Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Jan 05, 2012
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

UPDATE: The new span will indeed open on Saturday, Jan. 7, as confirmed Thursday evening by a DDOT tweet. Watch for detours during the day as they make the switch.
On Tuesday, DDOT tweeted thusly: "Traffic alert: if the weather holds, we expect the new outbound 11th Street Freeway Bridge to open this Saturday."
They also sent out a handy YouTube video explaining the phases of construction that the entire project has seen so far and will see before all is finished, which I urge you to watch so that I don't have to try to summarize it all for the 7,000th time.
One item in the video that I hadn't seen mentioned before (it's at about the 45-second mark): with the opening of the new outbound freeway bridge, commuters from the Southeast Freeway/I-695 who want to get into the neighborhoods just east of the river will need to exit at 6th Street SE and get themselves to the existing ramp at 11th and O SE to go across the old outbound bridge. This will be until the new 11th Street Local bridge opens this summer. So watch for some traffic tieups at the 6th Street ramp and along Virginia Avenue, 8th Street, and M Street.
Dr. Gridlock has more on the changes, and my 11th Street Bridges project page has overviews of the entire reconstruction.
Comments (0)
More posts: 11th Street Bridges
 




                  © Copyright 2025 JD.