Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Jan 25, 2007
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2 Blog Posts

Since they aren't operating in Near Southeast anymore, I'm not tracking them, but for those who are still interested, here's a good roundup by the Metro Weekly on what the owners of the Nexus, Wet/Edge, and the O Street nightclubs are up to in terms of finding new venues.
More posts:
 

Today's Post has a big cool graphic showing exactly how the Frederick Douglass Bridge is going to get renovated this summer, with 800 feet of the South Capitol Street viaduct being demolished completely north of Potomac Avenue and another 580 feet of the bridge lowered so that the bridge meets street level at Potomac Avenue instead of O Street. It also shows that there will be new stop lights on South Capitol at Potomac Avenue and at N Street, and pedestrian-activated lights at O and P streets. The graphic (make sure to look at it, it really is well done) accompanies an article about the bridge's renovation. And remember, the northbound (inbound) lanes of the bridge will be closed starting this Friday at 10 am until Monday the 29th at 4 am. And plan your summer vacation to coincide with July and August, when the bridge will be closed entirely for the lowering. And here are some additional views of the portions of the bridge that will be demolished and lowered. (And I'm realizing I'd better create a Bridge Makeover page to pull these all together in one place!)
UPDATE: Yeah, a new page to track the Bridge Makeover, that's a really good idea.
UPDATE II: Here's DDOT's press release on the rehabilitation of the Douglass Bridge, along with a map of this weekend's detours.