Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Nov 09, 2007
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2 Blog Posts

The second camera angle at the Stadium Web Cam site is back in business, providing a full view of the press box that's now been painted red as well as complete coverage of far left field, where it looks like the turf installation will be completed today. To see it, choose "Centerfield" in the dropdown box at the top of the page.
UPDATE: And the turf is now finished. Kinda looks like a baseball stadium now!
More posts: Nationals Park
 

A notice in this week's District Register says that JPI has applied to remediate the land it recently purchased at 23 I Street, as part of the District Department of the Environment's Voluntary CleanUp Program. Quoting: "The application identifies low to elevated levels of Total Petroleum Hydrocarbons (TPH) and Benzene in soil and TPH, Benzene, and methyl tertiary-butyl ether (MTBE) in groundwater." JPI is planning a 420-unit residential building with ground-floor retail on the site, with construction expected to begin sometime in 2008. The VCP application for 23 I is not yet online, but you can see JPI's 2005 application for 100 I Street and the city's 2006 application to clean up the stadium site to get the idea.
 




                  © Copyright 2024 JD.