Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Jan 07, 2014
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

The neighborhood appears to have (yet) another residential project likely to get underway in 2014, as the DC Housing Authority has finally gotten the financing together for the long-planned 195-unit mixed-income residential building at 7th and L SE, on the site of the old Capper Seniors building.
The building permit for the project was approved a few months ago, and with money now in place, it's expected that dirt should begin to move within a few months ("expected" as always being the key word). This building, which will face the Marine Bachelor Enlisted Quarters across L, will be all rentals, and will have 39 affordable housing units alongside the market-rate offerings.
Documents filed with the Recorder of Deeds refer to the project as "The Lofts at Capitol Quarter." The building will be run by Forest City's residential management arm, and will have a fitness room, roof decks, interior courtyards, and meeting space. It's expected to take about 20 months to complete once construction begins.
Nats fans may be a bit chagrined by this news, though, since the new building will take out a chunk of Economy Lot W, cutting the number of spaces down to 186 once the lot is reconfigured (hopefully by Opening Day).
Note that this building is only on the north side of the block, which is why Lot W isn't disappearing completely--yet. The south side is slated to someday be a sizeable office building, though no start date appears to be anywhere on the boards for that.
This will be the first mixed-income apartment building to come out of the Capper Hope VI redevelopment; the first two apartment buildings completed--Capper Seniors and 400 M--are both all affordable-housing units. Four (or maybe five) additional residential buildings, with another 900-plus mixed-income units including about 285 affordable units, are still to be built before Capper reaches full build-out of its residential component.
This project is now on the 2014 docket along with Forest City's Yards/Parcel N, WC Smith's 800 New Jersey (aka The Whole Foods Building), and Donohoe's 1111 New Jersey, if these developers can make it past my jaded skepticism about announced start dates (well earned during the Lean Years of 2008-2012) and start building.
Already under construction and expected to open in the next year or so are rental projects Twelve12, River Parc, and the Park Chelsea.
And, when the Lofts at Capitol Quarter are completed, the south side of L Street between 5th and 7th will look a little different from what was there before:
 




                  © Copyright 2025 JD.