Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Florida Rock
See JDLand's Florida Rock Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


142 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 15
Search JDLand Blog Posts by Date or Category

The first news of a retail tenant at Dock 79 arrives today, with the news that "The Salt Line," a seafood restaurant from the group behind Sixth Engine, Town Hall, and the Dubliner, will open in the Spring of 2017.
Featuring a "New England-inspired menu in a casual and relaxed 3,500-square-foot space with ample outdoor dining and an outdoor riverfront bar," the menu from Chef Kyle Bailey will have seafood and a raw bar at its heart, with "a selection of straightforward New England classics, along with Bailey's own intepretations on the regional fare, and a few Chesapeake Bay-influenced specials."
The restaurant will also have a lineup of regional craft beers and a "creative cocktail program."
The Salt Line will join Whaley's, coming this spring, up river at the Lumber Shed, as seafood restaurants along the west bank of the Anacostia River. The name "Salt Line" apparently "pays homage to the delicate nature of DC's waterways, referring to the point in an estuary in which the water salinity transitions from salt to fresh water."
Dock 79 will have 305 rental units, and is expected to be finished later this year. It's on the site known in these parts as "Florida Rock," the old concrete plant footprint on the river just south of Nationals Park. It has 19,000 square feet of ground-floor retail space overall, facing both the Anacostia and the new plaza that is being built between it and Diamond Teague Park.
Comments (11)
More posts: Florida Rock, Restaurants/Nightlife, saltline
 

Word has arrived today (h/t Barred in DC) that the city's Alcohol Beverage Control Board has denied the application for a liquor license submitted by Bardo for its proposed outdoor beer garden and "neighborhood-oriented park" on the west end of the Florida Rock site, just across Potomac Avenue from Nats Park.
This was Bardo's second attempt at a license for this site (having withdrawn the original application before a ruling was made), and a previous similar notion for the site was denied a liquor license for similar reasons back in 2013.
You can read the entire ruling here, but the gist of it is on page 2:
"While Bardo has presented a modified Application, the Board is not convinced that this new business plan alleviates the problems previously identified at this site. Specifically, the Board is still not convinced that an open air tavern has the capability to prevent unreasonable noise disturbances; that the neighborhood has a sufficient amount of parking; that Bardo can coexist or be included in the neighborhood's official traffic plan; that encouraging stadium attendees to cross Potomac Avenue, S.E., is safe; and that Bardo can exist without delaying or interfering with people and vehicles attempting to the leave Nationals Park after games or other events. Consequently, Board finds itself compelled to once again deny an application at this location."
Bardo optimistically started construction on the site more than a month ago, plus started advertising for staff, and was telling outlets that it "might start serving customers as early as April." As recently as this morning Bardo tweeted a photo of the "freshly milled wood going into the construction of our riverfront brewgarden."
However, this afternoon, there was this tweet:
In the meantime, construction continues on the Dock 79 apartment building just to the east of the Bardo footprint, with leasing about to start and move-ins coming later in 2016.
Is the writing now perhaps on the wall/bulkhead for the notion of an outdoor drinking/congregation establishment on this site?
PS: It's probably worth emphasizing for people wandering through who don't read this stuff religiously that this is not the Fairgrounds site north of the ballpark.
UPDATE: The full transcript of the Feb. 10, 2016 hearing may be illuminating, as might be the first Bardo hearing in April of 2015, and perhaps the ruling rejecting the pre-Bardo venture back in 2013.
 

How's that Metro Shutdown Day working for you? At least it was a beautiful morning for a walk/ride/telecommute to your sofa, for those lucky enough to have those options.
Here's a few things, some of which could be their own posts, but, well, my walk wore me out.
MOVIE THEATER EXTENSION: On Monday night the Zoning Commission granted Forest City's request for a two-year extension to the PUD governing the plans for the Showplace Icon movie theater on the current DC Water site, which has continued to see delays because of DC Water's issues with moving some of its operations off of the site as planned. And, probably in response to a WBJ story a few days ago headlined "Big trouble for proposed multiplex at The Yards? Site 'may be in limbo for many years'," Forest City issued a press release quoting its president, Deborah Ratner Salzberg, as saying that "We look forward to beginning construction on the Showplace Icon Theater at The Yards by the end of this year," and that "DC Water, the District and Forest City meet weekly on this project to ensure that this first-ever theater complex for Southeast DC opens on time." There is also a quote from the CEO of Kerasotes Showplace Theaters, Tony Kerasotes, saying that "We realize this is a complicated site and remain fully engaged in seeing it through and moving forward with construction."
HISTORIC DESIGNATION: The little Lincoln Playground Field House at 555 L Street SE, now nestled between Van Ness Elementary School and the Bixby, has been designated a DC historic landmark. It was built in 1934, and you can read more about its significance here. As for getting it rehabilitated, ANC commissioner Meredith Fascett says there will be a community meeting upcoming on both the field house and a redesign of the adjacent Joy Evans Park.
POLLING PLACE MOVE: The DC Board of Elections has announced that the polling place for Near Southeast's Precinct 131 will be moving from Van Ness Elementary School to the gym at the new Capper Community Center one block to the north, starting with the June 14 primary. However, DCBOEE might want to double-check the address they are using for the community center, since in the past it's always been 1000 5th St., SE, and "1005" would be one of the townhouses across the street.
DOCK 79 LEASING: Pre-leasing of the apartment building on the Florida Rock site just south of Nats Park starts on April 7, the day of the Nats home opener.
BIG STICK HOURS: The beer and brats place at Half and M SE has applied for a "substantial change" to its liquor license, looking to extend its allowed beverage sales/service/consumption hours to 1 am Sunday-Thursday and 2 am Friday and Saturday.
Comments (2)
More posts: the Big Stick, Florida Rock, lincoln, The Yards at DC Water
 

This is mainly an excuse for me to post photos I got by schlepping up onto the Douglass Bridge on Sunday, but it's worth noting that it was announced last week that vertical construction is now finished on Dock 79, the 305-unit residential building that is the first phase of the never-thought-it-would-finally-happen redevelopment of the Florida Rock site along the Anacostia River. And so let's take a moment to look back to what the site looked like in 2005, and what it looks like now:
One other item of note at the site--as seen below, beams have been placed connecting a portion of the main concrete walkway at Diamond Teague Park to what will be Dock 79's plaza and Anacostia Riverwalk footprint, and without realizing it I did a pretty good job of matching my photo of the beams to the rendering of the same location:
There will be over 15,000 square feet of retail in the building, and in a press release from developer MRP Realty last week, John Begert is quoted as saying the retail space is being "programmed" with "a dynamic mix of local authentic restaurant operators," though no retail tenants have been announced as yet.
Most of this retail space will be facing the "esplanade" and this plaza, which MRP's press release says is "inspired by the concept of the “ecotone,” an ecological term referring to the transitional zone between two ecosystems."
The plaza also is directly south of the "grand staircase" of Nationals Park, ensuring that (some) views of the river from those steps and the viewing platform on the upper concourse are not completely lost.
The building is expected to deliver in the summer of 2016, and will have a ground-floor club/game room, a health club, a rooftop swimming pool, WiFi, air-conditioned storage, bike storage, a business lounge, and a 24-hour front desk.
The subsequent phases of the six-acre project are currently envisioned as a second residential building with 282 units and 5,600 square feet of retail, followed by a 313,000-square-foot office building with 11,500 square feet of retail, and then a fourth building that could be a hotel or another residential or office building, with 260,000 square feet of space and 12,600 square feet of ground-floor retail. (The footprint of the final two phases is, however, right up against the western end of the existing Douglass Bridge, so it might be awhile before those come to pass.)
See my Dock 79/Florida Rock page for lots more photos and renderings.
Comments (3)
More posts: dock79, Florida Rock, riverwalk
 

* BARDO RIVERFRONT, AGAIN: Last week a new "placard" was posted for an alcoholic beverage license application for Bardo Riverfront, the proposed combination outdoor brew pub and family-friendly riverfront park at Florida Rock.
This is Bardo's second attempt at the ABC process for this site (the first placard having been rescinded just a few weeks after a filing in August), and is now technically the fourth time that the notion of a large outdoor activity/party/drinking/whatever space has been attempted at this spot across from Nats Park.
This application is for a Retailer's Class D Tavern license (as opposed to a Class C Tavern license last time), and is described thusly: "Outdoor Beer Garden. Beer made on premise. Food Trucks to supply food. Total number of Summer Garden seats: 700. Total Occupancy Load: 750. Brew Pub Endorsement."
As to why Bardo's application earlier in 2015 never made it all the way through after being announced back in March, one might want to read this transcript from the April hearing at the Alcoholic Beverage Control Board to see the many (many) concerns raised by the board and by MPD, which clearly is not supportive of any venture of this type in this location. (And I can't not highlight the comments from Commander Jeff Brown of MPD about how the "applicant here says it's going to be cornhole bean-bag toss, which I'm not even going to pretend to know what that is, but I think I'll be safe to say that it's not very popular.")
* DOCK 79 FLOOR PLANS: While the potential Bardo Riverfront footprint is on the western, later-phase portion of the Florida Rock site, construction is progressing on Dock 79, the 320ish-unit residential building at the east end of the property (seen above from across the Anacostia River at Poplar Point). The project's web site and Facebook/Twitter accounts having been active for a while, and there are now virtual tours available of studio, 1-bedroom, and 2-bedroom units, as well as the roof.
* JUST BECAUSE: Like that photo up top? Here's the same spot, more than 10 years ago.
Comments (8)
More posts: bardo, dock79, Florida Rock
 

As someone who has, shall we say, a pretty firm grasp on the plans and locations for new buildings in the neighborhood, I admit to a jolt here or there when skeletons arise and become visible--especially in spots at which I hadn't yet imagined seeing them.
With the residential buildings at Florida Rock and 801 New Jersey now in the showy above-ground portion of construction, I got jolted quite a few times during a four-hour walk around the neighborhood on Sunday to catch up on photos.
Here's a few images that perhaps might jolt you too, starting with the one above, looking directly at Dock 79 from the DC Water bridge along the Riverwalk, which also should be compared to this view from just before the final demolition of the concrete plant. And while there's this one that I've been waiting to see, looking east along Potomac Avenue from South Capitol Street, with work on the top floor now underway, there's also the "surprise" view from the Yards Park (click to enlarge):
Dock 79 is also quite visible now when looking south along 1st Street, and even from New Jersey and M (in person, not with a wideish-angle lens!).
As for 801 New Jersey, it hasn't risen more than a couple floors, but it's still starting to show itself at locations other than the intersection of New Jersey and I--like along K Street, at 1st and at 2nd Place (I've added a small helpful pointer in case you aren't seeing it). It's going up a total of 13 floors, so it's only going to get more noticeable from more locations.
Of course, if a favored view is being eclipsed by this "progress," my sympathies. At least someone thought to take "before" photos.
(PS: The Reader Poll will be closing soon, so hurry up and vote. Tell us your favorite haunts around the 'Hood, and tell me a little about yourself. Pretty please? There may be a coveted JDLand t-shirt in it for you!)
Comments (5)
More posts: 801nj, Development News, Florida Rock
 

For posterity's sake, here's a quick survey of the late-summer state of construction at various sites--hope you like the Douglass Bridge-based views of the Arris and Dock 79 residential projects, for a bit of variety. Arris is close to having all of its exterior glass installed, while Dock 79 is just about halfway through to its eventual 10-floor height.
Otherwise, the masonry work continues slowly at the Lofts at Capitol Quarter (lower left), while the windows are in at the new Community Center (lower middle) and the Brig beer garden at 8th and L does show evidence of progress.
 

I'm now back from a much-needed respite in north-central and northeast Wyoming, where the buffalo roam, where the deer and the antelope play (sometimes in your yard), and where the skies are (mostly) not cloudy all day.
While I'm miffed that all work in Near Southeast did not grind to a halt while I was gone, I will still pass along these quick tidbits of news, for those who weren't doing their own newsgathering over the past 10 days.
* CRANES A'PLENTY: The residential projects at 801 New Jersey and 1111 New Jersey have now joined the lineup of sites where tower cranes are in place. This of course means that vertical construction at these locations won't be too far off, should everything go according to plan. And there's probably a crane coming before long at 909 Half as well. (Speaking of cranes, they are often lightning rods--literally, as the Dock 79 crane found out last week.)
* ROADS A'CLOSING: On Wednesday, June 24, Virginia Avenue between 2nd and 3rd Streets SE was closed and fenced, as part of initial Virginia Avenue Tunnel work. And a missive from CSX a few days ago says that the expectation is that Virginia will close between 4th and 5th "on or about" Wednesday, July 1. (But the cross streets will remain open.) Drivers will need to use K Street over to 5th to then continue north under the freeway, or to continue east on Virginia Avenue until that portion of road is closed as well.
* PIZZA PIZZA: There's still the pesky detail of actual construction, but at last a building permit has been approved for Nicoletta, the pizza/pasta carryout kiosk long planned by Osteria Morini's Chef Michael White in one of the small retail bays beneath the Yards Park overlook, on the Riverwalk.
* BARDO DELAYED: The plans for an outdoor park and "brew garden" on the west end of the Florida Rock site are "now looking like a fall opening," according to WBJ--"if we're lucky." "Red tape" is the reason given. WBJ also notes that the Indiegogo crowdfunding campaign that was looking for $200,000 to help fund the venture closed with $4,330 in contributions.
There's probably more to come, but that's good enough for now.
 

I imagine there's some sort of more official rollout to come, but I'll just jump the gun as I see evidence this evening that "Riverfront" isn't going to be the name for the apartment building currently under construction at the old Florida Rock site.
Instead, say hello to "Dock 79," now on Twitter at @Dock79DC.
It looks like there will be an official web site in the near future, but I don't think they are ready for company just yet.
Way (way!) back when, the project was christened "Riverfront on the Anacostia," so I admit to never quite being sure that the "Riverfront groundbreaking" was referring to the project or the building, but no one ever corrected any of posts here or in lots of other outlets using that name for this building.
But now we know.
And I now I must roam through my site to add the new name everywhere.
Comments (1)
More posts: development, dock79, Florida Rock
 
142 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 15
Search JDLand Blog Posts by Date or Category