Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Jan 29, 2004
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2 Blog Posts

Forest City Enterprises Inc. has been chosen as the developer of the 44 acres of the Southeast Federal Center not included in the DOT HQ project. This is a huge chunk of the entire Near Southeast Redevelopment, so let's keep our fingers crossed that the winners put forth a fantabulous proposal of residential, retail, office, and park/river/green space (as soon as I can get my hands on their proposal, I'll post it here). For more about What It Means, read the Post story, or the Forest City Press Release, or The Slatin Report.

Comments (0)
More posts: The Yards
 

Still waiting for the school buses to be removed from the Canal Blocks area. Once they're gone (DC was given 90 days notice about 100 days ago), William C. Smith plans to start clearing the blocks in the spring, with the real construction on the park (including hopefully a "water feature") will begin in the future.

More posts: Canal Park
 




                  © Copyright 2024 JD.