Since January, 2003
 (a random before-and-after moment)
August 6, 2005
October 5, 2014
3rd at Tingey, Looking North (see more)

I've just gotten back from the first of the two town halls on Tommy Wells's Performance Parking plan to address on-street parking near the stadium, and it seemed to go pretty well. (I did not see any pitchforks or vats of boiling oil.) I'm not going to summarize the plan again, so please read the new FAQ on Tommy's web site as well as the bill itself and my post on it back in December to get up to speed. The audience comments were mainly to take issue with portions of the proposal (or to pose questions that indicated they had not digested much of the information Tommy and his staffer Neha Bhatt had just spent 30 minutes presenting), but no one rose to say the entire plan was bad.
As the meeting's scheduled ending time drew near, the topic was finally brought up of how on-street parking will be handled on Opening Day and until Tommy's pilot can be enacted. It appears that DDOT is going to be able to cobble together an initial version of the eventual plan; here are my notes on how they expect it to work, keeping in mind that this was not an official presentation of the plans and that the map displayed was hard to read (so don't take any of my boundaries or descriptions as gospel):
* New multispace meter kiosks will be installed to control and price parking on streets from Second Street, SE, over across South Capitol to Second Street, SW, north of M (I, K, and L streets), including New Jersey Avenue, and on the two frontage streets next to the freeway (I Street and Virginia Avenue). These will be "ballpark-area retail streets" as described in the plan, where on gamedays the meters will allow parking for four hours, but at a rate of $4 or $5 an hour. (There will also be "retail street" multispace meters installed on Pennsylvania Avenue, at Eastern Market, and along Eighth Street, but I'm concentrating here on Near Southeast boundaries.)
* New multispace meters will be installed on M Street SE/SW, First Street SE, and Potomac Avenue south of the ballpark, but no gametime parking will be allowed on those streets. These will allow parking for two hours at all other times.
* On pretty much any other street in Near Southeast I didn't mention above, and on most Southwest streets other than Buzzards Point and at the waterfront, the "residential" profile will be implemented, but because there won't be enough multispace meters yet, these streets will be controlled by signage and by supposedly very aggressive enforcement by DPW (which was met with a fair amount of derisive laughter). On these residential streets, Zone 6 stickered vehicles can park without restriction on either side of the street. However, non-Zone 6 vehicles must only park on one side of the street (marked with signs until the meters arrive), and can only park for two hours. Fines are expected to be raised to perhaps the $50 level for parking longer than two hours, and it's possible that non-Zone 6 vehicles parked on the residential-only side of the street will get towed. Eventually, when the meters arrive, parking will cost some nominal amount on these streets.
The questions that still are being worked on include how parking will be handled for guests of residents, and how church parking will be handled. Apparently some in the city government are wanting to not have any sort of enforcement on Sundays, but that did not go over well with the crowd and Tommy seemed to indicate a preference for extending the parking plan to Sundays and working with the churches on extra guest passes. There was also concern that the plan in its current state does not include Maine Avenue and Water Street, which could be inundated with stadium-goers if the parking there isn't regulated. Also not yet determined is when to extend the residential parking hours to in the evening, since some streets only have parking restrictions now until 6:30 pm--should it be extended to 8 pm, or 10 pm, both of which would thwart stadium-goers from trying to use those spaces?
I'm sure there will be more written about this in the coming days by other media outlets, but at least the first real news of how curbside parking will be handled on Opening Day has seeped out. Wednesday's Town Hall, at Brent Elementary School at 301 North Carolina Ave., SE, will probably focus less on stadium-area parking and more on Pennsylvania Avenue/Eastern Market/Eighth Street.
Maps and specifics will be coming from Tommy's office within a few weeks, after boundaries have been decided on.
There's also continuing concern about how Pope Day will work on April 17, since it's a weekday/workday and most parking lots will be filled with commuters. I have come up with a brilliant solution that I'm attempting to float at all levels of the DC government, so please pass it on: In DC, April 16 is now a city government holiday known as Emancipation Day. My simple solution is to move Emancipation Day one day forward, to April 17, to at least get non-essential city workers off the streets and out of the subway on that day while we're overrun with Benedict fans.
Comments (0)
 
 More About parking
 All posts: parking, Nationals Park

JDLand.com Home

Comments

John says: (1/23/08 10:08 PM)
Dear JD,

First off, let me say thank you for attending the meeting. Although it was something that I thought of doing, I wasn't able to, and I knew that I could find an excellent summary here.

In your post, you stated that "streets from Second Street, SE, over across South Capitol to Second Street, SW, north of M (I, K, and L streets), including New Jersey Avenue . . . will be "ballpark-area retail streets" as described in the plan".

Is this saying that the streets near Capitol Hill Tower and the other nearby residential buildings will not have residential parking? Separately, you've described the residential parking where zoned residents can park for free. If these streets are "ballpark-area retail streets", does the residential zoning not apply?

Any further description you may have would be appreciated. The actual bill itself does not lay out the profiles for the streets, but only says that the street profiles will be worked on.

Once again, thank you for your information and all of your work.

Have a nice night!


JD says: (1/23/08 10:15 PM)
Hi--

The boundaries are still not set in stone. The retail streets I mentioned north of the ballpark from Second Street west seemed to be what Tommy was talking about when he said he wanted to meet with CHT residents about how those streets should be handled. So there might still be something changing on those, and I'd contact Tommy's office or find out who from CHT it was at the meeting tonight who was asking the questions.

I'll also note that tonight's maps were slightly different from last night' and the ballpark-retail boundaries did not cross South Capitol into SW on the new versions. So anyone who has concerns should contact Tommy's office first to make sure that I've characterized things correctly and then to register any concerns you have.

You are correct in your characterizations of retail vs. residential streets in terms of how they impact Zone 6 permit holders.


JD says: (1/23/08 10:28 PM)
(Sorry, some of my response is in reference to what I wrote about the Wednesday meeting--didn't realize you were commenting on the Tuesday meeting post. Read the Wednesday one to see what the heck I'm talking about. :-) )

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Recent Comments:  
Alex B. on Capper 'Flexibility' Gets: <i>A true mixed community with people of different backgrounds, socio-econ...
tspaquin on Capper 'Flexibility' Gets: And it's not the appearance or upkeep of the building that's the greatest concer...
tspaquin on Capper 'Flexibility' Gets: @JHUGrad -- I would give it 15 to 20 years, but of course it will be too late to...
tspaquin on Capper 'Flexibility' Gets: The seniors building, in my view, does get a pass because the housing needs of s...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1000 B/O 5TH ST SE   THEFT F/AUTO
Theft From Auto 1
 02/28/15
400 B/O M ST SE   THEFT
2nd Degree
 02/28/15
100 B/O K ST SE   THEFT F/AUTO
Theft From Auto 1
 02/27/15
1000 B/O 4TH ST SE   THEFT F/AUTO
 02/27/15
100 B/O CANAL ST SE   THEFT
2nd Degree
 02/24/15
1300 B/O 4TH ST SE   THEFT
Theft 1 (Theft F/Building)
 02/19/15
1000 B/O 2ND ST SE   THEFT F/AUTO
 02/18/15
100 B/O K ST SE   THEFT F/AUTO
 02/06/15
UNIT B/O K ST SE   THEFT F/AUTO
 02/01/15

Active Public Space Permits Archive  
No records added or modified in the past two weeks.

Recent Issued Building Permits Archive  
1011 1ST ST SE   
02/12/15 
COLIN CLARK / MICHAEL BIANCO; COLIN CLARK; MITCH PERMUY
E98099105 / SUPPLEMENTAL
1265 1ST ST SE   
02/10/15 
CAPITAL RIVERFRONT HOTEL LLC / JOHN HOMICK
E1502866 / SUPPLEMENTAL
1000 5TH ST SE   
02/24/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / KIM MITCHELL CDKM CONSULTING LLC
B1412422 / CONSTRUCTION
NEW BUILDING PERMIT FOR NEW COMMUNITY CENTER INCLUDING STEEL STRUCTURE BRICK AND MASONRY BACKUP
1240 12TH ST SE   
02/19/15 
WASHINGTON GAS LIGHT CO / CARLTON W ROBINSON
E1503465 / SUPPLEMENTAL
909 HALF ST SE   
02/25/15 
23 I LLC C/O RELATED COMPANIES / DAVID MILLER
SB1500157 / CONSTRUCTION
INSTALLATION AND MONITORING OF 8 INCLINOMETER MONITORING SYSTEMS. THREE INCLINOMETER CASINGS TO BE INSTALLED ALONG THE K STREET BORDER OF THE PROJECT. THREE CASINGS TO BE INSTALLED ALONG THE I STREET BORDER OF THE PROJECT. TWO CASINGS TO BE INSTALLED ALONG THE HALF STREET BORDER OF THE PROJECT.
   
02/23/15 
23 I LLC C/O RELATED COMPANIES / 23 I LLC C/O RELATED COMPANIES; ANDREW DANCE
SB1500132 / CONSTRUCTION
A HOLLOW STEM AUGER WILL INSTALL UP TO 30 TEMPORARY DEWATERING WELLS BY ADVANCING A 12 OD / 8 1 / 4 ID BOREHOLE TO A DEPTH OF 65 FEET. AT DEPTH A 4 INCH PVC FLUSH JOINT THREADED WELL ASSEMBLY WILL BE SET AND SELECT FILTER PLACED. INTO EACH WELL WILL BE INSTALLED A 1 HP TURBINE SUBMERSIBLE PUMP. EFFLUENT WILL BE DIRECTED THROUGH A COMMON MANIFOLD TO A BAFFLED SETTLING TANK AND DISCHARGED TO THE LO...
1015 HALF ST SE   
02/09/15 
HALF ST SE LLC /
P1503333 / SUPPLEMENTAL
   
02/12/15 
THOMAS AN / THOMAS AN; HYH ELECTRIC CO. INC.
SG1500156 / CONSTRUCTION
INSTALL ONE SINGLE FACE BUILDING SIGN AND ONE DOUBLE FACE BLADE SIGN
   
02/10/15 
EVAN OBRIEN / JOSEPH ABRESCH; EVAN OBRIEN; ROBERT HUNSBERGER
E74054014 / SUPPLEMENTAL
   
02/18/15 
HALF ST SE LLC / STEPHEN R. HOLMAN
P1503532 / SUPPLEMENTAL
82 I ST SE   
02/09/15 
GREYSTAR RCP DEVELOPMENT / KIM MITCHELL CDKM CONSULTING LLC
SH1400084 / CONSTRUCTION
SHEETING & SHORING WORK FOR NEW 13-STORY RESIDENTIAL PROJECT AT EYE STREET AND NEW JERSEY AVE SE
50 M ST SE   
02/18/15 
ENGLEWOOD LLC / FVI2020
FD1500010 / CONSTRUCTION
FOUNDATION OF GRADE RELATED TO CONSTRUCTION OF A NEW HOTEL
55 M ST SE   
02/24/15 
HINES GLOBAL REIT 55 M STREET LLC / ANDREW P CARAYIANNIS
M1501184 / SUPPLEMENTAL
100 M ST SE   
02/11/15 
SQUARE 743 INC. / JOHN GIUSEPPE-RAMCO
TL1500062 / CONSTRUCTION
FIRST TIME TENANT TO BUILDOUT AND OCCUPY TENANT SPACE ON PART OF THE 7TH FLOOR THE TRUST FOR PUBLIC LAND AS SHOWN ON THE ATTACHED THIRD PARTY REVIEWED AND APPROVED MECH. .PLUMB. ELECT. FIRE PROTECTION AND ARCHITECTURAL PLANS BY KTA. INTERIOR WORK ONLY. NO CHANGE IN USE. NO STRUCTURAL WORK INVOLVED.
   
02/13/15 
SQUARE 743 INC / RONNIE E WRIGHT
E1503331 / SUPPLEMENTAL
   
02/13/15 
SQUARE 743 INC / DAVID FLEMING
P1503495 / SUPPLEMENTAL
   
02/19/15 
SQUARE 743 INC / DAVID FLEMING
P1503597 / SUPPLEMENTAL
   
02/20/15 
SQUARE 743 INC / GREGORY E LIGON
E1503498 / SUPPLEMENTAL
   
02/23/15 
SQUARE 743 INC / ANTHONY G SAMBURG
E1503518 / SUPPLEMENTAL
901 M ST SE   
02/19/15 
US GOVERNMENT NAVY PWC / SUMMIT CONSTRUCTION AND ES
B1504570 / CONSTRUCTION
REQUEST AND E&S PERMIT FOR WORK ON FEDERAL INSTALLATION. INSTALLING FOOTINGS AND SLAB WITH PORTCH SUPPORTS. MINOR GRADING AND SEEDING. BUILDING FOOTPRINT IS UNDER 700SF. LAND DISTURBANCE INCLUDING GRADING AND SEEDING IS UNDER 2 500SF.
100 M ST SE   
02/19/15 
SQUARE 743 INC / JOHN H THOMSON
E1503464 / SUPPLEMENTAL
   
02/20/15 
SQUARE 743 INC / DAVID RAINE; SQUARE 743 INC; DAVID RAINE
P38575591 / SUPPLEMENTAL
300 M ST SE   
02/11/15 
FEDERAL CENTER LP / SAM HOLLEN RAMCO OF DC INC.
B1504255 / CONSTRUCTION
INTERIOR RENOVATION TO 2ND FLOOR CONFERENCE ROOM. PARTITIONS FINISHES MECHANICAL ELECTRICAL AND LIFE SAFETY. ICI SERVICES
1201 M ST SE   
02/11/15 
CSC / DAMON ELLIS
B1503731 / CONSTRUCTION
SCOPE OF WORK AREA IS 800SQFT TO INCLUDE MECHANICAL PLUMBING ELECTRICAL AND FIRE. NO CHANGE OF USE OR STRUCTURAL WORK BEING DONE
800 NEW JERSEY AVE SE   
02/24/15 
NEW JERSEY AT H LLC / JOHN H THOMSON
E1503556 / SUPPLEMENTAL
   
02/13/15 
BAKER DC / CHRISTINE LONG
AH1500246 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 7:00PM THRU 7:00AM
1000 NEW JERSEY AVE SE   
02/23/15 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / SHAWN ALEX HELLER
HO1500118 / HOME OCCUPATION
HOME OFFICE (LAW OFFICE).
300 TINGEY ST SE   
02/13/15 
RICHARD CERVERA / NATHANIEL GILL
B1504014 / CONSTRUCTION
NEW SUMMER GARDEN
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




     © Copyright 2015 JD.