Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Velocity Condos
See JDLand's Velocity Condos Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


73 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8

The Washington Times (worried about potential undesired neighbors at its offices on New York Avenue) is reporting that the gay nightclubs Edge and Wet, which operated at Half and L until September, want to move to 2046 West Virginia Ave. NE, not far from where its old neighbor Club 55 is trying to move (3350 New York Ave.). ANC 5B is opposing both moves.
More posts: Restaurants/Nightlife, Square 699n, Velocity Condos
 

In the second part of today's Dana Hedgpeth column in the Post, various developers of projects near the stadium (Monument Realty, Faison, and Ron Cohen) are quoted about their feelings on the tortuous process that led to the aboveground parking garages at the baseball stadium. Said F. Russell Hines of Monument Realty, who owns much of the land directly across N Street: "It's an unfortunate solution[.] Our development would be better if there was complimentary retail and a mix of uses on the other side of N Street. It's not a disaster . . . but this is a significant setback[.] We spent months and months of great plans of what this area was going to look like with the Anacostia Waterfront Corp., and in the end it feels like it's every man for himself. We're going to do what we can to create an area where people come off the Metro and they walk along the streets, where there's restaurants and stores and a real experience." (I wonder if this could be interpreted as also a bit of a smack against the AWC's still-never-released "Ballpark District Master Plan" process.) One of Monument's principals, Jeffrey T. Neal, is quoted as saying "We have a vision for Half Street SE between M and N streets Southeast that has the potential to be one of the most exciting neighborhoods in the mid-Atlantic, but that vision won't happen if the process looks like the one that produced two parking garages[.] There's a better solution . . . than two parking garages. Let the private sector do it. There are zoning laws already in place." For balance, there's Ron Cohen, developer of Square 699N (bounded by Half, K, L, and 1st): It's not going to be good, bad or indifferent[.] "It would have been nice to have buildings lining the parking but there's so much activity and energy in that corridor that it doesn't make a heck of a difference one way or the other."
 

Friday's print edition of the Washington Business Journal reports that developer Ron Cohen has purchased the entire block bounded by Half, K, L, and 1st Streets, SE (square 699N), for $55 million, with plans for a mixed-use project that may include 650 condos, a hotel with condos, a stand-alone 250,000 sq ft office building, and possibly retail as well. Tenants on the block--including the nightclubs Wet, Edge, and Club 55--have been told that the buildings will be razed in late spring 2006. Phase I of the project will have 250 condos, and hopes are to begin construction in October 2006, and to have the entire project completed in four years. A few pictures of the block in its current state are on my South Capitol Street Corridor page (you'll have to scroll down a bit for them--this project will eventually get its own page, but not just yet!).

 
73 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8