Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Jan 05, 2007
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

UPDATE, 1/5: Adding a link to this piece in today's WashTimes on the Anacostia trolley pilot, which doesn't include much new info, but the Bloomberg piece linked to below has disappeared, so this is good to have; in the meantime, be sure to ignore other pieces like this one that try yet again to say that the Bolling line will connect riders to the baseball stadium by 2008, which is just patently false.
Hat tip to the CHT Shareholder Community blog for finding this Bloomberg article, "Washington Trolleys Go Back on Track in Mass Transit Encore," which discusses the plans that have been in the works since 2003 to bring light rail to DC. One thing that the article doesn't quite make clear--when it's talking about building the first 2-mile line (describing it as "pass[ing] near the Washington Nationals' new downtown ballpark"), it's glossing over the fact that this test line is being built in Anacostia, along the east side of the river, whereas Near Southeast and the stadium are on the west side of the river. You can go to the DC Transit Future web site to learn more about the Anacostia Streetcar Project (the test line) and about the long-range plans. The planned corridors do include M Street SE, the 11th Street Bridges, and South Capitol Street. But this project has had many delays over the years (see my first post on it, from October 2003), the Anacostia test line is already at least three years behind schedule; but at least back in October the Transportation Planning Board allotted $3 million to the Anacostia Streetcar Study and added the first phase of construction to the Constrained Long Range Plan, so it's finally getting some funding. But, In other words, don't plan on buying your tokens just yet :-).