Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Retail
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


278 Blog Posts Since 2003
Go to Page: 1 | ... 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 ... 28
Search JDLand Blog Posts by Date or Category

Two pieces in Friday's Post of interest to Near Southeast fans: "Nationals Park Revenue Falls Short of the Mark," detailing how tax revenue for the first year at the ballpark is expected to be about $2.6 million short of the $13.5 million originally projected, and a sidebar piece, "Though Developers Built It, The Tenants Did Not Come," about the empty buildings in the neighborhood, using Lerner's 20 M Street as a jumping off point: "In many ways, the Lerner building -- owned by the Bethesda real estate family that also owns the Nationals baseball team -- is symbolic of the emerging district around the ballpark. Sleek new buildings with offices, condos, apartments and retail space have popped up all over. But many remain empty, seeking tenants in a sluggish economy."
The first piece, on the taxes, also talks about the ongoing dispute over whether the stadium was "substanially complete" by Opening Day, and that the Nationals are still withholding their $3.5 million rent payment. On the other hand, the article says that the city has enough money to cover the debt service on the stadium financing because the special ballpark tax on city businesses is bringing in more revenue than expected.
Comments (0)
More posts: Retail, Nationals Park
 

Rumors started flying in a few places lately that Whole Foods is coming to New Jersey and K, SE. I usually shy away from writing about rumors, but this one is persistent enough that it probably needs some addressing. It's not listed on their Stores in Development page, and no one's leaping to tell me this is or isn't true (which isn't surprising), but it's not completely out of the realm of possibility. There's been references here or there to "two grocery stores" coming to the neighborhood (with space for one set aside at the The Yards, coming in 2011 or later), and I've heard nonspecific Whole Foods/Near Southeast rumors a few times over the past year.
But I'm skeptical about it coming to the New Jersey/K intersection. There's only 6,000 square feet of retail in 909 New Jersey (not enough for a grocery store), and the plan for the trash transfer station has always been for it to be part of the Capper Hope VI project, with an apartment building that probably won't start before 2011. That leaves the southwest corner, where the Cohen family owns the small lots along K between New Jersey and First; there's also the Positive Nature lot at 1021 New Jersey and one to its south owned by Potomac Development Corp., who it should be noted picked up 51,000 square feet of transferred development rights earlier this year. (Can someone at CHT look out their window and confirm that the Positive Nature sign is still there?)
So maybe the "New Jersey" part is right, but not the "K"? My gaze (and my betting dollars) might head north a block or two, to 800 New Jersey (also sometimes known as 120 Canal), where for years William C. Smith has envisioned a grocery store as part of its planned 1.1-million-square-foot four-building development on the Square 737 block bounded by Second, H, New Jersey, and the eventually reconstituted I Street. No timeline for the start of this project has been announced, though. (In fact, there's so little information about the project that I haven't even felt compelled to build a project page for it.)
In other words, there aren't really any tea leaves to be read on this one, so if someone wants to spill the beans, I'm always listening.
 

* As I mentioned below, the garage that housed both the Merritt and Four Star cab companies started getting brought down today. They didn't get it all on Thursday, but I imagine by sundown Friday the rest will be gone. (See pictures from midmorning, though it's hard to see much in the way of a difference from First and K, since they took out the back of the building and only a smidgen of the K Street facade.)
* Only a few hours after I said that Capitol Quarter framing would start "in the next few days," lumber went up on the first house on the south side of L east of Fourth. (No pictures yet--this weekend!)
* Sometime this week the crane was put up at 1015 Half Street, so we should be seeing vertical construction before too long.
* Building permits for the external renovations to 900 M Street are now winding their way through the bureaucracy. No word yet on any retail tenants.
 

It's more than six months away, but the second phase of the Waterfront Park at the Yards is now scheduled for a Zoning Commission SEFC Overlay District Review on March 2, 2009 (after having briefly been scheduled for Nov. 17, 2008). It's in this review that we'll see the plans for the renovation of the Lumber Shed into a glass-walled retail building, plus the designs for two new two-story retail pavilions connected to the shed's east side. There will also be the first look at the proposed "public art tower" that Forest City is wanting to build right on the waterfront at Third Street.
You can see early designs for the three retail buildings (and the position of the art tower, if not the design itself) in the rendering on my Yards Park page, right at the center, and of course plenty of photos of what the area currently looks like.
One other project at the Yards park that is just starting to pop up on the radar is a new "main campus building" for Living Classrooms of the National Capital Region, to be located on the far eastern edge of the park (just off the right edge of the rendering), along the waterfront just before the park meets the Navy Yard. Living Classrooms is a non-profit group that "uses maritime settings, community revitalization projects and other challenging learning environments" to provide hands-on education and job skills training for students (especially at-risk youth). They will be handling the design and management of the new environmental center at Kingman Island further up the Anacostia, and currently operate out of Building 74 at the Yards (the little brick building--to be townhouses someday--just west of Hull Street at M, seen here). And, according to their web site, Living Classrooms has been "asked to oversee and manage marina and some waterside activities" at the new Yards park.
There is no timeline for when Living Classrooms' new building will get underway. It's currently in the design phase (see an early rendering here), and when that's completed, there will be a fundraising drive to finance the project.
Comments (0)
More posts: Retail, The Yards, Yards Park, zoning
 

Pulling together some previously Twittered items (the most recent of which you can always see on the JDLand home page, beneath the big map):
* This morning's Crime Incidents feed update shows two recent burglaries, one yesterday in the 900 block of New Jersey and one Friday in the 200 block of K. No narratives as to what happened are available yet.
* There's now a big Wachovia sign on the western end of 20 M Street.
* The Nats start a home stand tonight, first against the Mets and then this weekend against the Rockies. Because of DC United home games at RFK, the Nats Express will be operating out of Lot 7 both tonight (Tuesday) and Thursday (Aug. 14).
* On Thursday night there's a Ladies Night Out and Home Run Happy Hour at the ballpark, with all sorts of enticements to get the girls to come out to the ballpark. Tickets are $30. More info here.
* The Nats "First Ladies" (the players' wives and girlfriends), partnered with the UPS Store and the Marine Toys for Tots Foundation, collected over eight bins of school supplies and $6,500 in cash donations during their second annual Back-to-School Drive on Aug. 2 and 3.
Comments (0)
More posts: 20 M, crime, Retail, Nationals Park
 

Last week the folks at Forest City were gracious enough to take me on a behind-the-fences tour of the The Yards, so that I could stock up on "before" photos before too much more work gets underway. The first stop was Building 167, also known as the Boilermaker Shop, on the northeast corner of Third and Tingey streets behind the US DOT HQ. This steel-and-glass industrial workshop (such a rarity for Washington) was built in 1919, and by the end of 2009 Forest City expects it to be transformed into a 46,000-square-foot retail space, with a new loft-like mezzanine in the middle of the building that will provide additional square footage without sacrificing the wide-open feel of the high glass-lined ceiling. I have wanted to get inside this building for a long time, so I'm glad to now have photos in advance of the shop's makeover, which you can see on my Boilermaker Shop page along with renderings of what's coming.
Across the street at the old Pattern Joiner Shop, interior demolition work continues, along with the removal of all the windows and the white paint from the building's exterior. We didn't get to go inside, but I've still posted some updated photos, which you can compare to shots from the past three years to see what's been done in just a few months. By late 2009 this will become the Pattern Shop Lofts, with 170 apartments, ground-floor retail, an interior courtyard, and two new floors on top.
I also snagged some photos from a few other locations, too, and I'll get those posted soon.
And, if you're wondering What's the Deal With the big hole punched in the historic red brick wall on M Street east of Fifth--apparently that's the start of the necessary work to create 5 1/2 Street, SE (no, I'm serious), which will run between the big red brick Building 202 (to be turned into condos by 2011) and Building 74 (forecast to be converted into townhouses in a future phase of the Yards). Here's an overhead photo of the spot in question, taken from the roof of the old Capper Seniors building before it came down last year.
 

Not that there's probably anybody left in town (*tap* *tap* -- is this thing on?), but just in case, here's a few items before I downshift into low-posting holiday mode over the weekend and into next week:
* My Ballpark and Beyond column in today's Post covers some of the latest news on retail (i.e., banks) I've posted here over the past few weeks (Wachovia at 20 M, SunTrust at 100 M, plans for 900 M). There's also a blurb on the month-old news of the zoning approvals for the Waterfront Park at the Yards. The column normally appears in just the District Extra, but If you live in Prince George's County, you got a crack at it this week as they snuck it in on page 11 of the P.G. Extra, too. But note that we're scaling way back on how often the column will appear (probably just monthly from now on) since the news isn't flowing as fast and furious-ly as it was last year.
* No one's invited me to the roof of any of the sparkly new Near Southeast buildings to watch the fireworks. I'll say it: I'm miffed. I do and I do and I do for you people, and this is the thanks I get.... [/sarcastic martyr mode off]
* I've tinkered again with the big homepage map, trying to have it make a little more sense. I've added checkmarks for the completed projects, and turned the list of projects down the left side (marked on the map with boxes) into only ones that are under construction or ones which the developers have done an especially good job of making me believe they'll start soon. The rest of the map is a whole lot of stars marking proposed projects. And they're all color-coded to differentiate between office, residential, and recreational/retail.
My real desire is to completely redesign the homepage, but I haven't had any inspirations come to me yet. Although, in the meantime, I've added another three random before-and-after photo pairings down on the bottom right of the homepage (after you do a lot of scrolling), just to fill some space. I also expanded my Neighborhood Blogs list of links.
Happy 4th, everyone!
Comments (0)
More posts: 900m, Retail, The Yards, Yards Park, zoning
 

* DDOT told me these were coming a long time ago, and a reader whose e-mail I've lost gave me a heads up a few weeks back, but now I've finally visited for myself to see that the ugly cyclone fences on the South Capitol and M overpass have been replaced with pretty gray-painted ironwork.
* You have to look kind of closely, but construction has indeed started at Capitol Quarter, with pretty new curbs being installed on the south side of L Street between Fourth and Fifth. You can see them if you squint at the photos on my Capitol Quarter Phase I page.
* The owner of the Third and K Market at, um, Third and K must be keeping track of what's going on nearby, because there's now a For Rent sign tucked in the door. (Alas, all the info sheets were gone when I got there.) If you've ever dreamed of running a corner market, here's your chance. The market's been closed since about 2006.
* The "Wachovia Coming Soon" sign is back in the window at 20 M, so my building permit reading was on the mark. (It's in the window on the far western edge of the building.)
UPDATE: Speaking of 20 M, GlobeSt.com is reporting (tucked in a piece on LEED Gold certification for 1100 New York Avenue) that several leasing deals are pending for 20 M. So perhaps that's why Wachovia has decided to start moving forward.
* I did a bit of needed housingcleaning to the home page map and project directory--adding in 88 K as a "featured project", demoting 1345 South Capitol to "star-only" status until the project starts moving forward again, and adding a few additional stars for projects like the coming retail renovation of 900 M Street.
I also did some updating of the tabs with the lists of projects--if you don't realize the tabs are even there (look just above the map for "Residential/Office/Retail/Hotel"), take some time during this lazy summer to click on them and be stunned and amazed by the easy access to project information....
 

During two looooong photo treks today I found a new fence draping on First Street between I and K, advertising the three-building office-and-retail project on Square 696, now dubbed The Plaza on K. It indicates, as I was gleaning a few weeks ago, that DRI/Transwestern are indeed planning to move forward with 88 K, the first phase of the project, later this year, with delivery in mid-2010. There's now an official ThePlazaonK.com web site, for those of you looking to lease office or retail space.
Thankfully the nice sunny day allowed me to snag really good photos of the two renderings on the fence sign, which are shown above but which you can see in non-micro version on my Plaza on K page (scroll down a tad to see them--you have to be looking pretty close to realize they're not digital files). Both renderings show the planned 8,000-sq-ft public plaza on K Street just west of First Street. The project page also has lots of photos showing how much Square 696's "neighbors" have changed in the past few years.
Now we're just waiting to see when the old cab garage at First and K gets demolished....
(And--lots more photo updates coming over the next few days, so keep checking back.)
Comments (0)
More posts: Retail, Square 696 Residential
 

With thanks to architect Gregory Powe, I've got the early elevations for the planned renovations of 900 M Street, the beige one-story building that is being converted into a retail space. (You can see a larger version here, showing both the M Street and Ninth Street facades, which you can compare to current photos of the building). As I wrote a few days back, this building that was once a Hudson automobile dealership and more recently a dialysis unit is looking to become home to "three national tenants," though none have been named. Historic Preservation Review Board staff have now approved the design, and it's also been presented to the Capitol Hill Restoration Society and ANC 6B's Planning and Zoning Committee. Building permits for the exterior renovations are expected to be applied for this summer.
Comments (0)
More posts: 900m, Retail
 
278 Posts:
Go to Page: 1 | ... 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 ... 28
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.