Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: May 11, 2008
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

The agenda for Monday's ANC 6D meeting has been sent around (although not posted on their web site, sigh), and it has a couple of Near Southeast items. There will be a presentation on the plans for the Waterfront Park at The Yards, in advance of a May 29 Southeast Federal Center Overlay District Review covering new structures that will be built to house retail pavilions at the park. There's also apparently a public space permit application from the Onyx folks at 1100 First Street for a fence along L Street, plus garden masonry piers and light fixtures. And the developers of the 250 M Street office building are back again, after having not gotten very far at last month's meeting with their request for support for a second-stage PUD modification at a May 28 zoning hearing to increase the building's height (but not its square footage) from what was originally approved, since the commissioners wanted a new round of community benefits in return for their support, which W.C. Smith balked at given that the project isn't requesting to take any new amount of public space. We'll see if there were any negotiations since then. The meeting will be at 7 pm at St. Augustine's church at 6th and M streets, SW.
 




                  © Copyright 2024 JD.