An overhead view rom above 11th Street of the sunken Southeast Freeway lanes. The right lane seen here has already been closed, and by early 2013 all traffic in both directions will be closed to begin work on the
at-grade Southeast Blvd.. The filling in will begin in the distance where you see the grass shoulder, running to 11th Street, seen below in its current bridge format but which will be replaced with an at-grade street, and then onto 13th Street. There will also be a new flyover ramp from the Southeast Freeway to outbound I-695, replacing the flyover seen at top.
Return to Full Gallery