Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Dec 13, 2006
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2 Blog Posts

I've heard through channels that the Capper Seniors #1 low-income housing building is possibly within a couple days of receiving its Certificate of Occupancy. 135 of its 162 units are already pre-leased through the DC Housing Authority, but apparently some units at the building are going to be made available to the general public for rental at market rates. There will be a leasing office on site, with the property to be managed by Edgewood Management; when it opens, I'll pass that along, as well as any additional information I get. And there will be an official ceremony marking the opening sometime in early 2007. It's a happy moment for me to see this project completed, because it was its precedessor--the long boarded-up Capper apartment building at the foot of the SE Freeway's 6th Street exit ramp--that helped spur me to start paying attention to news of the plans for south of the freeway....
 

Today's batch of Public Space Permits shows a pending request for a staging permit for 909 New Jersey Avenue, JPI's 230-unit planned residential project, on the block that currently includes the Nexus Gold Club. The rumor has been that Nexus would be closing at the end of the year, and by this permit (which admittedly can take some time to wind its way through the byzantine DC permitting system) would appear to show that JPI is indeed moving forward with this project, as its sister project 70/100 I speeds along a block away.
More posts: 70/100 I, 909 New Jersey, jpi
 




                  © Copyright 2024 JD.