Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Mar 12, 2007
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


4 Blog Posts

A press release today from Lerner Enterprises: "Lerner Enterprises, Washington D.C.'s largest private real estate developer, is pleased to announce the substantial completion of 20 M Street, SE, a 190,600 square foot 10-story Class 'A' office building located in Washington D.C.'s Southeast Corridor. 20 M Street is situated across from the Navy Yard Metro and two blocks from the new ballpark of the Washington Nationals." The press release touts the building's views of the Capitol and the Nats Ballpark, and its LEED Gold rating by the US Green Building Council. Missing from the release, it should be noted, is any announcement of tenants for the building; as of now, none have been announced that I've heard. As for "substantially completed", the building itself doesn't look 100% open for business, but the sidewalks are now completed and open, so I guess that's good enough. You can relive the before-and-afters on my 20 M Street page, and I've also updated the office tab of my Project Directory to move 20 M to the Completed list. (And you'll note that 55 M and the other portions of the Monument Half Street project are now listed in the directory as "Under Construction.")
More posts: 20 M
 

(I was out of town last week, and am also currently under the weather, so I'm only slowly catching up.) At some point during the past week, more buildings on the footprint of the Monument Half Street project met the wrecking ball, giving us some new additions to my Near Southeast Demolished Buildings page. There's also getting to be quite a hole already on the north end of the lot, around the Navy Yard Metro entrance at Half and M.
 

It took awhile to get into the city's Real Property Sales Database, but it can now be reported that WMATA sold its land on the east side of Half Street and one parcel on M Street to Monument Realty on Dec. 26 for $15.4 million. This is the land on top of the Navy Yard Metro stop east entrance that's now going to become the first part of Monument's Half Street/Ballpark District mixed-use development; as part of this deal, Monument is handling the renovation/expansion of the subway station, already underway.
 

The draft agenda for the March 12 ANC 6D meeting has been sent out (although not posted on their web site as yet, alas), and there are a few Near Southeast items of interest: discussion and vote on an construction agreement (presumably between the developers and the neighborhood/ANC) for 1325 South Capitol Street (the 276-unit residential project across from the ballpark); a presentation on modifications being requested in front of the Zoning Commission to the plans for the office building at 100 M Street (I don't know any details, will post when I find out); and a presentation on streetscapes at the The Yards/Southeast Federal Center (ooooh, more hints of moving forward!). There's also a meeting on the planned Monument Realty project on the Randall School site at Half and I Streets SW (blissfully outside of my purview). The meeting is at St. Augustine's Church at 6th and M Streets, SW at 7 pm.
UPDATE: The 100 M Street change is quite minor, according to Opus East, a result of actual construction drawings evolving from the original design drawings. I also hear tell that First Street is going to be widened at some point by DDOT, which means that 100 M and Onyx on First won't have a wide/deep sidewalk along as originally thought. (I don't have any details on the First Street work.)
UPDATE II: The ANC 6D report in the new issue of the Hill Rag has more details on the 1325 South Cap construction agreement as discussed at the February meeting, though I don't know whether it's changed or not going into tonight's meeting. It also says the project has 276 units, not 244 as I've been reporting.
 




                  © Copyright 2025 JD.