UPDATE, 1/5: Adding a link to
this piece in today's WashTimes on the Anacostia trolley pilot, which doesn't include much new info, but the Bloomberg piece linked to below has disappeared, so this is good to have; in the meantime, be sure to ignore other pieces
like this one that try yet again to say that the Bolling line will connect riders to the baseball stadium by 2008, which is just patently false.
Hat tip to the
CHT Shareholder Community blog for finding this Bloomberg article, "
Washington Trolleys Go Back on Track in Mass Transit Encore," which discusses the plans that have been in the works since 2003 to bring light rail to DC. One thing that the article doesn't quite make clear--when it's talking about building the first 2-mile line (describing it as "pass[ing] near the Washington Nationals' new downtown ballpark"), it's glossing over the fact that this test line is being built in Anacostia, along the east side of the river, whereas Near Southeast and the stadium are on the west side of the river. You can go to the DC Transit Future web site to learn more about the Anacostia Streetcar Project (the test line) and about the long-range plans. The planned corridors do include M Street SE, the 11th Street Bridges, and South Capitol Street. But this project has had many delays over the years (see my first post on it, from October 2003), the Anacostia test line is already at least three years behind schedule; but at least back in October the Transportation Planning Board allotted $3 million to the Anacostia Streetcar Study and added the first phase of construction to the Constrained Long Range Plan, so it's finally getting some funding. But, In other words, don't plan on buying your tokens just yet :-).