Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: riverwalk
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


36 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4

Just a few items to catch up on, though they've already been tweeted (Twitter really is the best friend of a lazy blogger):
* The Navy Yard is having a ceremonial ribbon-cutting for its portion of the Anacostia Riverwalk Trail on Wednesday morning (May 11) at 11 am. It was on April 1 that the Navy opened this long-completed but long closed off stretch, which runs from just east of the 11th Street Bridges to the Yards Park, though it is only open from 8 am to 5 pm Monday through Friday (excluding holidays) and is subject to closure if the Navy deems it necessary. (I finally took my first walk on it from the Yards Park and back recently, though I did it close to closing time and was imagining the hilarity that would have ensued if I had gotten locked in.) This ceremony also dovetails with the start of the BID's Wednesday Lunchtime Concert Series at the park, at 11:30.
* Will from just across the way reports that Camden is having a ceremonial groundbreaking on May 17 for 1345 South Capitol Street, the 276-unit apartment building with ground-floor retail just across from Nationals Park that's been on hold since 2008. Though it's on the Southwest side of the DMZ and therefore in Will's territory (as spelled out in our meticulously negotiated Neighboring Blogger Treaty), I probably won't be able to completely prevent myself from taking photos of the progress from time to time, especially since I have a full set of "befores." But I'll be leaving the bulk of the coverage work to Will.
* The old fogies who were around in the 2004 to 2006 era might remember that a big part of getting the city council to approve the deal to fund and build Nationals Park was the "Community Benefits Fund," which would receive additional ballpark tax money and distribute it to libraries, schools, and other neighborhood developments. But Mike DeBonis reports that Mayor Gray's FY12 budget has a change that essentially makes the mayor and council decide every year whether the fund's money goes to the neighborhood projects or to "other spending priorities" in the city. Citizen groups are unhappy and council members are, too, DeBonis says.
Comments (3)
More posts: 1325sc, Navy Yard, riverwalk, Nationals Park
 

Just released from the Navy:
"Gates at the east and west end of the waterfront promenade (Riverwalk) at the Washington Navy Yard (WNY), will open for limited public access on Apr. 1, 2011. The WNY Riverwalk terminates at the Yards Park to the west and 11th Street SE to the east.
"The gates at both ends of the WNY Riverwalk will be open during base working hours, 8:00 a.m. to 5:00 p.m., Monday through Friday excluding Federal Holidays. Exceptions to these operating hours will be made when restricted access is necessary to accomplish Navy operations. The Navy may block or restrict access without notice for safety or operational reasons.
"The Display Ship Barry, located along the WNY Riverwalk, will be open to the public with access directly from the Riverwalk when the Riverwalk is open. The Display Ship Barry and the Navy Museum can be accessed through the WNY during normal hours when the Riverwalk is closed. Holders of valid Department of Defense (DoD) identification cards will be able to enter the WNY via turnstiles along the Riverwalk during operating hours. Access for non-DoD identification card holders will continue to be via the WNY visitors center, located at the intersection of O Street and 11th Street SE."
Comments (4)
More posts: Navy Yard, riverwalk, The Yards, Yards Park
 

A few small items that might be of interest:
* The National Capital Planning Commission at its Thursday meeting should be approving the design of the 611-foot-long floating bridge to connect the Yards Park with Diamond Teague Park. The "delegated action" document says that the bridge will also include an 81-foot-long platform that will be used as a "marine environmental education center" -- the platform is necessary to span three underground pipes at the DC Water pumping station. At the BID annual meeting in December, it was said that construction on the bridge could begin this spring. (UPDATE) And construction is expected to take 6-8 months.
* If you drive into downtown DC across the 11th Street Bridges late at night/early in the morning, be advised that the ramps from northbound I-295 and 13th Street, SE, will be closed between midnight and 5 am on both Friday, Jan. 7 and Monday, Jan. 10 to allow for work with overhead steel girders. But the South Capitol Street Bridge will be open for your Anacostia crossing pleasure.
* There hasn't been much apparent movement by American Water Taxi to get started with its planned service between Georgetown, the Southwest Waterfront, and Teague Park, but an update on their web site within the past few weeks says that "Focus groups and working group meetings to start in January."
* The agenda for the Jan. 11 ANC 6B meeting includes an item on the "Resolution of the Bavarian Beer Garden [Liquor] License Protest." Does this mean that the ANC and the folks wanting to open the beer garden at 8th and L have gotten the voluntary agreement hashed out, after all the concerns recently expressed? We shall see.
 

The Capitol Riverfront BID just wrapped up its 2010 Annual Meeting, which certainly seemed to be the largest of them so far. The big part of the meeting is the unveiling of the Annual Report, chock full of statistics and photos. I'm not going to summarize it, mainly because I've been writing all year about most of the news and data contained in it, and also because if you're truly interested in the neighborhood you should read it yourself. :-)
There were two items in Michael Stevens' remarks that I thought were of note, though:
* Apparently an agreement has been worked out with DC Water (aka WASA) that will allow the "connection" between Diamond Teague Park (across from Nationals Park) and the Yards Park to be built, starting this spring. In the past, a floating bridge has been discussed as how this connection would be completed, but have asked the BID for more info and will post when I know more.
* In discussing the many parks of the neighborhood, Michael Stevens said that they are "hoping" that Canal Park will be completed in 2011--though, as he said that, the slide being displayed showed 2012 as the expected completion date. Given that the park is supposed to take 12-14 months to build, it would seem to be unlikely that the entire park would be ready before the end of next year, though perhaps some portions of it might be able to be open sooner.
UPDATE: Here's the slides used by Michael Stevens during his remarks; the information on the connection between Teague and the Yards is on pages 22-24, with a rendering showing a walkway out over the water, looking exactly like an extension of the boardwalk at the Yards. The proposed project is listed as "a partnership among Forest City Washington, DC Water and the Office of the Deputy Mayor for Planning and Economic Development." And, on slide 27, Canal Park is listed with a delivery date of 2012.
(PS: I also enjoyed seeing one of my Yards Park photos on the second of the slides shown by DC Water's George Hawkins; maybe next time they'll ask me if they can use it!)
 

Reminding everyone that tomorrow (Sat. Jan. 26) from 1 to 5 pm is the Anacostia Waterfront Community Fair, which will "provide information to residents about the billions of dollars worth of development and transportation projects underway along the Anacostia Waterfront. [...] District government staff, developers, public officials and non-profit partners will be ready to discuss the status in developing and planning of highly anticipated projects including Hill East Waterfront, the Anacostia Riverwalk, Poplar Point, replacement of the 11th Street Bridges, The Yards and the replacement of the Frederick Douglass Memorial Bridge."
The event will be at St. Coletta's, 1901 Independence Avenue, SE, which is next to RFK, and across the street from the entrance to the Stadium-Armory Metro station. I don't know what the parking situation will be. Questions should probably go to DDOT at (202) 673-6813.
Yes, I'll be there, roaming around desperately hunting for new tidbits, so say hi if you see me--I'll be the rapidly aging redhead in glasses. (That should narrow it down.)
Comments (0)
 

Just announced is an upcoming Anacostia Waterfront Community Fair, presented by the city on Saturday, January 26 from 1 to 5 pm, "to provide information to residents about the billions of dollars worth of development and transportation projects underway along the Anacostia Waterfront. [...] District government staff, developers, public officials and non-profit partners will be ready to discuss the status in developing and planning of highly anticipated projects including Hill East Waterfront, the Anacostia Riverwalk, Poplar Point, replacement of the 11th Street Bridges, The Yards and the replacement of the Frederick Douglass Memorial Bridge." (It's like JDLand.com come to life!)
Also: "The Information Fair will allow residents, business owners and interested parties to review, discuss, question and comment on these and other projects which are under construction and/or study."
The event will be at St. Coletta's, which is across the street from the entrance to the Stadium-Armory Metro station.
UPDATED to add the link to the announcement.
 

On Monday (May 7), DDOT is having a media briefing to announce that construction has begun on the Anacostia Riverwalk Trail. This is the first phase, and so doesn't actually include the planned portion of the trail through Near Southeast (from the 11th Street Bridges to the Frederick Douglass Bridge)--according to the AWC page and a meeting AWC held a few weeks back, I believe what's now being constructed is Phase I, the trail on the west side of the Anacostia from the Navy Yard to the National Arboretum. Phase 2 will be on the east side of the river, from Poplar Point to Pennsylvania Avenue, and Phase 3 (the Near Southeast portion) is probably looking at a 2010 date (when the Waterfront Park at the Yards is completed, and they can build the pedestrian bridge to link that park to Diamond Teague Park and Florida Rock.
UPDATE, May 7: A post-briefing press release says that the section of the Riverwalk now under construction is a two-mile stretch that will run from the Navy Yard east to Benning Road. There's also a link to a fact sheet on the trail (albeit from June 2006) that has a map of the planned trail and other information. And here's a WTOP piece on the new section.
 

From an Anacostia Waterfront Corporation press release (not yet posted on their web site): "JBG Companies will present $4 million to help fund neighborhood improvements in the Near Southeast neighborhood, including Washington Canal Park and Diamond Teague Park, at a ceremonial event scheduled for Monday, April 30, 2007 at 11:00 am. The ceremony will take place at the planned site for Washington Canal Park, located at the corner of 2nd and M Streets, SE. Participants in the check presentation ceremony will include District Mayor Adrian Fenty, Deputy Mayor for Planning and Economic Development and AWC Interim President and CEO Neil O. Albert, Ward 6 Councilmember Tommy Wells, At-Large Councilmember Kwame Brown, Chair of the Committee on Economic Development, and Ben Jacobs, President of JBG Companies, who will present a ceremonial check to District officials and AWC. JBG Companies, developer of the new U.S. Department of Transportation headquarters building on M Street, SE, is contributing $2.5 million toward development of Washington Canal Park and $1.5 million toward the development of Diamond Teague Park." And, this additional bit of info about Diamond Teague Park: "The park is being completed in a partnership arrangement with surrounding land owners for area-wide benefit and use. The park's first phase will incorporate interim improvements to include a ferry landing [emphasis mine] and esplanade. Future improvements will include connecting the Ballpark District to The Yards (formerly Southeast Federal Center) with the construction of the Anacostia Riverwalk adjacent to the river bank site currently occupied by the DC Water and Sewer Authority (WASA)."

 

On Wednesday March 21, the AWC is holding an Anacostia Riverwalk Trail and Parks Public Meeting; to quote from the announcement, "The Anacostia Riverwalk is a continuous 20 mile trail system that will link public parks, plazas, and neighborhoods to the Anacostia River. A major section of the trail is due to be completed this year. Come learn about the Riverwalk and the many new parks to be built along the Anacostia Waterfront." There's an open house at 6 pm, with the presentation and discussion from 6:30-8 pm; it's at the Ellen Wilson Center at 750 6th Street SE (just north of the freeway). For more information, contact: Diane Sullivan, Project Director, at (202) 406-4028 or diane.sullivan@awcdc.com. (This announcement isn't yet posted on the AWC web site, so no link, alas.)

More posts: Anacostia Waterfront Corp., riverwalk
 
36 Posts:
Go to Page: 1 | 2 | 3 | 4