Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Nationals Park
See JDLand's Nationals Park Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1142 Blog Posts Since 2003
Go to Page: 1 | ... 78 | 79 | 80 | 81 | 82 | 83 | 84 | 85 | 86 ... 115
Search JDLand Blog Posts by Date or Category

I've been meaning to post this for weeks, during a "lull", but since there hasn't been a Near Southeast lull since about August 2004.... If you've noticed over the past months the construction activity around the WASA site (that's "Water and Sewer Authority"), it's because they're in the midst of a $45-million-plus rehab of the Main/O Street pumping stations located there. And, for those baseball fans who've been a bit concerned about having to spend your time sitting a little closer to a sewage plant than perhaps you'd like, I hope that it eases your mind to see that the two bid solicitations for the project both mention "odor control" as part of the projects....
More posts: Nationals Park, DC Water (WASA)
 

Today's Examiner has "Mayor Williams says parking deal not dead", with not much that's new, but these lines advance the story a tad: " 'We've got to show that development's under way very, very quickly, but at the same time we have to satisfy the need for parking,' Williams said. Williams said talks were ongoing Monday between multiple parties. If the deal does ultimately collapse, the mayor said, the city might have no choice but to build the standalone parking garages sought by Nationals owners, but vehemently opposed by the D.C. Zoning Commission." And the WashPost editorializes about the brouhaha in "Mayor Williams's Dead Deal."
More posts: parking, staddis, Nationals Park, zoning
 

Today's stadium links (posted without summaries, because watching everyone run around like chickens with their heads cut off, clutching their hearts with doom and gloom, has finally exceeded my Allowable Exasperation Level): DC Examiner has "Mayor: City Must Act Fast on Parking," and the Washington Times has "Stadium Parking Threatens Budget". I'd also remind everyone who is so terrified that if the garages site isn't developed immediately, the Ballpark District will be doomed to failure--it took, what, seven years for the Gallery Place project to be developed just north of the MCI/Verizon Center, and that seemed to turn out okay. The garages site is two blocks within a far larger area that is already well on it's way to being developed, the city is going to get plenty of tax revenue, if those two blocks take a few extra years to get figured out, I don't think the city will crumble. UPDATE, 9/23: A day later, here's the Post's latest parking story, "City's Plans for Stadium Now Focus on Parking." I'm not going to rehash all the garage arguments (you can read the article's rehash, including yet another misguided statement about how a lack of development on those two blocks "could delay the waterfront revival until well after the stadium opens"), but there's an interesting comment at the end: "Monument Vice President Russell Hines said his company would be willing to lease the garages [under the company's planned development one block north of the stadium site] to the city for ballpark parking in 2008 because the office buildings will not be completed until the next year. If the city's fee is high enough, Hines said, Monument might even be willing to delay construction of the offices. 'There may be a solution where we agree to delay completion of our buildings in order to provide parking until another parking solution is provided,' Hines said. 'There's no deal yet, but we're willing to talk.' "
More posts: parking, staddis, Nationals Park
 

From WTOP: "Herb Miller's Western Development Corporation Baseball Partners rejected a deal from the city to develop parking and retail at the new stadium for the Washington Nationals. The move puts the city at risk of default on the stadium agreement with the Lerner Family. That agreement calls for the city to provide 1,225 parking spaces at the site by opening day in April of 2008. If the District is unable to provide that number of spaces, the Lerners could sue the city for damages. [...] Those options include creating surface parking around the stadium as an interim fix until more permanent parking can be developed. The D.C. Zoning Board has ruled the parking cannot preclude other development on the site, such as retail. " It appears that what they're now arguing about is how much Miller gets compensated for the deal falling through. More as I get it (and perhaps the Post will give us some clarity, this seems a bit jumbled). UPDATE: Here is the WashPost story, which doesn't tell us much that we haven't already heard. The article is a bit overwrought when it says "The dissolution of the Miller project could have far-reaching consequences on the entire baseball experience and the city's planned revival of the waterfront." -- after all, there are millions of square feet of office, residential, and retail projects planned for around the stadium, whether the Garages Wrapped With Development Goodness got built or not. Next step, trying to put 925 parking spaces on the northern edge of the stadium site by Opening Day 2008.
More posts: parking, staddis, Nationals Park, zoning
 

If you're an obsessive viewer of Clark/Hunt/Smoot's Stadium Construction Webcam, you already know this, but for you folks who don't check it every fifteen minutes, I'm passing along the news that they've added a second camera angle, now looking from the north of the stadium site. (It appears to have been set up on the roof of 20 M Street.)
More posts: Nationals Park
 

From Saturday's Post: "District government officials believe a plan to build condominiums and parking garages adjacent to a new baseball stadium in Southeast Washington is in danger of collapsing and have offered to buy out the developer for nearly $1 million." The short of it--the city has delivered a contract to Herb Miller for the project, but the contract would need approval from Lerners, which it most likely would not get. So the contract also has in it a $990,000 payment to Miller if the deal falls through (Miller is quoted later in the story as saying he's incurred $5.5 million in design and other costs on this project, at the city's request). Why $990k? Because any payment more than $1 million requires city council approval. So, what would happen? "If Miller's towers are not built, commission officials have said they would consider paving over the area to provide surface-level parking spots with the potential for future development. Another possibility would be to ask the D.C. Council for more money to build garages underground or aboveground, commission officials said." Miller has until Wednesday to sign the contract, so we should know the resolution on this before too much longer. Or, have I said that before?
More posts: parking, staddis, Nationals Park
 

In advance of the Sept. 18 Zoning Hearing, representatives on behalf of the development project at Florida Rock made a presentation to last night's ANC 6D meeting on some changes that they've made to their design after consulting with the Anacostia Waterfront Corporation as the AWC works to create a Ballpark District around the stadium. One big change is a 52,000-sq-ft increase in the amount of retail planned for the site, now pegged at 92,000 sq ft. Much of it will be along Potomac Avenue, facing the stadium, but also in the first three stories of the office building planned for the eastern part of the site, at First Street--it's in this location where the AWC is now envisioning a 39,000 sq ft public plaza, with some of the WASA waterfront land being used for this park (Florida Rock has offered to contribute $3.5 million to the design, development, and initial maintenance of the plaza). It would serve to far better connect the stadium to the Anacostia River, and with the retail there as well, it's hoped it could be a destination that would draw many people down to the southern side of the stadium. Florida Rock has also been able to tweak the design of the western side of their land (which for now is under the old Frederick Douglass Bridge), and will now be able to build a large pedestrian pier sticking out into the Anacostia in that area. They've also been able to "twist" the upper floors of a the buildings to allow for much more open views. Building heights, density, and the 75-ft-deep esplanade along the riverfront all remain the same. In a stunning display of unanimity (for them), the ANC passed a resolution in support of the changes 6-0. I hope to have updated renderings and site maps of the new design within the next few weeks.
 

Busy day of photo taking (though I wish it hadn't been so dang hazy), and so look to the following pages for new photos: 20 M, the ballpark, Capper/Carrollsburg (where the 3rd/4th/I/K block is now almost demolished) and Capper Seniors #2. If, as I suspect, 70 I and 1100 1st/100 M are about to start, I'm just going to have to start sleeping in my car, camera in hand :-).
More posts: 20 M, 400m, Capper, Capper Senior Apt Bldgs, Nationals Park
 

From the Washington Times, "Ballpark Project Progressing Well": "Officials from the D.C. Sports and Entertainment Commission said yesterday they are pleased how quickly construction of the Washington Nationals' ballpark along South Capitol Street is progressing. With about 19 months left to complete the $611 million stadium in time for its official unveiling in April 2008, the ballpark construction team is nearly done placing several thousand pilings that will provide support for the stadium. In addition, much of the main concourse at the southeast section of the stadium is near completion. [...] Clark Construction has said the ballpark likely will be completed on time as long as the steel framework is in place by October. The project is on target for that goal, officials said." The article also mentions that the new DC United stadium across the river at Poplar Point will probably not be ready before 2009. (It's not in Near Southeast, but I know there's a lot of interest in it.)
More posts: Nationals Park
 

From today's Post, word that negotiations between Herb Miller and the city on the Garages Wrapped with Development Goodness have "bogged down because of financing complications," and the city fears that his proposal will fall through and have "begun developing a plan that relies heavily on surface-level parking lots." It says that negotiations are to resume today--interesting timing of this story, then!--and that the main issues are whether the plan violates the $611 million stadium cost cap and who will pay for any overruns. The story says that if the deal falls through, "The sports commission has explored the possibility of paving over the five-acre plot north of the stadium to provide surface level lots for the scheduled opening of the stadium in April 2008. A temporary one-level garage might be included to reach the required number of parking spaces. Under that plan, additional development could be built in the future by Miller or another developer."
More posts: parking, staddis, Nationals Park
 
1142 Posts:
Go to Page: 1 | ... 78 | 79 | 80 | 81 | 82 | 83 | 84 | 85 | 86 ... 115
Search JDLand Blog Posts by Date or Category