Since January, 2003

Ad by Google
 (a random before-and-after moment)
August 8, 2005
October 27, 2013
Van at M, Looking North (see more)

Tonight the Zoning Commission is having a public hearing on case 06-25, a text amendment to the Capitol Gateway Overlay that would include the west side of South Capitol Street in the CG Overlay and also establish a ZC review and approval process for new developments that abut South Capitol (as is currently the case for new projects along M Street). The Capitol Gateway Overlay spells out in extreme detail exactly what the requirements are for developments along South Capitol, M, and in the Ballpark District and over to Buzzards Point, and I suggest that anyone who is interested (or concerned) about the type of development that may be coming to Near Southeast should pour themselves 9 or 10 cups of coffee and read this document. (It's not a complete version because one doesn't currently seem to exist, I cobbled this together from various ZC documents.) The preamble is worth highlighting, to see how the city has spelled out what it envisions for the area:
The purposes of the CG Overlay District are to:
(a) Assure development of the area with a mixture of residential and commercial uses, and a suitable height, bulk and design of buildings, as generally indicated in the Comprehensive Plan and recommended by planning studies of the area;
(b) Encourage a variety of support and visitor-related uses, such as retail, service, entertainment, cultural and hotel or inn uses;
(c) Allow for continuation of existing industrial uses, which are important economic assets to the city, during the extended period projected for redevelopment;
(d) Provide for a reduced height and bulk of buildings along the Anacostia riverfront in the interest of ensuring views over and around waterfront buildings, and provide for continuous public open space along the waterfront with frequent public access points; and
(e) Require suitable ground-level retail and service uses and adequate sidewalk width along M Street, S.E., near the Navy Yard Metrorail station.
From there, you are treated to pages and pages and pages of very specific requirements set out for developers (i.e., items like "Each new building shall devote not less than thirty-five percent (35%) of the gross floor area of the ground floor to retail, service, entertainment, or arts uses ("preferred uses") [...]; provided, that the following uses shall not be permitted: automobile, laundry, drive-through accessory to any use, gasoline service stations, and office uses (other than those accessory to the administration, maintenance, or leasing of the building). Such preferred uses shall occupy 100% of the building's street frontage along M Street, except for space devoted to building entrances or required to be devoted to fire control.")
There is also a separate Southeast Federal Center Overlay, again laying out much detail about what is required and allowed for that development. There's even a great map on the last page that clearly shows the allowed uses, with the 5.4-acre waterfront park and residential-zoned areas being closest to the water (so there's no plan in place to allow office buildings right on the water or even near it; the commercial zones of the SEFC are all along First Street and M Street).
I think even just casual browsing through these documents can be a bit of an eye-opener for people (like me) who don't realize exactly how many requirements are already in place for these two areas. Of course, developers can ask for relief from certain rules (or the city council can just override the ZC altogether), but having documents such as these are a solid foundation. So it's good to know what's in them.
UPDATE: (like you're still reading) The Case 06-25 CG Overlay text amendment hearing was over last night in a flash; the record is being held open until Nov. 30, with action most likely to be taken at the ZC's Dec. 11 meeting.
 
 More About staddis

JDLand.com Home

Comments

Sorry, comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Recent Comments:  
JD on The Big Stick: Mr. JDLand and I did go--I had the polish sausage and he had the half smoke, and...
JES on The Big Stick: JD, I saw some menu pics on twitter. Did you go? How was it?
Westnorth on Navy Yard Circulator: People generally don't ride bus routes from one end to the other end. In the cas...
E. Masquinongy on Southeast Blvd.: All three plans show the rehabilitation of Barney Circle, reconnecting it to L S...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
200 B/O I ST SE   THEFT F/AUTO
 12/18/14
700 B/O L ST SE   THEFT
2nd Degree
 12/17/14
1200 B/O 1ST ST SE   THEFT
Theft F/Building
 12/08/14
1200 B/O 1ST ST SE   THEFT
 11/21/14
900 B/O 5TH ST SE   BURGLARY
 11/21/14
200 B/O I ST SE   THEFT
 11/21/14
1200 B/O NEW JERSEY AVE SE   THEFT
 11/20/14

Active Public Space Permits Archive  
1331 2ND ST SE    Carlton Ray 
Assigned
paving; streetfixture; excavation  
 02/10/14
to
02/09/15
1331 4TH ST SE    Forest City Forest City 
Issued
excavation; new  
 01/10/14
to
02/10/15

Recent Issued Building Permits Archive  
1025 1ST ST SE   
12/03/14 
NA NA NA
EHOP1590134 / HOME OCCUPATION
   
12/10/14 
KAREN NZAKIMUENA
PC74349112 / POST CARD
INSTALLATION OF NOT MORE THAN 1 NEW AIR CONDITIONING UNIT UP TO A MAXIMUM OF 10-TONS OF EQUIVALENT REFRIGERATING EFFECT.
1016 3RD ST SE   
12/15/14 
ANAMARIA R MOTTOLA / DIXON
B1502438 / CONSTRUCTION
RENOVATIONS MINOR MEP
1212 4TH ST SE   
12/10/14 
FC 1212 LLC / SCHINDLER ELEVATOR CORP
ER1500593 / SHOP DRAWING
REPLACE MAXTON UC2A VALVE EST. COST OF WORK $ 2 2120. 00
927 5TH ST SE   
12/15/14 
AARON LORENZO
PC25919394 / POST CARD
REPLACEMENT IN KIND OF EXISTING FENCE ON PRIVATE PROPERTY. REPLACEMENT IN KIND WHEN APPLIED TO ARCHITECTURAL FEATURES MEANS REPLACEMENT WITH A FEATURE OF LIKE MATERIAL THAT REPLICATES THE EXISTING FEATURE IN PROPORTION APPEARANCE TEXTURE DESIGN DETAIL AND DIMENSIONS.
1000 5TH ST SE   
12/04/14 
UNITED STATES OF AMERICA / WALTER T JONES
E1501598 / SUPPLEMENTAL
1015 HALF ST SE   
12/10/14 
HALF STREET LLC / ART DISPLAY; BOB BIROONAK ART DISPLAY CO.
SG1400465 / CONSTRUCTION
ONE ILLUMINATED NEWS TICKER SIGN
1201 HALF ST SE   
12/10/14 
WEST HALF 1 LLC / MARK W GIBSON
E1501746 / SUPPLEMENTAL
   
12/12/14 
JASON YORK
TN1500036 / CONSTRUCTION
INSTALLING SMALL TENT ON DEC 29 2014 FOR THE BRIDGESTONE WINTER CLASSIC ON 1-1-15 WITH GENERATOR TENTS REMOVED ON 1-2-15
808 L ST SE   
12/10/14 
NAVY YARD ASSOCIATES LLC / KE-MAURELLE PREDDIE
B1412006 / CONSTRUCTION
NEW OFFICE USE FOR 1254 SQ. FT. EXISTING TWO STORIES PLUS BASEMENT STRUCTURE ON SE / C-3-A ZONING DISTRICT. MECHANICAL ELECTRICAL AND PLUMBING REMAIN AS IS.
80 M ST SE   
12/10/14 
WELLS REIT II 80 M STREET LLC / ANTHONY G SAMBURG
E1501724 / SUPPLEMENTAL
14 M ST SE   
12/16/14 
ROMAN CATHOLIC ARCHBISHOP OF WASHINGTON / PHILLIP B. MOBLEY
FB1500047 / SUPPLEMENTAL
20 M ST SE   
12/04/14 
TRANSWESTERN JEFFREY GROSS / OLLIE READ; TRANSWESTERN JEFFREY GROSS; CHRISTOPHER SCHULZE
AR66514546 / SUPPLEMENTAL
   
12/04/14 
TRANSWESTERN JEFFERY W GROSS / ANDREW ARNTSON; TRANSWESTERN JEFFERY W GROSS; ANDREW ARNTSON
P96600069 / SUPPLEMENTAL
80 M ST SE   
12/03/14 
MARY JACKSON
PC44081129 / POST CARD
REPLACEMENT OF NOT MORE THAN 1 GAS APPLIANCE ON A RESIDENTIAL COMMERCIAL OR INDUSTRIAL PROJECT.
   
12/05/14 
WELLS REIT II 80 M STREET LLC /
P1501746 / SUPPLEMENTAL
100 M ST SE   
12/03/14 
SQUARE 743 INC. / SAM HOLLEN RAMCO OF DC INC.
B1502037 / CONSTRUCTION
INTERIOR RENOVATION TO 4TH FLOOR OFFICE SPACE. SUBDIVIDE TENANT SPACE AND ADD PANTRY. PARTITIONS MEP AND LIFE SAFETY. NORTHWOOD INVESTORS LLC
202 M ST SE   
12/10/14 
DISTRICT OF COLUMBIA / WOODY WICKLIFFE
TN1500035 / CONSTRUCTION
INSTALL 50FT X 100FT TENT NO GENERATORS NO COOKING NO SMOKING NO STAGES 10FT X 70FT TENT INSTALLED DEC 11-15 2014 EVENTS DEC 12-14 2014 12:01PM - 9:00 PM
1201 M ST SE   
12/11/14 
CARLTON RAY
AH1500149 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
75 N ST SE   
12/11/14 
CRANE SERVICE CO / CHRISTINE LONG
AH1500150 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 2:00AM THRU 11:00PM
800 NEW JERSEY AVE SE   
12/08/14 
SQUARE 737 LLC / GLENNWOOD ROGERS
P1501673 / SUPPLEMENTAL
25 POTOMAC AVE SE   
12/02/14 
RIVERFRONT HOLDINGS I LLC C/O ECC INC. / ECC INC.
UT1500007 / CONSTRUCTION
REMOVAL OF ONE 100-GALLON UNDERGROUND STORAGE TANK DURING MASS EXCAVATION ACTIVITIES FOR SITE REDEVELOPMENT.
   
12/03/14 
RIVERFRONT HOLDINGS I LLC / WOODY WICKLIFFE
TN1500032 / CONSTRUCTION
INSTALL 40FT X 80FT TENT NO COOKING NO SMOKING NO PROPANE NO LIGHTING 40FT X 40FT TENT 2 GENERATORS 25KW EACH 20FT X 20FT TENT 8FT X 20FT PLATFORM 40FT X 40FT PLATFORM 20FT X 20FT PLATFORM INSTALLED DEC 8 -9 2014 EVENT DEC 9 2014 9AM - 4PM
   
12/05/14 
FLORIDA ROCK PROPERTIES INC / ROBERT S. WATTS
E1501658 / SUPPLEMENTAL
   
12/05/14 
RIVERFRONT INVESTMENT PARTNERS / JASON BENTLEY
B1408697 / CONSTRUCTION
CONSTRUCTION OF NEW 9 STORY BUILDING. THIRD PARTY REVIEW
1500 SOUTH CAPITOL ST SE   
12/18/14 
NATIONALS PARK / MARK W GIBSON
E1501975 / SUPPLEMENTAL
300 TINGEY ST SE   
12/15/14 
FC BOILERMAKER LLC / GREGORY BIRCKHEAD; FC BOILERMAKER LLC; MICHAEL BELL
E55526822 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




Blog/Home
Project Directory
Photo Archive
Event Photos
 
Nats Park
Food Map
What's New
History

 
Demolished Buildings
Historic Photos
Satellite Images
Timeline
 
About JDLand
Message JD
Advertise
Photo Use
 
     © Copyright 2014 JD.