Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Onyx
See JDLand's Onyx Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


79 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8

I've posted a nearly full complement of construction update photos, taken on Sunday. There's new shots of the stadium's exterior from along South Capitol Street and N Street (read my miffed post from a week ago about why I'm not getting shots from First or Potomac these days), and the expanded photo stadium exterior archives along South Capitol and N Street are updated as well. I also shifted around the exterior construction gallery to get the more-likely-to-be-updated photos higher up on the page.
I also took the standard shots of the residential projects at 70/100 I Street and Onyx on First, as well as the 100 M Street office building, and also updated the expanded photo archives for each of those, if you can't get enough before-and-afters. Or, you can see all the new photos on one page.
(PS: I know the site is slow today. The tech support people are "working on it." Apologies....)
More posts: 100 M, 70/100 I, jpi, Onyx, Nationals Park
 

Having decided that overhead views of Near Southeast from the ballpark and the Southeast Freeway over the past few days weren't enough, I've also now added a bunch of updated overheads from a vantage point at the Courtyard by Marriott, focusing on the many construction projects west of New Jersey Avenue. You can browse these new photos, or see the ones displayed with previous shots from the same location (scroll down a bit) to watch the changes since March of last year. (Hint: old buildings, followed by empty lots where old buildings used to be, followed by holes in the ground, followed by new buildings going up.)

 

After getting all those purty stadium interior photos and shots of the surrounding skyline on Saturday, I ventured out Sunday morning to do my usual rounds, and so have posted some updated pictures of 100 M, 70/100 I, and Onyx, along with new shots from the Southeast Freeway showing how much that view is changing (again) as these projects progress. (Here's all the images from yesterday on one page, if you prefer.)
But when I started down First Street south of N to get my usual shots of the stadium's exterior, I was thwarted by guards informing me that access along First (and, by proxy, Potomac Avenue) is now restricted to construction vehicles and workers only. I protested somewhat vigorously--after all, there are still fences around the stadium on that side, and the signs say "Local Traffic Only" and not "Road Closed"--but I lost.
I'll still manage to get photos of the ballpark's south and east side eventually, and really at this point the eye-catching part of the construction on those sides is slowing, so a more leisurely schedule of updates of those pictures will not be catastrophic. (Plus I can always set up my zoom lens at Poplar Point and the Douglass Bridge. That'll show 'em!)
I did take this roadblock as an opportunity to rejigger my Stadium Exterior Construction Gallery page a bit, breaking up the old let's-walk-around-the-perimeter format by bringing the showier shots from all vantage points to the top. You'll see a few new photos from along N Street taken yesterday, but I was too cranky from my run-in with The Man to get new shots from South Capitol. Grrrr.
 

After a week of days that were either overcast and drizzly or ridiculously hot and humid, today's sunny-and-warm profile gave me no choice but to venture out for a reconaissance mission. My report:
The masses of workers and the well-positioned fences make it nearly impossible to take photos of the current state of South Capitol Street, but I have added a decent photo to my Douglass Bridge makeover page showing the new South Capitol and Potomac intersection, which appears very close to being ready for traffic. Streetlights are in place, curbs have been built, paving has begun, and the historic globe streetlamps are installed all along the length of the bridge.
I also snuck a peek into the huge hole where Monument Realty's Half Street project is underway, and from N Street you can see what appears to be vertical construction is already underway at the bottom of the hole. It's along the M Street portion of the site, which will be home to the 55 M Street office building, which itself will contain the expanded entrance to the Navy Yard Metro station. Because that Metro work must be completed by Opening Day 2008, I guess it shouldn't be surprising that they're already pouring concrete and working upward, eight months into construction. The office building itself and the rest of the Half Street Phase I won't be completed until 2009.
And I unexpectedly found Demolished Building entry #138, as the beige garage that has long sat on the northeast side of the Half and I Street intersection bit the dust today, which I'm sure JPI is happy to see, given that 70/100 I Street is growing like a weed right next door.
Speaking of 70/100 I, it got updated photos today, along with Onyx on First and 100 M Street. You can look at those project pages (and their accompanying expanded archives), or you can browse this page showing all photos I've posted from today, which includes a few new shots of Capper Building #2, which I believe is just minutes from opening. And I even finally added a photo of the "Starbucks Coming Soon" sign out in front of the DOT HQ, for the caffeine-deprived.
 

With Saturday being one of those glorious clear days, I of course raced out with camera to make the rounds. 70/100 I, Onyx on First, and 100 M continue to rise, so the usual photos of those are now posted. The Stadium Construction Gallery is updated with views of the ballpark's northern and western vistas, which are changing markedly thanks to the work being done on the parking garages and on South Capitol Street in conjunction with the Douglass Bridge work.
And while you might think it's pretty much become rote for me to watch these changes, I must admit that when I scurried very briefly out into the middle of South Capitol Street at P Street to grab a shot or two, I was just about overcome by what it's all starting to look like. The holes are cut for the new South Capitol median, the curbs are being put in place for the new wider sidewalks, and the stadium's fake-limestone (I'm sorry, "precast concrete") exterior just pops in the late afternoon sun. Check my Douglass Bridge Extreme Makeover page photos that try to capture the new vista, along with a new Expanded Project Archive that I built if you can't get enough of looking at the before-and-afters of this stretch of road.
UPDATE: Oops, forgot to add the obligatory link to all the new photos on one page. There are also some additional here-and-there shots of spots that needed fresh photos.
 

I couldn't bear the icky gray photos I had to post last week with the overcast weather, so I went out again this morning and took a new batch of icky gray photos. So check the main Stadium Exterior Construction Gallery as well as the north/south/east/west additional views. The most striking change at the stadium in the last week is the work near Half and N on the west parking garage, which now has its fake limestone facade that matches the stadium.
I also added a couple shots of the Douglass Bridge extreme makeover, although this time there aren't really any new pictures of the bridge, but some updated shots of South Capitol Street, which has now been paved from the freeway south almost to P Street. (And kudos to the nice construction worker who told me about "this really cool site on the web" that's tracking the construction.) I also updated a few shots on my main South Capitol Street page (the first comparison is the most striking). Both of these pages are getting away from me a bit, and so are going to need some TLC to clean them up during this August lull, but today I opted for speed.
And I also updated the Onyx on First and 70/100 I Street pages again, with Onyx now having another floor added in the last week. And I managed to find a couple new 70 I angles to make up for my lack of access to I Street. (Speaking of I Street, I should note that in the past few weeks the old firewood lot that will eventually be part of the 99 I Street development has been cleared out. And, for that matter, I don't think I've mentioned that digging has truly begun at JPI's 909 New Jersey Ave. residential project.)
You can also just browse all of today's photos on a single page, and click the Click to see all available photos of this location. icon if you want to see older photos in the archive of a certain location.
 

Yeeech. I managed to get out this morning before the rain started, and while there was a smidgen of sunlight at first, I've mainly got a bunch of gray, gray photos for you to look at. I updated the main Stadium Exterior Construction Gallery (and have added a few new angles), plus the north/south/east/west additional views for the diehards. New things to look for: the arched steel atop the scoreboard, the rounded steel marking the construction of the outfield restaurant, a lot more glass installed on the southwest side of the ballpark, and the ever-growing west parking garage. There's also now a big ole' trench dug down the middle of Potomac Ave. and rounding up onto First Street (two roads now completely closed south of N Street to anything but construction traffic). But with these photos being so dingy, if there wasn't something obviously new and different in the shot, I didn't update every angle on every page.
I also posted some shots of the Douglass Bridge extreme makeover, as work continues on the new ramp up from Potomac Avenue to the existing bridge. The rest the closed section of South Capitol Street doesn't look too different, although I did see that new sewer drains/curbs have started to be installed. (I also spied from the freeway a nice fresh layer of pavement on South Capitol heading into the underpass beneath M Street, but no pictures.)
And I also updated the Onyx on First and 70/100 I Street pages as both those projects now have an additional floor since last week. And 100 M looks to be getting close to coming out of the ground.
You can also just browse all of today's photos on a single page, and click the Click to see all available photos of this location. icon if you want to see older photos in the archive of a certain location.
 

Took advantage of a Simpsons-like afternoon sky to grab some quick shots of the construction on the residential projects Onyx on First and 70 I, which both now have their first floors built. You can look at those two pages to see the shots along with their "befores", or just browse all of my photos from today on a single page. It should be noted that I'm somewhat hamstrung with documenting 70 I's construction, thanks to the closure of I Street between Half and New Jersey--I can really only take shots from Half and I looking eastward. But as it comes farther out of the ground, I can go with other farther-away vantage points to get the good befores-and-afters.
More posts: 70/100 I, jpi, Onyx, Square 743N
 

They're not really that exciting to look at, but I now have a few photos from yesterday evening showing that the ground floor of the Onyx on First condo project has sprouted. (Its sibling 100 M Street, coming out of the same hole, is on a slower schedule, it appears.)
And with the Douglass Bridge viaduct now gone, I've started making some additions and deletions to my Stadium Exterior Construction Gallery to change out the photos I had been taking from up on the viaduct and replacing them with some new angles. And there will probably be more changes to come, especially with the western parking garage at South Capitol and N now clearly visible. If you scroll through the stadium page, you'll be rewarded about halfway down with a photo showing the first panes of glass installed on the southwest side of the ballpark. And I'll be doing my usual photo update on Sunday for the other three sides of stadium.
More posts: Onyx, Nationals Park
 

I've been posting over the past couple days all sorts of new photos: first off, there's the usual update to the exterior views in the Stadium Construction Gallery's main page and the more detailed north-south-east-west pages. The big change is the arrival of the scoreboard steel on the First Street side, which has also helped to give the stadium its more rounded feel when looking at it from the north. And, if you know what you're looking for, you can see the first real shots of progress on the west parking garage at Half and N, although it's still kind of hidden by trees and construction equipment. There's also my final shots from up on the South Capitol Street viaduct north of Potomac Ave. (waaaah!).
You can also see some new shots from inside the stadium, where you can get a better view of the scoreboard's progress and also of the seats being installed in right field. And the outfield restaurant is moving along as well.
I got a big surprise when I rounded First Street onto Potomac Avenue Saturday morning--all of the trees and growth on the south side of Potomac were removed this week, and the fence marking Florida Rock's property was moved back, in preparation for the widening of Potomac Avenue. I posted a bunch of new pictures showing the change on my Florida Rock page, but I'm not sure the photos do it justice. And of course it's about to change even more late this week when the Douglass Bridge Extreme Makeover starts.
And finally there's a lot of new shots from various locations north of M that I took on Thursday, catching things like a new "Capitol Yards" sign at 909 New Jersey, progress on the Velocity Condos sales center, and even the new sidewalks on the northern portion of New Jersey Avenue if you have x-ray vision. It's hard to see in the photos, but the vertical construction at both Onyx on First and 70 I Street is now right at street level, so in the coming weeks expect those buildings to burst on the scene. You can see all these non-stadium updated photos compiled here if you don't want to poke around on the project pages.
That ought to keep everyone busy during a slow vacation-tinged week....
 
79 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8