One of the top three questions that gets asked here at JDLand is "When is a grocery store coming to the
Near Capitol Ballpark River Yards area?" (Well, maybe it doesn't get asked quite like that.) For a number of years there's been a planned grocery space on the
southeast corner of 4th and M, as part of the first phase of development at the
Yards; but thanks to the Economic Difficulties there hasn't been any recent indication of when (or if) that building might get underway.
However, it seems that the wheels are finally beginning to turn, and Forest City is now starting the process of shepherding a revised design for the site (known as "
Parcel D") through the city's planning processes. And it appears that a full-service grocery store could be arriving in the neighborhood by late 2013 or early 2014. While that's not exactly right around the corner, those dates would seem to be an improvement over "someday, we hope."
These new designs replace the original plans for one office and one residential building with a single
220ish-unit apartment building, with 20 percent of the units earmarked as affordable housing. The 50,000 square feet of
ground-floor grocery store space would still be at the north end of the block (near the red brick wall and turret), plus there would be additional retail space that would include a
three-story fitness and spa facility. (And note that this is new construction, on a currently empty lot--the large red brick Gun Mount Shop just to the east of Parcel D is a separate project known as "
Factory 202", designed as condos in the original plans.)
Forest City is hoping that construction could possibly start in early 2012, with a delivery in late 2013 or thereabouts. (But, repeat after me: dates like this are not written in stone.)
No names are officially attached to either big retail space at this time. However,
WBJ reported a year ago that
Harris Teeter has signed a letter of intent for the grocery store space, and, gosh,
Vida Fitness sure is hanging around in the neighborhood a lot these days! Plus Vida said
a few months ago that they have plans to open a branch in the Navy Yard area in 2013.
These new designs will apparently be presented to ANC 6D on Monday (a meeting which I, alas, will be missing), plus they are on the
agenda for Thursday's Commission of Fine Arts meeting. They should also be going to the Zoning Commission at some point, so more details should become available as the process goes along.
I hope to have renderings of the new design soon, and will update this post when I get them. In the meantime, you'll have to settle for some renderings
on my project page of the old original designs for 401 M and 400 Tingey from back in 2007.
UPDATE: Renderings have now been added to my
401 M/Parcel D page. A little taste of Southwest DC in the apartment building design, isn't there? The fitness/spa facility at Fourth and Tingey is much more modern (and I believe it will have space for some additional retail as well).