Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Parcel A/Yards
See JDLand's Parcel A/Yards Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


41 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5

It was reported in Wednesday's Post that a contract has been awarded to build at Ft. Belvoir the new home of the National Geospatial-Intelligence Agency, the super-secret, don't-even-think-of-pointing-that-camera-at-this-building agency that currently occupies the windowless white box at First and M. As part of the Base Realignment and Closure (BRAC) plan, NGA must be moved to Ft. Belvoir by Sept. 15, 2011; and they actually have pretty detailed page about the move on their web site, if you want to know more. It estimates that workers at what's known as Building 213 at The Yards/Southeast Federal Center would be moving in late 2010 and 2011. Once they're gone, that very valuable lot at First and M would be redeveloped as office space as part of the later phases of construction at The Yards, presumably without the high fences and gun-toting guards.

More posts: The Yards, Parcel A/Yards
 
41 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5