Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: officespace
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


32 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4

GlobeSt.com has a piece (free for seven days) on Opus East's purchase of the Nation site at 1015 Half Street--not really anything new from what I posted on Monday (441,000 sq ft, construction starting in October, $41.5 million price tag) except that the developers will apply for LEED Silver certification on the project (i.e., it'll be a "green" building). But mainly I'm using this new article as a hook to mention that Opus has put its 100 M Street building on the market as part of a three-building Class A office building portfolio (see Grubb and Ellis's listings here, which include this portfolio.) From what I understand, Opus would stay on as developer until the certificate of occupancy on 100 M is obtained. Looks like the deadline for offers is tomorrow, so get your checkbooks out.
More posts: 100 M, 1015 Half, Development News, officespace, Square 743N, square 697
 

The word has arrived that last week the rumored sale of the old Nation nightclub site at 1015 Half Street was completed, with Opus East (backed by institutional investors) paying a rumored $41.5 million for both the land and the existing plans for a 411,000-sq-ft office building. The fine folks at Opus tell me that they are planning to start construction (on spec) in October, with delivery of the building by October 2009. You can see a rendering of the glass-a-riffic building, which will front Half, K, and L streets, on my 1015 Half Street page.

 
32 Posts:
Go to Page: 1 | 2 | 3 | 4




                  © Copyright 2024 JD.