Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Retail
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


278 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 28
Search JDLand Blog Posts by Date or Category

Getting caught up on a few things after my terribly busy week of laying on the sofa rehabbing my hip:
* NAVY YARD DENTAL OPENS: Now open and accepting appointments in the ground floor of the 55 M Street office building at Half and M (the one on top of the Metro station entrance) is Navy Yard Dental, where Chad Jones, DDS is available for all your toothy needs. (Sorry I don't have a current photo. Will update with one when I get there.) But maybe don't race across the street to Shake Shack right after getting your teeth cleaned.
* BISCUITS POPPING UP: Commenter Ampersand reports that Eater DC reports that next week Ice Cream Jubilee will partner with the Mason Dixie Biscuit Co. to offer savory biscuit sandwiches and shortcake-like strawberry sundae sandwiches during afternoons through the end of May.
* CLOSING THE ROOF: The Virginia Avenue Tunnel construction team reports that the final roof panel of the entire two-tunnel project was placed this week. Still a lot of work to do, but CSX says that the project remains "on time" and expected to be completed this fall.
* SPEAKING OF CLOSINGS: I mentioned this in my last post, but that was forever ago so I'll mention again that in order for the tunnel project to continue along toward completion, CSX is expecting to temporarily close both the 4th Street and 5th/6th Street intersections next week, possibly as early as March 14. The closures are expected to last 3-4 months, and it means that the now-once-again-two-way 3rd Street will be seeing a lot of extra traffic.
* VAN NESS SILENT AUCTION: Sorry to mention this with only a day left to go before it finishes (I did mention on Twitter and Facebook, at least), but the Van Ness Elementary PTO is having a silent auction fundraiser, and among such items as tickets to see Pink, dinner at Rose's Luxury, Nats tickets, and other highly enticing offerings is the chance to take a neighborhood walking tour guided by none other than yours truly this spring. (Or, if I haven't recovered sufficiently, the chance to pull me around the neighborhood in a little red wagon.) There are ten bidding slots to win two tickets, with the bids right now ranging from $45 to $75 with 24 hours to go.
 

Some stories people have been waiting to hear about for a while:
* MOVIE THEATER MOVING FORWARD: WBJ reports that "D.C. Water, developer Forest City Washington and the District government have settled all outstanding business tied not only to the parcel needed for the long-planned 16-screen, 1,500-seat movie theater, but other sites surrounding it that are similarly planned as part of The Yards."
Forest City should receive the movie theater land in late spring, apparently, with the other residential-planned parcels to come probably over the next five years.

* LERNER BUYS 49 L: The General Services Administration announced this morning that the sale closed on Feb.22 for the one-story brick warehouse on the southeast corner of Half and L, SE.
Property records show that "Half Street Partners, LLC" paid $31 million for the site. And that LLC happens to have a mailing address of 2000 Tower Oaks Blvd., Eighth Floor, which happens to be the address of Lerner Enterprises.
No word yet on the plans for the site, which is (sort of) across the street from Lerner's 20 M office building, and also creates a sort-of Lerner-owned triangle with...

* 1000 SOUTH CAPITOL MOVING FORWARD: Lerner officially announced this week its plans to build the 250-unit 13-story residential building at South Capitol and K that has been working its way through the design and zoning process for the past few years. Designed by Shalom Baranes Associates, it will also have 10,000 square feet of retail along with the lineup of amenities befitting a new "luxury" building--fitness center with Pelotons, private dining room with demonstration kitchen, rooftop pool and entertainment center, and pet spa and bicycle repair offerings for residents. It is expected to get underway late in 2018.
UPDATE: And now we have one more piece of neighborhood news from WBJ today, which is that it has finally been officially announced that the new hotel at 3rd and Tingey in the Yards will be a Thompson boutique hotel.
(Though it must be noted that the WBJ story doesn't seem to quite realize that the hotel is already under construction, in a joint digging-and-building project with Forest City's next residential building, on Parcel L.)
The hotel will have 225 rooms, and the residential building will have about 270 units, and combined the two will have about 24,000 square feet of retail.
 

It has taken me much longer to clear the post-surgical cobwebs from my brain than I expected, so don't have many expectations for this post. I just hope it's in English. (But the hip repairs--NOT REPLACEMENT!--went well, and I should start getting off of crutches soon.)
* SPRINT STORE: I have said for years that no new neighborhood has truly arrived until it gets its first cellphone retailer, and I would not have guessed it would take until 2018 for that box to get checked, but numerous approved building permits indicate that Sprint will be opening a store in the old Sizzlin' Express space on the northwest corner of 4th and M.
* DOUGLASS BRIDGE GROUNDBREAKING: As if to taunt me after 15 years of watching and waiting, the Feb. 13 ceremonial groundbreaking for the new Douglass Bridge and associated first-phase improvements to the South Capitol Street Corridor was held while I was very much horizontal and hopped up on goofballs. But since it's right on our DMZ line, SWill was there and took some photos. Estimated completion date is 2021. (Speaking of SWill, he is the one to read for coverage of Buzzard Point, since that is outside my purview.)
* TUNNEL DOINGS: The last section of wall on the new Virginia Avenue Tunnel was poured on Feb. 22. an effort that overall totaled three miles of 24-foot-tall concrete. Meanwhile, 3rd Street should be reopening to two-way traffic Any Minute Now, which then paves the way (sorry) for both the 4th and 5th Street intersections to close, probably in mid-March, to dismantle the temporary bridge decks and complete the new tunnel's roof in those blocks, and wrap up the final street restoration. And no, the 6th Street exit ramp from the freeway won't close. The entire project is "on time," for completion this fall, according to CSX.
* ANOTHER PROJECT READY TO GO: A shoring/sheeting/excavation permit has been approved for the second phase of the "Riverfront" project, aka the Florida Rock site. This will be a 13-story, 260ish-unit residential building with about 12,000 square feet of retail, and will go up immediately to the west of Dock 79. When I'm a little more mobile I'll write a roundup of what's currently underway.
* WINERY HAPPY HOUR: If you don't have a supply of post-surgical painkillers like some people, there's now a Happy Hour at District Winery, from 3:30 to 6:30 pm Monday through Friday, with $8 signature cocktails and select wines, $5 select beers, and 50 percent of District Winery wines by the bottle.
There's probably more, but this wore me out. Hey, it's a start.
 

A few of these deserve their own posts, but, well....
* DECLARATION DECLARING: A press release from Grosvenor says that Declaration will be opening at F1rst, in mid-March, as the building's first full-service dining option. "This new location will be double the size of its counterpart in [Shaw] and will offer pizza and Philadelphia-oriented menu items, including some ballpark staples." The release also says that Barre3 will open in spring late summer or fall [error in press release, I'm told]. With these openings, only one retail space at F1rst remains unleased.
* BARRACKS DECIDING: The Record of Decision and Final EIS for the new Bachelor Enlisted Quarters have been published, ending a study phase that feels like it began in 1936. The chosen site plan is to build the new BEQ immediately to the north of the barracks at 7th and L, SE (Building 25), which will spell doom for either some or all of the athletic field (it's been so long, I don't remember anymore). Read the MBEIS web site for actual details that aren't from memory.
* SOUTH CAPITOL PROJECTING: DDOT announced some temporary lane closures this week in multiple locations "for pre-construction work associated with the South Capitol Street Corridor Project and the new Frederick Douglass Memorial Bridge project." I believe this is the first mention of "pre-construction work" for these projects--or at least they are since the design-build contract was awarded.
* PEPCO DISRUPTING: ANC 6D07 Commissioner Fascett reports that PEPCO will be digging up portions M Street SE between 1st and 6th and 1st south of M to install underground pipes and then cables during February and March. Watch for daytime traffic disruptions weekdays and Saturdays.
* WILLOW VALENTINING: If you are in a red-heart mood on Saturday (Feb. 10), retail boutique Willow is having a Valentine's Day party, from 11 am to 7 pm. There will be valentine-making, cupcakes, a photo booth, and more. (Strangely, the valentines give out all look like this.) Willow is in the ground floor of Arris, on Water Street across from District Winery, just north of the Yards Park.
 

It looks as if Insignia on M has a tenant for the retail space at New Jersey and L, in the same block as the Metro station entrance. There's a placard now posted that Navy Yard Wine Merchant* has applied for a Class B liquor license, which allows the sale of beer and wine--and has also included a request for a tasting permit. ANC 6D's ABC Committee will be taking this up later this month, and the full ANC could be expected to vote on whether it will support the application at its February meeting.
In other tidbits I've been meaning to pass along:
* ZAC BROWN: Normally Nats Park hosts a big concert during the All-Star break, but the stadium will be otherwise occupied during that stretch, and so this summer's big show, the Zac Brown Band, will be on July 27. Tickets are on sale now. UPDATE: And I've been reminded in the comments that this is actually the second of the big summer shows, with the Eagles and James Taylor playing the night before.
* CHLOE: The Post's Tom Sietsema liked what he saw at Chloe, calling himself "bewitched" with the debut menu, and that "right out of the gate, Chloe feels like a keeper."
* TUNNEL: The next "Coffee with Chuck" status meeting on the Virginia Avenue Tunnel is on Wednesday, Jan. 24, from 8 to 9 am at the CSX office at 861 New Jersey Ave., SE. There is lots of work in the 300 block of Virginia Avenue these days to turn it back into an actual street, with the beginnings of curbs and sidewalks and preparations for drains and streetlights, as well as working toward returning the entrance to the Capitol Quarter driveway to its original path from Virginia.
* PSA 106: This month's PSA-106 meeting is Tuesday, Jan. 23, at 7 pm at the Capper Community Center at 5th and K, SE. MPD holds these meetings to discuss residents' concerns and questions about public safety issues.
I took a bunch of pictures this weekend, but will write about that when I recover.
* I assume this is the actual name, but cannot say with 100 percent certainty.
 

What with all those New Year's resolutions floating around, it makes sense that word has gotten out today that Barre3 has signed a lease to occupy the space immediately north of Solidcore in the ground floor of the F1rst apartment building on 1st Street, SE, south of M.
This will be the fifth DC location for the chain, which "mixes athleticism, grace, and the latest innovations designed to balance the body," according to its web site.
The studio is expected to open early fall-ish 2018, and joins Taylor Gourmet, Chop't, Chipotle, Roti, Rasa Indian Grill, the aforementioned Solidcore, and the still-to-come Declaration.
{And no, it's not your eyes, the photo is blurry. Sigh.}
Comments (18)
More posts: barre3, F1rst Residential/Hotel, Retail
 

With thanks to reader I.F. for the photo, may I present visual confirmation that Whole Foods is indeed still coming to the ground floor of WC Smith's Agora apartment building at the corner of New Jersey Avenue and H Street, SE.
I don't know a timetable, I know nothing more than this sign, but at least this should settle people's worries a bit.
We now return to our holiday weekend, already in progress.
Comments (42)
More posts: Agora/Whole Foods, Retail, wholefoods
 

Interested parties are putting out the word that there's a Grand Opening party this Friday, Nov. 17, for Willow, the clothing and gift store that is opening its second location in the ground floor of the Arris apartment building at 4th and Water in the Yards.
Not only will there be treats and drinks and lots of stuff to buy, but "every guest will receive a complimentary Willow-designed Navy Yard shot glass."
The party will run from 5 to 8 pm.
Comments (33)
More posts: Retail, willow, The Yards, Arris/Parcel N/Yards
 

Word is out that Solidcore* will be opening for your high-intensity low-impact workout pleasure at 8 am on Saturday, Nov. 4, in the ground floor of F1rst.
The official web site for this location allows reservations for upcoming classes, and also has some grand opening deals available ($4 for your first class, plus 10-pack and 1-year membership specials).
Regrettably, I did not get a chance to swing by for an updated photo before posting this, so here's my most recent shot of the Solidcore location, located next to soon-to-be-Rasa on 1st Street SE between M and N. (Official street address is 1245 1st St. SE.)
* As for why I am not referring to it as [solidcore], it's because it would have been a divorce-level offense in my house.
Comments (13)
More posts: Retail, solidcore
 

I start with this photo of some recently posted signage, which I'm pretty sure debuted at the top of the list of Most Ignored Signs in Washington. (No one ever believes me when I tell them that riding bikes isn't officially allowed on the Navy Yard portion of the Anacostia Riverwalk.)
And now to a way-too-long pile of tidbits:
* PLAYOFFS: I doubt anyone at this point needs to tell me that the first of what will hopefully be numerous playoff games this October at Nats Park is tonight (Friday), when Game 1 vs the Cubs starts at 7:31 pm. They'll play again tomorrow at 5:38pm, and would return on Thursday Oct. 12 for the fifth game of the series, if necessary. Here's a rundown from the BID of playoff-related festivities and deals that might be of interest.
* WILLOW: I have been remiss in not passing along that DC-based clothing and gift shop Willow is going to be opening a second location in the ground floor of Arris, at 4th and Tingey in the Yards. As described in the BID newsletter, "The store brand adds a distinctive local twist with DC neighborhood-inspired gifts and clothes designed in-house by members of the Willow team."
* DOCKSIDE?: I have not confirmed this personally, but a reader reports being told by workers putting out tables on Thursday that the new Yards Park boardwalk kiosk outlet of Osteria Morini is expected to open this evening. UPDATE: Reader now says that no, it's Due South Dockside. But that's what I get for not reporting it out myself. {hangs head in shame}
* BYE BYE 37 L: Photographic evidence on Twitter of the demolition of the Empire/DC Flyer Cab company building, which is making way for a new residential building. It becomes the 175th entry in my Demolished Buildings Gallery (up a spot from its brief designation as #174, after a reader pointed out that I had neglected to add, of all things, the McDonald's, though I will give myself a break on that one, given the maelstrom in my life at the time).
* THIRD STREET CLOSURE UPDATE: Flashing signage north of 3rd and Virginia says that the four-month-ish-southbound closure is now scheduled to begin Oct. 11. (After the first two games of the playoffs, I might add.) I saw from the freeway yesterday that the huge reinforcing beams (more like tubes) that were installed across the footprint of the two tunnels are being removed between 2nd and 3rd Streets, and there's even now some small square footage where both tunnels are covered with dirt. (UPDATE: The sign was changed this morning to read "On or About Oct. 10," and now the latest VAT newsletter says "as soon as Oct. 9.")
* GARRETT TEA LEAVES: The building permits have been approved, and construction trailers arrived within the past few days at the staging lot on the former trash transfer site at 2nd and K, and so signs are pointing to work getting underway on The Garrett, the last of WC Smith's "Collective" troika. Joining siblings Park Chelsea and not-yet-open-but-newly-landscaped Agora, the Garrett will have about 375 rental units, and ground-floor retail. (No, I don't know when Whole Foods is opening.)
* PARC RIVERSIDE PHASE II: A reader who lives at Velocity says that management informed residents that work is expected to resume Any Second Now (or maybe already has) on the excavation for what will be the second phase of the Parc Riverside residential project, at Half and K.
* BOWER FLOOR PLANS: If you have been desperately awaiting the condo project known as the Bower to start selling, well, that hasn't happened yet, but floor plans are finally available on their web site. (h/t RMP)
 
278 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 28
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.