Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Nationals Park
See JDLand's Nationals Park Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1142 Blog Posts Since 2003
Go to Page: 1 | ... 85 | 86 | 87 | 88 | 89 | 90 | 91 | 92 | 93 ... 115
Search JDLand Blog Posts by Date or Category

Also from last night, the Zoning Commission worked on two Office of Planning proposed amendments to the Capitol Gateway Overlay, Case 05-10 (which was given first approval and will now enter a 30-day comment period), and Case 06-25, which was approved for setdown. Case 05-10 had its hearing in January (here's the transcript, as well as the draft of the changes requested), but has had a few deferrments. Case 06-25 is a proposed CG Overlay amendment to extend the CG boundaries to include properties on the west side of South Capitol Street from M Street south, so that the character of both sides of South Capitol Street matches.
Finally, they discussed Case 06-22, which is the baseball stadium--the hearing itself will be on June 26, this was just a session to allow the commissioners to make comments that the petitioners can then be ready to address at the hearing. Many concerns were expressed about the parking structures, and also about the South Plaza (why it's in a spot where there won't be many people), and about the "knife-edge" administration building. They are interested in finding out "best practices" from other stadiums in urban settings, how parking is handled in those situations. The June hearing should be interesting....
More posts: South Capitol St., Nationals Park, zoning
 

"Owners Want City to Shift Gears on Parking," from today's Post, tells that the Lerners want the parking structures that are part of the stadium site to be built aboveground, while city planners have been pushing to have the garages moved underground so as not to take up precious space with the boxy structures. The stadium's budget calls for two aboveground parking lots, along the north side of the stadium site on N Street, and the Lerners seem concerned that the parking be done in time for the stadium opening, which would be harder to do if the parking garages were belowground (not to mention the extra millions of dollars it would cost--out of the Lerners's pockets--to move them underground). The city is trying to negotiate a compromise. We shall see.... (It should be noted that, despite how the article reads, these structures would not replace the "Ballpark District"--there are still the blocks north of M Street between South Capitol and 1st that are part of the Ballpark District planning of the AWC--this would just mean that the very northern part of the stadium site, along N Street, wouldn't have additional entertainment offerings.)

More posts: parking, Nationals Park
 

Pile driving has begun at the ballpark site, at a spot just northwest of Ist and (formerly) O streets. And the red-brick car repair building on the west side of Half Street has now been demolished, leaving only the industrial buildings on the east side of Half and south side of N, plus Ken Wyban's house on N Street.
More posts: Nationals Park
 

The last building along O Street between South Capitol and Half streets (the "Heat" building at the corner) is now a pile of rubble, completing the demolition of the gay clubs. I took a boatload of photos today, from all angles around the stadium site, and have added them to the stadium construction gallery. Let the icon be your guide.
More posts: Nationals Park
 

Two more buildings have come down in the ballpark footprint in the last 24 hours: the blue Follies building on O Street, and the AAMCO car repair shop on South Capitol between N and O. And the white garage at 1st and N continues to be demolished, the brick parts of the structure near N Place were torn down yesterday.
FRIDAY UPDATE: The trash garage at 1st and O is now completely gone; so is the third of the four buildings on the north side of O (leaving only the four-story building that was home to Heat). The buildings along Half between O and N remain, however--they're probably on next week's agenda. (No new pictures, I'm trying to pace myself a bit.) Even better news--during the 30 minutes I spent walking around the ballpark site, the prices at the Half and M Sunoco dropped from $3.19 to $3.11. (No, I'm not taking credit.)
More posts: Homewood Suites, Nationals Park
 

Longtime readers know that I'm pretty militant about remaining within my Near Southeast boundaries--otherwise, folks would have me covering the entire city, and I don't get enough sleep as it is :-). But I do relent once in a while, especially when it comes to something that's all of about 30 feet outside my purview, and so I'll mention this Post item, "Development Buzz Crosses South Capitol Street," which says: "A Texas real estate investment trust, Camden Living, bought two lots totaling about 41,000 square feet in the 1300 block of South Capitol St. SW at the corner of O Street, just across from the baseball stadium site. [...] Camden Living, which specializes in residential rental properties, is expected to build apartments on the lots, which now house a taxicab company, a storage lot and a small office building." I won't continue to follow this project, but at least those of you who are interested can now do your own sleuthing....

More posts: 1325sc, South Capitol St., Nationals Park
 

The four red-brick rowhouses on N Street between Van and South Capitol bit the dust today; my stadium construction gallery has before-and-after photos, as well as some updated shots of the demolition of the trash transfer garage at 1st and N. (Note that Ken Wyban's restored Victorian townhouse is still standing, at least as of today. Maybe they'll hang onto it for a while, and think about including it in any of the non-stadium entertainment development they might be planning for that spot?)
More posts: Nationals Park
 

The latest stadium demolition news: The big white trash transfer garage at 1st and N is being demolished today, and Ziegfield's at Half and O is now pretty much gone. I added some new shots to the stadium construction gallery, nothing terribly exciting (although I guess the pics of the gaping hole in the middle of the trash transfer building are kind of impressive). I also shot new versions of the overview shots as well, although the differences from last week to this week aren't that astounding.
More posts: Restaurants/Nightlife, Nationals Park
 

Monday's Post article "Next Up: The Baseball Stadium" gives a quick overview to the impact that there might be in having a longtime developer having a stake as team owner in the ballpark neighborhood. No news in the article--was hoping it would tell us when the master plan for the Ballpark District will be unveiled, but alas....
More posts: Anacostia Waterfront Corp., staddis, Nationals Park
 

The transformation of the stadium site from gritty industrial tableau to demolished construction site is proceeding at a blistering pace. (Especially when compared to how it's taken 5 weeks to clear not-even-one-full-block of abandoned buildings at Capper/Carrollsburg.) I've posted a bunch of new photos with "before" photos for comparison, on a new tab on the stadium page called "Construction Photos." And I imagine I'll have a whole new batch next week, as I'm guessing that many of the remaining buildings north of O Street will bite the dust over the next few days. No Time to Lose!
More posts: Nationals Park
 
1142 Posts:
Go to Page: 1 | ... 85 | 86 | 87 | 88 | 89 | 90 | 91 | 92 | 93 ... 115
Search JDLand Blog Posts by Date or Category