoring developments (welcome to my world!), at 10 am Thursday is the WMATA board meeting where they will decide whether to sell the Southeastern Bus Garage to the city; this will also be available via live and archived streaming audio.
 

On Tuesday DDOT issued a press release with the latest roundup of news from the South Capitol Street/Frederick Douglass Bridge Extreme Makeover. The project is still on time, and is still basking in the glow of last week's lowering of the remaining northern 200 feet of the span. They also have started working on the new "globe" street lights and the utility work along South Capitol Street. Up next? Quoting from the press release (so excuse the jargon): "Continue concrete deck repairs, utility work on South Capitol Street (D/B), form sleeper slab, continue setting and work of MSE wall panels, remove support/jacking towers from two column lines." Also, in addition to the time-lapse video of the lowering, they've posted some photos of the bridge work's progress. What a cool idea! (Hey, we kid because we love.)
 

Some people have written me saying that the work to upgrade the infrastructure around Capitol Quarter has begun--but while it's close, I've confirmed that it hasn't actually started yet, although it shouldn't be too long now. This is work on the water and sewer lines--"vertical" construction (i.e., buildng the townhouses) is still scheduled to start in January 2008.
More posts: Capper, Capitol Quarter
 

News in Near Southeast has slowed a bit, so I'll toss another Poplar Point item your way (with the understanding that this in no way binds me to future coverage!). In the wake of the news that negotiations have fallen through with DC United over a new soccer stadium on the banks of Anacostia across from the Nationals ballpark and the Navy Yard, the city announced on Monday that is seeking competitive bids to redevelop the 110-acre site. Quotes of interest: "District officials are working closely with the National Parks Service to consummate the transfer, which is expected to close this fall. Under the terms of the agreement, the District must reserve at least 70 acres of the property for a waterfront park. The District will also engage in an extensive wetlands restoration, including Stickfoot Creek. [...] Initial planning studies indicate Poplar Point could accommodate more than 3.5 million square feet of development during the next 15 years. Desired uses for the site include a mix of housing, retail, commercial and cultural space. A soccer stadium has been proposed for the site, though the solicitation will not require developers to include a stadium in their proposals. At least 30 percent of all the housing built on Poplar Point will be affordable for moderate and low-income families, in accordance with a District-wide affordable housing policy announced by Mayor Adrian M. Fenty last week. The District will issue a solicitation to developers by the end of August. District officials expect to select a development partner before the end of the year." The Examiner has a piece on this new plan. UPDATE: Here's the WashTimes story.

More posts:
 
1111 Posts:
Go to Page: 1 | ... 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 ... 112
Search JDLand Blog Posts by Date or Category