Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Sep 09, 2015
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2 Blog Posts

Many moons ago, I decided that the written-in-stone boundaries of JDLand coverage stop where the Southeast quadrant stops--in the middle of the South Capitol Street median. (This was also written into the peace agreement negotiated with SWill.)
But I can't completely ignore the recent news that Ronald D. Paul Cos. has now bought 31,000 square feet of land south of N Street, directly across from the Nats Park, and just north of Camden's 1325 South Capitol apartment building.
And while WBJ says the company "is in no rush to build," according to SWill this is part of a joint venture with Altus Realty Partners to build 1319 South Capitol, a 250-unit building that could get underway in 2016.
The rendering below is paired with a photo of mine from 2013 from a strikingly similar angle:
As seen in the drawing, the new building is designed to for an L shape around the existing rowhouses on South Capitol.
The project will need to go through zoning hearings since that stretch of South Capitol St. SW is covered by the Capitol Gateway Overlay.
This tidbit also gives me an excuse to post photos of the Jas. T. Warring building (Est. 1918!) building that used to be on the site until it disappeared sometime in 2008 or early 2009.
 

Skanska has announced today that restaurant Circa will open a new location in the ground floor of 99 M Street, the office building just now getting underway on the southwest corner of 1st and M Streets, SE.
The restaurant will take 5,000 square feet in the building's corner space (seen in the rendering) and will have both indoor and outdoor seating.
Circa also currently has locations in Foggy Bottom, Dupont Circle, and Clarendon, and is part of the Metropolitan Hospitality Group, which also operates three restaurants in Merrifield.
This is the first announcement of any tenants for 99 M (either retail or office space), though Skanska's Rob Ward is quoted by WBJ as saying that they are in talks with a "handful" of prospective office anchors.
Circa serves a full menu (including lunch and brunch) at its other locations, "offering American style cuisine with international flair."
This building is on the north end of the stretch of 1st Street between M and N just north of Nats Park, a strip where the Hampton Inn is wrapping up construction and where Grosvenor's Residence Inn and F1rst residential buildings are getting their vertical construction started.
It's not expected that 99 M will open before late 2017.
 




                  © Copyright 2025 JD.