At Monday's ANC 6D meeting, Bryon Johnston of the 11th Street Bridges Project gave a presentation on the rebuilding of the bridges, including an overview of the design and its main features as well as an update on the construction progress. He was nice enough to pass along the slides, which may not mean quite as much without his narration but are still helpful for people who haven't been following along through the process.
A few parts of the new design on the Near Southeast side of the project are worth (re-)pointing out, if you can make it through my torrent of descriptions:
* The "freeway" traffic and the "local" traffic will now be separated, with four lanes inbound and four lanes outbound on the freeway/upriver bridge and two lanes inbound/outbound on the "local"/downriver bridge (which Johnston was referring to as "Local 11th Street" because 11th will now feel like a street that crosses a river), as shown on slide 10.
* The local bridge will allow easier access between Near Southeast and Anacostia, for not only cars but pedestrians and bicycles, as well as streetcars when the routes are expanded. As part of this, 11th Street south of M is going to become two-way, and there will be bike lanes in both directions on 11th north of the bridge. (Slide 9)
* Another feature that appears to be coming together for pedestrians and bicyclists is creating two overlooks that jut out above the river on the south side of the local bridge--these would use two of the in-water piers from the current downriver bridge, and you can see them at left and on slide 11.
* One of the big changes for traffic flow for both Near Southeast and Capitol Hill is that there is going to be a new two-lane on-ramp to go westward on the Southeast Freeway toward Virginia at 11th Street, underneath where the current flyover ramps are. (See slide 7.) Folks who have easier access to 11th Street will no longer have to drive along Virginia Avenue and/or 3rd Street to go westbound on the freeway.
But part of this new 11th Street intersection is that traffic coming from Pennsylvania Avenue along the sunken road that currently feeds directly into the freeway will instead be brought up to street level at this new signalized 11th Street intersection and will then drive straight onto the new on-ramp. So there will be some consternation from drivers using this route. (This is also shown on slide 7.)
* To go across the river from Near Southeast on the freeway bridge, for access to DC-295 northbound and I-295 southbound, drivers will have a new ramp on the southeast corner of 11th and M (slide 4). The existing ramp at 8th and Virginia will still be available, too.
* There will still be an exit ramp from the inbound freeway bridge to I Street, just as there is now (slide 4).
* If you look at slide 4 very closely (and/or click on the bird's-eye view at right) and follow the paths off of each bridge, you can see how the freeway bridges coming across the river will have an exit for M Street similar to the current exit, but it deposits drivers at M just west of 12th instead of using 12th itself. It also no longer has the neat little N Street cut-through directly from the ramp that some Navy Yard workers cherish. To get to the Navy Yard, drivers will turn left on M, then left at 11th, and then go to whichever gate they need.
Other information in the slides includes: a graphic showing of the new ramps and accesses on the east side of the bridges at 295 and MLK (slide 12), of which the biggest addition is that you'll now be able to get to and from 295 and the bridges in all directions. There's also recent construction photos (including the first structural steel being laid on the freeway bridge), and information on stormwater management areas, and upcoming traffic impacts (slide 19).
It's expected that the freeway bridge will open about a year from now, with the new local bridge being finished in the winter of 2012/2013. (Dr. Gridlock wrote about recent milestones and upcoming work a few weeks ago.)
If you want to know more, there's my 11th Street Bridges project page, and you can also spend a couple months reading the Environmental Impact Statement to see all the studying they did of potential, um, impacts. There's also this Fact Sheet that they handed out.
Comments (5)
 
 More About 11th Street Bridges

JDLand.com Home

Comments

Rick says: (11/10/10 7:06 AM)
JD - link to fact sheet is broken.


JD says: (11/10/10 8:24 AM)
Thanks, fixed.


BillP says: (11/10/10 9:16 AM)
SO excited that the prior stupidity of (1) not being able to get on the SE/SW freeway from 295 South and (2) having to use Penn Ave to go from the SE/SW freeway to 295 North is being corrected.

I know JD has mentioned "odd" placement of freeway signs on 395 and the SE/SW freeway as they pertain to near SE. Has anybody heard if they are going to try to "name" or "number" the stretch of the SE/SW freeway after 395 north departs via tunnel and 295, especially now that these freeways will actually be properly connected in all directions?


Froggie says: (11/11/10 8:43 PM)
Bill: officially, the SE Freeway is I-695. Whether DDOT signs it or not after project completion is anybody's guess. Given current precedent, I expect them to sign it as "TO I-295/DC 295" or "TO I-395".


JD says: (11/11/10 8:46 PM)
695 is so Baltimore. :-)

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2015!
 Top News
  
Recent Comments:  
Sally M on Notices of Virginia: Working beautifully for me. Count me in on the cult following…
conngs0 on Notices of Virginia: Works well for me. Thanks for the persistence with the technical issues associa...
JD on Notices of Virginia: We'll see what happens once there's actually some heavy traffic, but at the mome...
nairobs on Notices of Virginia: Works great for me too.



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
   THEFT
Theft 2 (Theft F/Building)
 04/23/15
400 B/O M ST SE   THEFT
2nd Degree
 04/22/15
1000 B/O 3RD ST SE   THEFT
2nd Degree
 04/20/15
1100 B/O NEW JERSEY AVE SE   THEFT
2nd Degree
 04/12/15
1100 B/O NEW JERSEY AVE SE   THEFT
2nd Degree
 04/10/15
100 B/O L ST SE   THEFT
Theft 2 (Theft F/Building)
 04/10/15
100 B/O K ST SE   THEFT F/AUTO
 04/08/15
50 B/O M ST SE   THEFT
2nd Degree
 04/07/15
100 B/O K ST SE   THEFT F/AUTO
Theft From Auto 1
 04/04/15
400 B/O M ST SE   THEFT
Shoplifting
 04/03/15
0 B/O POTOMAC AVE SE   ROBBERY
Robbery/Attempt To Commit Robbery
 03/28/15

Active Public Space Permits Archive  
1401 11TH ST SE    Maryland Transit Administration 
Issued
new  
 12/30/14
to
12/29/15
861 NEW JERSEY AVE SE    CSX Transportation Inc. 
Assigned
paving; excavation  
 01/09/15
to
10/09/15
1100 NEW JERSEY AVE SE    Capitol Riverfront BID 
Issued
streetfixture; new  
 08/19/14
to
08/18/15

Recent Issued Building Permits Archive  
1011 1ST ST SE   
04/20/15 
COLIN CLARK / MICHAEL BIANCO; COLIN CLARK; MITCH PERMUY
E98099105 / SUPPLEMENTAL
1265 1ST ST SE   
04/10/15 
CAPITAL RIVERFRONT HOTEL LLC / JERONE SCOTT
P1504925 / SUPPLEMENTAL
   
04/10/15 
BIT INVESTMENT FIFTY-EIGHT LLC / OTIS ELEVATOR COMPANY
EN1501330 / SHOP DRAWING
TYPE OF ELEVATOR : TWO (2) TRACTION / STEEL / CENTRAL / VERTICAL TRANSPOTATION LICENSE NUMBER : ELC1300386 ISSUE DATE : 08 / 04 / 2014 EXPIRATION DATE 11-30-2015
1277 1ST ST SE   
04/15/15 
BALLPARK RESIDENTIAL LLC / CLARK CONSTRUCTION GROUP LLC
AH1500366 / CONSTRUCTION
ON-SITE PROJECT WORK AND TRUCK DELIVERY HOURS 6:00AM - 7:00PM MONDAY THROUGH SATURDAY FOR THE PROJECT DURATION AND THE FOLLOWING HOLIDAYS: EMANCIPATION DAY 4 / 16 / 15 COLUMBUS DAY 10 / 12 / 15 VETERANS DAY 11 / 11 / 15
1331 4TH ST SE   
04/17/15 
CLARK CONCRETE
AH1500371 / CONSTRUCTION
AFTERHOURS TO POUR CONCRETE ON ROOF FROM 4 / 20 / 2015 TO 5 / 20 / 2015 FROM 7PM TO 7AM
   
04/21/15 
FC 1331 LLC / JAMES G HOLT
E1505081 / SUPPLEMENTAL
1150 5TH ST SE   
04/09/15 
DISTRICT OF COLUMBIA JEFFREY LUKER QUINN EVANS ARCHITECTS / REBECCA RUSCHMA ECS MID-ATLANTIC
SB1500233 / CONSTRUCTION
WE WILL PERFORM A TOTAL OF TWO SOIL BORINGS ON THE PROPOSED SITE AND ONE AUGER PROBE BORING FOR INFILTRATION TESTING. ONE BORING WILL EXTEND TO A DEPTH OF 100 FEET AND THE ANOTHER WILL EXTEND TO A DEPTH OF 15 FEET BELOW EXISTING SITE GRADES AND WILL BE LOCATED WITHIN THE BOUNDS OF THE PRIVATE PROPERTY. WE WILL ALSO DRILL ONE PROBE BORING OFFSET FROM THE 15 FOOT BORING TO A DEPTH OF APPROXIMATELY 1...
   
04/15/15 
DGS DCPS / BRUCE PAIGE INDUSTRIAL SERVICES
B1506192 / CONSTRUCTION
REPLACE EXISTING INOPERABLE GENERAC GENERATOR WITH A NEW 6.7L GENERAC GENERATOR
1015 HALF ST SE   
04/11/15 
HALF ST SE LLC / ANDREW ARNTSON; HALF ST SE LLC; ANDREW ARNTSON
P63100436 / SUPPLEMENTAL
55 M ST SE   
04/14/15 
HINES GLOBAL REIT / JOHN GIUSEPPE-RAMCO
TL1500090 / CONSTRUCTION
FIRST TIME TENANT CONSTRUCTION FOR NEW OFFICE SPACE ON THE 9TH FLOOR FINCANTIERI MARINE GROUP AS SHOWN ON THE ATTACHED THIRD PARTY REVIEWED AND APPROVED MECH. PLUMB. ELECT. FIRE PROTECTION AND ARCH. PLANS BY KTA GROUP. INTERIOR WORK ONLY. NO CHANGE IN USE.
   
04/15/15 
HINES GLOBAL REIT / JOHN GIUSEPPE-RAMCO
TL1500077 / CONSTRUCTION
TENANT LAYOUT TO CONSTRUCTION NEWTHIRD FLOOR OFFICE SPACE FOR GREAT MINDS AS SHOWN ON THE ATTACHED THIRD PARTY REVIEWED AND APPROVED MECH. PLUMB. ELECT. FIRE PROTECTION AND ARCH. DWGS. BY KTA. INTERIOR WORK ONLY NO STRUCTURAL WORK INVOLVED.
   
04/17/15 
HINES GLOBAL REIT 55 M STREET LLC /
P1505068 / SUPPLEMENTAL
80 M ST SE   
04/20/15 
WELLS REIT II 80 M STREET LLC / JOHN GIUSEPPE-RAMCO
B1503697 / CONSTRUCTION
RENOVATIONS TO EXISTING 5TH FLOOR OFFICE SPACE FOR TASC PHASE I AS SHOWN ON THE ATTACHED THIRD PARTY REVIEWED AND APPROVED MECH. PLUMB. ELECT. FIRE PROTECTION DEMOLITION AND ARCH. DWGS. BY KTA. INTERIOR WORK ONLY. NO STRUCTURAL WORK INVOLVED. NO CHANGE IN USE.
50 M ST SE   
04/07/15 
KCG 50 M LLC / FVI2020
B1501877 / CONSTRUCTION
A NEW 11 STORY AND PENTHOUSE LEVEL HOTEL WITH 195 ROOMS INCLUDING 766 SQ-FT FUNCTION ROOM 2ND FLOOR AND 4874 SQ-FT OF GENERAL RETAIL USE ON THE 1ST FLOOR. THE BUILDING WILL HAVE 2 BELOW GRADE PARKING LEVELS TO ACCOMODATE REQUIRED AUTOMOBILE PARKING. LOADING IS ACCOMODATED AT THE 1ST FLOOR.
80 M ST SE   
04/21/15 
WELLS REIT II 80 M STREET LLC / RONNIE E WRIGHT
E1505080 / SUPPLEMENTAL
   
04/21/15 
NOT AVAILABLE NOT AVAILABLE / NEIL NUTWELL; NOT AVAILABLE NOT AVAILABLE; NEIL NUTWELL
P84507258 / SUPPLEMENTAL
   
04/21/15 
UNKNOWN UNKNOWN / PATRICK BARRON; UNKNOWN UNKNOWN; ROBIN MALLEY
E38207212 / SUPPLEMENTAL
300 M ST SE   
04/21/15 
NA NA NA
EHOP1290001 / HOME OCCUPATION
1201 M ST SE   
04/09/15 
COPT / EVAN O'BRIEN/ D MCKEEVER SERVICES
B1505061 / CONSTRUCTION
INTERIOR RENOVATION ONLY TO BATHROOMS ON FLOORS 1-4.
909 NEW JERSEY AVE SE   
04/07/15 
909 NEW JERSEY AVENUE ACQUISITION LLC / SHAW HERGENRATHER
P1504830 / SUPPLEMENTAL
1200 NEW JERSEY AVE SE   
04/08/15 
JBG/FEDERAL CENTER LLC / JOHN MCDONALD
P1504842 / SUPPLEMENTAL
1000 NEW JERSEY AVE SE   
04/07/15 
PHILIP BROWN
PC93167082 / POST CARD
REPLACEMENT OF NOT MORE THAN 1 GAS APPLIANCE ON A RESIDENTIAL COMMERCIAL OR INDUSTRIAL PROJECT.
   
04/13/15 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / BRIAN DENNIS
P1504947 / SUPPLEMENTAL
1500 SOUTH CAPITOL ST SE   
04/06/15 
WASHINGTON NATIONALS STADIUM LLC / JOHN GIUSEPPE-RAMCO
B1503799 / CONSTRUCTION
RENOVATIONS FOR NATIONALS NEW TEAM STORE LOCATED AT THE EAST GARAGE CONCOURSE AND 400 LEVELS AS SHOWN ON THE ATTACHED THIRD PARTY REVIEWED AND APPROVED MECHANICAL PLUMBING ELECTRICAL FIRE PROTECTION DEMOLITION ARCHITECTURAL AND STRUCTURAL DWGS. BY ECS MID-ATLANTIC LLC.
   
04/06/15 
WASHINGTON NATIONALS STADIUM LLC / JOHN GIUSEPPE-RAMCO
B1505076 / CONSTRUCTION
RENOVATIONS TO EXISTING CONCESSION STAND LOCATED ON THE 300 LEVEL OF NATS PARK STAND 310 NATIONALS PIZZA AS SHOWN ON THE ATTACHED THIRD PARTY REVIEWED AND APPROVED MECH. PLUMB. ELECT. FIRE PROTECTION AND ARCH. DWGS. BY ECS MID-ATLANTIC LLC. NO CHANGE IN USE NO STRUCTURAL WORK INVOLVED.
   
04/07/15 
NATIONALS STADUIM / RANDAL COX; NATIONALS STADUIM; RANDAL COX
E37461133 / SUPPLEMENTAL
   
04/08/15 
WASHINGTON NATIONAL STADIUM LIC. / DAVID C. WILLIAMS
E1504771 / SUPPLEMENTAL
   
04/09/15 
JOHN GIUSEPPE / PHIL HAUHN; JOHN GIUSEPPE; PHILIP HAUHN
E19554829 / SUPPLEMENTAL
   
04/15/15 
WASHINGTON NATIONALS STADIUM LLC / JOHN GIUSEPPE-RAMCO
B1506296 / CONSTRUCTION
REVISION TO BLDG. PERMIT B1503799 NEW TEAM STORE AT NATIONALS PARK AS PER THE ATTACHED THIRD PARTY REVIEWED AND APPROVED REVISED MECH. PLUMB. ELECT. FIRE PROTECTION AND ARCH. PLANS BY ECS MID ATLANTIC LLC. ORIGINAL APPROVED PLAN SET ATTACHED ALONG WITH WRITTEN DESCRIPTION OF CHANGES MADE.
   
04/17/15 
WASHINGTON NATIONAL STADIUM LLC / DOMINIC E TOTARO
M1501639 / SUPPLEMENTAL
   
04/17/15 
WASHINGTON NATIONALS STADIUM / STEPHEN J. EXELBERT
P1505092 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
1022 - 1109 M ST SE   03/27/15
$ 5,000,000
WASHINGTON HUMANE SOCIETY
 
9TH ST SE   03/03/15
$ 3,730,000
818 POTOMAC AVENUE SE LLC
 
POTOMAC AV SE   03/03/15
$ 3,730,000
818 POTOMAC AVENUE SE LLC
 
POTOMAC AV SE   03/03/15
$ 3,730,000
818 POTOMAC AVENUE SE LLC
 
POTOMAC AV SE   03/03/15
$ 3,730,000
818 POTOMAC AVENUE SE LLC
 
1103 9TH ST SE   03/03/15
$ 3,730,000
818 POTOMAC AVENUE SE LLC
 
1105 9TH ST SE   03/03/15
$ 3,730,000
818 POTOMAC AVENUE SE LLC
 
816 POTOMAC AVE SE   03/03/15
$ 3,730,000
818 POTOMAC AVENUE SE LLC
 
0819R L ST SE   03/03/15
$ 3,730,000
818 POTOMAC AVENUE SE LLC
 
1201 HALF ST SE   02/19/15
$ 9,000,000
WEST HALF RESIDENTIAL II LLC
 
N ST SE   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
0038 N ST SE   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
0036 N ST SE   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
R N ST SE   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
0030 N ST SE   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
0032 N ST SE   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
N ST SE   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
1275 HALF ST   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
HALF ST   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
M ST   02/19/15
$ 36,000,000
WEST HALF RESIDENTIAL III LLC
 
1ST ST SE   02/10/15
$ 1,913,472
BALLPARK HOTEL LLC
 
1ST ST SE   02/10/15
$ 1,913,472
BALLPARK HOTEL LLC
 
1ST ST SE   02/10/15
$ 1,913,472
BALLPARK HOTEL LLC
 
1ST ST SE   02/10/15
$ 6,600,000
BALLPARK RESIDENTIAL LLC
 
1ST ST SE   02/10/15
$ 6,600,000
BALLPARK RESIDENTIAL LLC
 
1ST ST SE   02/10/15
$ 6,600,000
BALLPARK RESIDENTIAL LLC
 
1ST ST SE   02/10/15
$ 6,600,000
BALLPARK RESIDENTIAL LLC
 