Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: parking
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


258 Blog Posts Since 2003
Go to Page: 1 | ... 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 ... 26
Search JDLand Blog Posts by Date or Category

Thanks to the fine folks at DDOT, I've now gotten a hold of some of the documents from yesterday evening's public meeting on the stadium Transportation Operations and Parking Plan (TOPP). First, here's the slides presented by consultants Gorove/Slade about the TOPP, with maps and charts listing expected transit/auto/pedestrian traffic volume and flow. There's also an FAQ on parking, traffic, and other issues for Southwest and Near Southeast residents. In addition, DDOT handed out an FAQ on the Douglass Bridge improvements going on over the next few months, and they also had a number of display boards with information on the plans for the South Capitol Street corridor and other regional traffic issues. If you live in Southwest, or Near Southeast, or Capitol Hill, or Anacostia, or even Prince George's County, or if you're a baseball fan planning to come to the games, I suggest taking a close look at these.... (Some of them are kind of big files, be patient if they take a moment to load.) UPDATED to correct the link to the Gorove/Slade presentation; there's also now more slides (from DDOT and WMATA) available here.
More posts: Metro/WMATA, parking, Nationals Park
 

It was a tough call between swallowing a couple of bottles of hydrochloric acid or attending tonight's public meeting on the stadium's Transportation Operations and Parking Plan, but luckily for you my JDLand duties eventually won out. I'm hoping to get electronic versions of the slide presentations, so I'm going to just type up my notes for now, and hope that the details come later; besides, much of it will sound familiar to folks who read this blog regularly. There were presentations by DDOT and WMATA about their plans for the area, as a warm up for the discussion by traffic planners Gorove/Slade on the TOPP.
DDOT gave an overview of all of its near-term plans for Near Southeast--this includes the additional ramps to be added to the 11th Street Bridges, which already has funding and is moving at (bureaucratically speaking) lightning speed, and should be done by 2010. Then the planned improvements to South Capitol Street and the South Capitol Street Bridge were profiled, including this summer's festive demolition and lowering of the northern portion of the bridge. The current bridge itself will also be painted, and will get new lighting and pedestrian rails (more like the Pennsylvania Ave. bridge). Then there will be the streetscape improvements to South Capitol, Potomac, N, 1st, and I Streets, SE, all before Opening Day 2008, with resurfacing, new streetlights, curbs, etc. There will also be some small changes to the South Capitol and I intersection to try to improve the flow, although there are no current plans to expand the ramps to/from the freeway.
Next up was WMATA, giving a description of what's being done to expand the Navy Yard Metro station in advance of the throngs of baseball fans. The station's capacity is being upgraded to 15,000 customers per hour (the same as Stadium-Armory) from the current 5,000, turnstiles and Farecards machines will be moved to street-level, elevators will be added to the west entrance, and more, all while Monument Realty's 55 M Street office building is built on top of the station. The west entrance will be one-way outbound before games and one-way inbound afterwards, while the east entrance will remain two-way. Metro will also put in place the same plan of 9-13 extra trains after each game that they currently do for games at RFK, and that the system's recent receipt of nearly 190 new rail cars will also help increase capacity over the next 18 months. They are also looking at shuttles to other stations after games, and that the possibility exists that DDOT could expand the DC Circulator bus routes that currently end in SW to include the stadium area, with a route down M Street, up 8th, and over to Union Station, but that's not decided yet.
Gorove/Slade went through a lot of numbers, but I think in some ways didn't quite emphasize what the people attending wanted to hear most, which is that non-resident gameday street parking will be prohibited in basically all residential areas in Southwest and Near Southeast south of the freeway, and they'll be using the model that's been being refined in the Hill East neighborhood around RFK for the past few years (residents receive Event Parking permits to display, and also one guest parking permit per household). They estimate that for a sellout crowd 19,000 people will come via transit (16,000 through the Navy Yard station), 750 will arrive by charter buses, 400 by taxi, 3,400 on foot or bike, and 13,600 by car (in 4,700 vehicles). They indicated that the Nationals themselves are in charge of coordinating the parking negotiations with various sites, and a slide showed that the Nationals have identified about 5,200 parking spaces that can be available (well above the 4,700 vehicles anticipated to be coming to games). Only 185 of these spaces are in Southwest (between Half and South Capitol north of M); the rest are all in Near Southeast. While there are possibilities for parking in Buzzards Point, currently it appears the Nationals are not anticipating using that area for parking. No decision has been made yet on using the RFK parking lots and shuttle buses.
In terms of pedestrian flow at game time, many of the surrounding sidewalks are to be upgraded as part of DDOT's streetscape improvements. There will be traffic control officers at the major intersections, and Half Street SE south of M will be closed entirely to vehicle traffic, while some lanes on N will be closed; also there will be no parking at all on M Street or on 1st Street north of M on gamedays.
But what all the planners want is for people to come to games via public transit.
The questions from the audience centered mainly around the impact on the residential streets of Southwest and Capitol Hill, with great concerns about parking for visitors ("what if I'm having a party?") on game days. I imagine there will be more of the meetings, with more consternation, yet to come. And I also imagine that Opening Day 2008 will be rife with tales of traffic back-ups, transit snafus, and lost suburbanites unable to find their parking lots. And then the plans will be tweaked and re-tweaked, just as they have been around RFK for the past few years.
As I said, hopefully I'll have the slides and some other materials to pass along within the next few days. If you have concerns that you want to air, be sure to contact the DC Sports and Entertainment Commission, and cc ANC 6D (office@anc6d.org) so that the ANC can track the feedback.
UPDATE: See my entry with the slides from the meeting, now posted on my site.

 

A reminder about Thursday's big neighborhood meeting: "The public is invited to learn about the recommendations for the Traffic Operations & Parking Plan (TOPP) and to discuss issues pertaining to traffic planning for the new Ballpark District and nearby neighborhoods. Representatives from the DC Department of Transportation, Metropolitan Police Department, the Washington Nationals and the Sports Commission will be on hand. The meeting runs from 6:30 to 8:30 p.m. on March 29 at Southeastern University, 501 I St., SW. For information, call the new Ballpark Hotline at (202) 608-1112 or visit www.washdcsports.com."
UPDATE: You can now read my summary of the meeting and also see the slides.
More posts: parking, staddis, Nationals Park
 

On March 26 29 at 6:30 pm, the DC Sports and Entertainment Commission is holding a Public Meeting on the Nationals Ballpark Traffic Operations and Parking Plan, which should be a festive meeting-of-the-minds between the public and representatives of DDOT, the Metropolitan Police Department, the Nationals, and the DCSEC. See the front-page story from the April Southwester for more information. UPDATE, 3/27: It would help if I could *read* - the meeting is this Thursday, March 29, not yesterday.
More posts: parking, Nationals Park
 

At this point I hate to even utter the phrase "parking garages," but I would be remiss if I didn't pass along the news that this week building permit applications were filed for 25 N Street and 75 N Street (and another one for both addresses together), which would be the address of the two lots on the north end of the stadium site where the garages are to be built. The applications really don't tell you anything, but it's certainly a sign that the garages are moving forward. In other building permit news, Monument Realty has gotten its shoring/sheeting/excavation permit approved for their big Half Street/Ballpark District project, and they tell me they expect to have the site cleared by early March. (Alas, you can't yet see this approved permit in my DC Gov't Building Permit feeds module, because that feed has apparently been taking some snow days this week.)
More posts: parking, Nationals Park
 

A correspondent tipped me off to a bunch of newly posted renderings of the Nationals Ballpark, one of which is a gorgeous fully detailed rendering of the stadium at night, as seen from the southeastern edge of the site (at 1st and Potomac). I've added this rendering and a couple of the new interior views to my stadium page; to see the additional interior views, visit the Nationals New Ballpark page on MLB.com. Note in the new external image that the new garages (not wrapped with development goodness) are depicted for the first time (albeit on the opposite side of the stadium!). And the retail offerings along 1st Street are also shown with a bit more detail.
More posts: parking, Nationals Park
 

Now that the parking garage issue has been resolved (at least until Opening Day 2008, when hordes of stadiumgoers gasp in disbelief at what they're confronted with when they arrive and descend on the owner's box with pitchforks and boiling oil), I finally felt ready to tackle a reorganization of my Ballpark District page. Mainly I added a new "tab" specifically for the Monument Realty projects along Half Street, which also includes the expansion of the Navy Yard Metro station; I also added some additional photos of other Ballpark District sites. I hope to get renderings of the Monument residential project at Half and N and the W Aloft hotel mid-block before too much longer, but at least I do have drawings of the office building planned for Half and M (above the Metro station). And I now decree that the parking garages are on the stadium site, not in the Ballpark District, and will remain so until they get torn down and redeveloped, sometime around 2025.
 

More to come as the news stories come out, but I'll break the news here that the council passed 10-3 the resolution today to override the Zoning Commission's rule preventing the construction of aboveground garages on the stadium site. (In other words, they voted to approve aboveground garages.) Barry, Catania, and Schwartz were the dissenters. There was much discussion about whether because of language in the original agreement that after Sept. 1, 2007, the city will have to ask the Lerners for permission to develop the parking garage site on the north side of the stadium that the city will be doomed to never having development because the Lerners would never allow construction in that spot that would disrupt the ballpark experience. But the councilmembers who voted yes seem to feel that at some point in the future there is still the ability to tear down the aboveground garages and develop the land, which will only continue to escalate in value. One teeny item that creeped out of the debate that may be how they're getting this under the cost cap--Jack Evans mentioned that aboveground garages are now being planned for the 300 south side parking spaces, which Clark Construction says can be done for $1.6 million. If this is true, that they're now dispensing with the idea of a grand southern-side plaza (where hardly anyone will be arriving from anyway) then they should have just put 10-story garages right there and had all the parking on the south side. I imagine this is still not a finished discussion.... More to come. UPDATE: Here's the Post story, with a quote from Adrian Fenty that shows perhaps folks are starting to get the message that these two blocks are not the end-all be-all of Ballpark District development: "The land in question on the stadium site is a small percentage of the area around the stadium that is already being developed." UPDATE II: A little late on my part, but here's the WashTimes piece, with an explanation as to why the south side garages can be done so cheaply: "Sports commission officials said the city was able to save money because the Nationals relaxed their requirement for 300 spaces at the south side of the stadium. The stadium construction team, led by Clark Construction of Bethesda, said it can build the parking more inexpensively now with only 130 space at the south." And here's Tim Lemke's Q&A on the entire garages brouhaha, for those smart souls who haven't been paying attention. UPDATE III: If you're into self torture, this council session is available via on-demand streaming video.
More posts: parking, Nationals Park, zoning
 

From Tuesday's Post: "The D.C. Council appears poised today to approve a scaled-back parking plan for the new Washington Nationals baseball stadium that calls for building two free-standing garages just north of the ballpark, near South Capitol Street and the Navy Yard in Southeast. [...] The new plan would build garages without reinforcement at a cost of $36 million, which could be paid with existing funds and remain within the cost cap, city officials said. Essentially, the plan is what the Lerner group has pushed for since taking over the team in the summer. [...] Fenty said the Lerner group has promised to work with the city to potentially tear down the garages in future seasons if a solid mixed-use development plan is proposed."
More posts: parking, Nationals Park
 

Lookee here at what's popped up on the agenda for tomorrow's City Council session, a reading and vote on "Ballpark Parking Completion Emergency Declaration Resolution of 2006" and "Ballpark Parking Completion Emergency Amendment Act of 2006." (No sign of either of them in the online system, though.) I don't know what either of them contain, so we'll just have to wait for news to trickle out. The fun never stops. UPDATE: Speaking of the parking, WTOP is reporting that Herb Miller is suing the city, the DC Sports and Entertainment Commission and the Anacostia Waterfront Corporation, saying that his agreement with the city and Mayor Williams to build the Garages Wrapped With Development Goodness has not been honored. Says Miller: "D.C. will realize it has lost a remarkable opportunity to renew a neighborhood and provide hundreds of millions of dollars in economic benefit to the city. It is a major loss that didn't have to happen." (Says JD: Just because this plan fell through doesn't mean there will never be development on those two blocks, not to mention that there's already plenty of other development on the blocks just north of the stadium.) UPDATE II: Here's the Washington Business Journal story on Miller's lawsuit.
 
258 Posts:
Go to Page: 1 | ... 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 ... 26
Search JDLand Blog Posts by Date or Category