Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Bower Condos/Guild Apts/Yards
See JDLand's Bower Condos/Guild Apts/Yards Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


35 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4

The siren song of a stunningly clear and breezy Saturday in August was of course irresistible to me, and I walked more than nine miles over four hours to grab a whole lot of pictures from a whole lot of locations. Here's some highlights. Click to enlarge, as always.
It turns out having a public roof space at a central location in the neighborhood is going to be veeeeery handy for me, as it allowed me to grab a great shot of the DC Water Headquarters construction that shows exactly how the new steel is wrapping around the existing O Street Pumping Station. It also allowed me to check on the progress of the excavations at 1250 Half, West Half, and the One M/10 Van combo project in a single shot.
Then there's the Any Minute Now retail offerings, with the Juice Laundry telling Instagram followers that they really are coming soon (really!), and representatives of the new Taylor Gourmet on 1st Street telling nearby office tenants that they expect to open on Aug. 23. We shall see!
Meanwhile, exterior work seems to be starting to wrap up at the 1221 Van residential building just north of the ballpark (and note all that retail space on the first two floors), while the 99 M office building is celebrating its topping out later this month. And while the neighborhood waits with baited breath to see exactly when the Whole Foods build-out will begin at Agora, there are now nice new sidewalks on the stretch of H Street SE that is in the process of materializing.
Finally, there are holes in the ground that now show evidence of the start of vertical construction, so these might be my final downward peeks into the two residential projects at the Yards Parcel O on 4th Street, the large residential project at 2 I Street, and the mixed-income Capper Hope VI apartment building at 3rd and L.
And, finally, while I have no intention of adding the new DC United soccer stadium to my lineup, I was surprised to see how visible it is from just within the JDLand boundaries at South Capitol and Potomac. So, here.
But this is just a very small sample. If you want to see a whole lot more of the shots I took, here's 333 of them. Or follow any of the above links, or click on the projects on the map at the upper right of any JDLand page to see the latest for those projects under construction.
 

Sunday morning brought a confluence of a clear calendar, clear skies, and a sort-of-unexpected desire to "get back to work," such as it is, so I took a long walk to get the JDLand camera caught up with the goings-on in the neighborhood. Here's the rundown:
* UPWARD: The biggest news (for me, anyway) is that at last the 99 M office building project has peeked up above ground-level. Also worth getting excited about is seeing the structural steel going up for the new DC Water headquarters along the banks of the Anacostia.
* DOWNWARD: There's digging underway (or about to be) in multiple locations, and the camera peeked past the fences to check out the holes. In order, may I present the current state of: the former McDonald's site at 2 I Street (where a 380-unit apartment building will rise), the Yards Parcel O site at 4th and Tingey (where a joint condo/apartment project has been slooowly underway thanks to the need to dig very carefully when it's an old munitions site), the mixed-income Capper apartment building at 3rd and L, and the JBG West Half residential project directly north of Nats Park.
(I missed the hole at South Capitol and M where the new NAB headquarters and the 10 Van residential building will rise, but it probably doesn't look all that much different from this.)
Then there's the Half Street Hole, where work does appear to be underway, but since excavation was done in 2007, it's kind of hard to tell what's new (I should have gone up to the Hampton Inn roof). Finally, there's the lot at Half and L where fences recently went up around the site that will be Phase II of the Parc Riverside apartment building, but while some dirt has been turned, heavy equipment isn't quite yet on site.
So, if you are counting, that is eight additional projects that will rise out of the ground in the coming year or so, along with the four others that are already above ground but not done.
* OUTWARD: Vertical construction has been finished for a while at the residential building 1221 Van just north of the ballpark, but exterior work has progressed since I last wandered by. And ditto for the District Winery building at 4th and Water.
* ONWARD: Some additional catching up.
And there are going to be lots of other "for the historical record" photos that have been needed to be taken for some months added to various project pages in coming days. Just click around from the main map--you'll never know what you might find.
Coming Soon, a Coming Soon post.
 

These days I'm generally the last person laying eyes on something new in the neighborhood, but I still find it necessary to conduct photo documentation when the calendar and forecast align. Which they did on Sunday.
Let's look at signs and entrances, starting first at F1rst and its Residence Inn, where it looks like the homestretch has been entered (click to enlarge, of course):
Then, let's go over to 4th Street, where the District Winery building continues to zip along. It's also where the Bower is now signed, as is Conte's space in Arris:
Then we'll double back westward (you're getting a sense for how far I walk on these excursions), taking a look at the new sidewalk on New Jersey Avenue in front of Insignia on M. Shake Shack's signage at the Homewood Suites, and the One Hill South entrance (very New York, isn't it). (I caught the Bethesda Bagels signage back in December, just in case you think I'm missing it.)
I even caught the view from the bridge of the new Bardo beer garden at Florida Rock, with a few hardy souls in attendance. Plus, views of both Agora on New Jersey Avenue (aka the Whole Foods Building) and 1221 Van (aka That Big Building On South Capitol Immediately North of the Ballpark):
All the links above to project pages have additional brand spanking new pics, and of course Before photos.
Next up, checking out holes in the ground, both current and coming soon.
 

The blistering pace of new projects slowed a bit this year, allowing me some (needed) breathing space in terms of keeping up with construction progress. But I wandered around on Saturday, and here's a few things of note I saw:
* The JBG apartment project now known as 1221 Van is speeding along, and has changed the skyline along South Capitol considerably. Taking southward-facing photos in the winter months is always dicey, but I couldn't pass up a shot of the new structure and its neighbor directly to the south.
* Insignia on M's logo at the top of its New Jersey Avenue face does easily catch one's eye.
* The preparation work to transform the O Street Pumping Station into the glimmery new DC Water Headquarters is now underway.
* CSX announced this week that the new second-track Virginia Avenue Tunnel is "nearing completion," and it certainly looks that way at the western mouth of both new and old tunnels. And I got to see a train coming out, too! (But the project isn't over--next work will shift to reconstructing the 100-year-old original tunnel.)
* The excavation for the combination condo-and-rental buildings project known as "Parcel O" at the Yards has proceeded apace.
* Conversely, the hole for the 99 M office building has remained basically unchanged since late summer. (Compare the below photo to this one taken in August.) There was a new crane-related after-hours permit approved for the site last week, so maybe things are about to start moving again. UPDATE, 12/13: A representative for the 99 M project has gotten in touch with me to say that there has actually been considerable "complex" work going on at the site, it's just that it's mostly underground/out of sight.
 

At 4th and Water Streets, SE, the steel has started popping up for District Winery, the winery/restaurant/events space coming in late 2017 to the Yards.
The official web site is online, along with Facebook, Twitter, and Instagram accounts, though right now the site's links are mainly for how to reserve the events space for your wedding or how to work for the winery.
Here's a few more images, along with recognition that I need to get my act together and create a project page, though in the meantime you can read my previous posts for more info.
Just to the winery's northeast, digging is well underway at Parcel O, where a joint project is underway that will beget a 138-unit condo building by PN Hoffman and a 190-unit rental building by Forest City. There are hints that the condo building will be called The Bower, though PN Hoffman's web site hasn't quite gotten there yet. Completion is expected in 2018.
Comments (9)
More posts: Development News, Restaurants/Nightlife, winery, The Yards, Bower Condos/Guild Apts/Yards, Yards Park
 

"Time to back up the U-Haul, honey--we're heading to New Jersey Avenue!"
The nice folks breaking down the inside of the tent told me that they expect to open in their new digs in a couple of weeks.
The move is underway to clear what's known as Parcel O at the Yards for two residential projects expected to get underway this year, a 138-unit condo building by PN Hoffman and a 190-unit rental project by Forest City.
Comments (1)
More posts: trapezeschool, Bower Condos/Guild Apts/Yards
 

Last week developer PN Hoffman announced the completion of a $20 million financing deal that will allow its 138-unit condo project at 4th and Tingey in the Yards to break ground in the first quarter of 2016.
The building, seen on the left side of this rendering, will have about 12,000 square feet of ground-floor retail as well as below-grade parking, and is expected to be finished in 2018. It was designed by Handel Architects and WDG, and it's not hard to see brick-and-glass echoes of Arris, its cousin across 4th Street.
The financing was provided by Grosvenor Americas' Structured Development Financing program, for those of you keeping score at home.
According to the sign erected a few weeks back, sales are supposed to start this spring.
And at the same time Hoffman's condo project is being built, Forest City will be building its own rental building immediately to the south, with 190 units in two towers (as seen on the right side of the rendering and in other renderings on the project page).
This is the site where the trapeze school has been camped for the past few years, and it's why they are moving to their new digs at New Jersey and Tingey Any Minute Now.
Hoffman's building (technically known at this point at as Parcel O-1) will be the first condo project in the Yards, and will also be the first condo project to get underway in the neighborhood since Velocity started its construction in 2007--and looks to be on the vanguard of a mini-wave of condo offerings, as both developments at Half and N just north of Nats Park are slated to have condos, along with perhaps a future project at Half and L and one on Square 767 on the old Capper footprint.
Comments (25)
More posts: Development News, The Yards, Bower Condos/Guild Apts/Yards
 

For those who missed out on my interim Facebook blogging on Monday....
The designs for two new buildings coming to the current Trapeze School site at the Yards (known in the parlance as Parcel O) are going before the National Capital Planning Commission in April for an early "35% design review."
One is the 140ish-unit condo building being planned by PN Hoffman. It will front Tingey Street between 4th and a newly (re-)built 5th Street. Its design echoes the brick+glass look that Arris will have when it is completed. It will be the first condo project within the Yards.
Immediately to its south will be a two-towered 190ish-unit rental building to be developed by Forest City. There will be 16,700 square feet of ground-floor retail across both buildings, along with 246 below-grade parking spaces, and in addition to the return of 5th Street there will also be a one-block extension of Water Street along the block's southern side.
Both developers are looking to begin construction late this year or early next year.
In honor of now having renderings, I created a Parcel O project page--and while putting it together, I found the photo at right, showing the corner of 5th and Tingey from May, 2004, back when there was a 5th Street (such as it was). This view matches the rendering at far right in the row of three.
As for the Trapeze School, it will be moving later this year to the southeastern portion of Spooky Park, at the corner of New Jersey and Tingey.
Comments (7)
More posts: Development News, The Yards, Bower Condos/Guild Apts/Yards
 

Word is filtering my way that 100 Montaditos should at last be bringing its menu of Spanish sandwiches and other items to the Boilermaker Shops at the Yards, perhaps even as early as this Thursday, Dec. 4
Mr. JDLand has been keeping close tabs on the progress of this latest offering, and provided this photo of the sandwich board (literally!) out front of the space last week.
That Montaditos is close to opening is also referenced in an end-of-year press release from Forest City that details the rather blockbuster year they've had at the Yards, with the openings of Twelve12, Teeter, VIDA, Sweetgreen, TaKorean, Ice Cream Jubilee, Unleashed, Willie's.....
The release also says that Banfield Pet Hospital is expected to open in the first quarter of 2015 in Twelve12's last retail space on Tingey Street, and that the Navy Yard Oyster Company and Due South restaurants are both expected to open in the Lumber Shed in the spring. Also coming in the spring should be the landscaping of the no-longer-Spooky Parcel A lot, with both a temporary park and parking lot. (No mention of the Trapeze School move, though.)
On the residential side of things, "late 2015" is given both as the completion date for the 327-unit Arris building next to the Foundry Lofts and also the planned start of the 135-unit PN Hoffman condo building at the southeast corner of 4th and Tingey.
If you see action at Montaditos, let me know. And let @TheSlot know, too.
 

A move like this was previewed a few months ago, and now it's come to pass: it's being announced this morning that Forest City is selling the "Parcel O" site on the southeast corner of the 4th and Tingey at the Yards to PN Hoffman, who will be building a 130-unit/10 floor condo building.
The trapeze school is currently occupying the site, but they will be moving to the corner of New Jersey and Tingey once the NGA building demolition is completed.
This would be not only the first condo building at the Yards, but the first condo building in the neighborhood since Velocity was finished back in 2009. Judging by my inbox over the years, the demand for ownership opportunities in the neighborhood is strong.
The press release about the project gives some small amount of detail: "These luxury condominium residences will echo the unique industrial past of the site both in building architecture and unit finishes. A range of residence sizes are currently planned from studios to two-bedroom units. A rooftop resident’s lounge, outdoor kitchen and fire pits, private terraces and balconies, and front desk staff are just a few of the features."
Hoffman is a busy company these days, since they are the behind the massive Wharf development in Southwest. The company has been tied to the Yards before, having been attached way back when to the renovation of Building 202 (the big red brick building now just behind Twelve12), but that project seems to be in perpetual turnaround.
There won't be shovels in the ground next week--scuttlebutt says that Hoffman could start the project in late 2015 (about the time that the under-construction 327-unit apartment building across the street delivers), but there's nothing stated officially one way or the other.
This would be the fourth residential building at the Yards, following the 170-unit Foundry Lofts, the about-to-be-completed 218-unit Twelve12, and the aforementioned 327-unit building on Parcel N, which needs a name desperately.
Comments (6)
More posts: Development News, The Yards, Bower Condos/Guild Apts/Yards
 
35 Posts:
Go to Page: 1 | 2 | 3 | 4