Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: New Jersey Ave.
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


51 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6

Today was a bonanza of Near Southeast alley closing requests, as four pending bills received their public hearings in front of the city council "Committee of the Whole" (i.e., Chairman Cropp, the only council member in attendance).
The first was B16-0799, alley closings and new street designations as part of the Capitol Quarter/Capper Carrollsburg project. Nothing really new in the testimony, except that it has been requested that the bill be considered by the council on an emergency basis, in order to help speed the process of getting the project underway. Ms. Cropp called the project "very, very exciting" and seemed particularly enthused by the mixed-income aspect of the project, noting that the city's past creation of "economic ghettos" hasn't worked out well.
Next up was B16-0888, which seeks to reopen H and I streets between 2nd and New Jersey, and to close alleys and streets within those two blocks; I was not aware until today that a portion of this land is actually federal land (Reservation 17A), which is part of the land transfer bill currently pending before Congress. The northern block (Square 737, north of I) is where William C. Smith is planning a mixed-use project, which in their testimony they broke out as two office buildings totalling 600,000 sq ft, two apartment buildings totalling 600 units (with a 10% affordable housing component), 1100 parking spaces, and 80,000-100,000 sq ft of retail space. They mentioned that back when they first bought the land in 1999 they got a letter of intent from Whole Foods to include a grocery store in this location, but then Whole Foods came down and saw that at that point there wasn't a whole lot of development going on, they pulled out; but Smith is still very interested in getting a grocery store in this development. They anticipate beginning work on this project in 2008 and completing it in 2011. As for Square 739 (where the DPW trash transfer station currently resides), it is actually part of the Capper/Carrollsburg redevelopment, and plans are for a 322-unit apartment building with 115 affordable units, and also ground-floor retail. They don't anticipate beginning work on the building for at least another 4 to 5 years. Ms. Cropp did express some concerns about where the DPW vehicles will be relocated to, given the lack of industrial land left in the city.
After lunch was B16-0879, Monument Realty's request for alley closings on Square 701 between Cushing, Half, M, and N (in the block just north of the ballpark) as part of their "Ballpark Phase I" project, which also includes the expansion of the Navy Yard Metro station at Half Street, which Monument is responsible for as part of their purchase of the WMATA land on the southwest corner of Half and M. New news from the hearing is that there will also be a hotel in addition to the previously announced 275,000-sq-ft office building at Half and M and the 350-unit residential building (mix of rental and condo, with up to 20% affordable housing) at Half and N--Monument is working with W Aloft to develop a 200-key boutique hotel on Half Street. The entire project will have 700 parking spaces, and Monument is planning to begin construction in January 2007 so that these three levels of underground parking (as well as perhaps some of the 50,000 sq ft of planned ground floor retail) can be completed by Opening Day 2008; they will then continue work on the upper floors to have the entire project completed in 2009. UPDATE: I should also note that as part of their plans, Monument will be extending Cushing Place approximately 80 feet, so that it will run through to N Street
Finally came B16-0880, another request from Monument Realty, this time for alley closings on the west side of Square 700, just across Half Street from the Phase I project in the previous alley closing hearing. They are still negotiating with WMATA to attempt to purchase the bus depot land on Square 700, but in the meantime are moving forward with a 115,000-sq-ft/100 unit residential project on the northwest corner of Half and N, on the site of the Good N Plenty carryout (whose lease expires today, it was mentioned). This project will have 12,000 sq ft of ground-floor retail, which, given its location directly across from the stadium plaza entrance, will be quite a prime location. Ms. Cropp was concerned that the project will only have two levels/74 spaces of underground parking (you got the feeling that parking is very much on her mind these days!). There was no stated timeframe for this project, except to say "after Square 701." And of course by then they'll have probably secured the bus depot.
For all of these bills, the next step I believe is getting them on the council consent calendar, for votes to be taken.
Is that enough information? Can I stop now? :-)
UPDATE: These hearings are all available via DC Cable 13's on-demand video offerings.
 

Today's Post writes about the two lots in Near Southeast that WMATA has announced will be made available for private development, the 14,000-sq-ft lot on the Southeast corner of Half and L and a 4,000-ft patch around the eastern entrance to the Navy Yard station at New Jersey and M. Not really too much in the piece that I didn't address in my own entry eight weeks ago when WMATA announced the search, but it's also a nice way to be able to post here that the deadline for developers to submit their proposals is Nov. 17. The article does mention, however, that sometimes these joint development opportunities don't always move like wildfire: "Once WMATA chooses a developer, the proposals must be reviewed by local jurisdictions and the Metro board. Getting the appropriate permits can be a lengthy process. Developers at the Prince George's Plaza Green Line station were selected by WMATA in 2000 but broke ground only last year."

More posts: Chiller Site/WMATA, Metro/WMATA, mnorth, New Jersey Ave., square 698
 

City Council hearings have now been scheduled for October 31 for three Near Southeast alley closing bills (Monument's Square 700/west side and Square 701 requests, and William C. Smith's Square 737/739 request). I've added them to my busy Neighborhood Events Calendar; I've also (belatedly) added the DC Register announcement of the Alcoholic Beverage Regulation Administration hearing on the license request for a new liquor store at 156 L Street (the old Star Market) scheduled for Nov. 8. Note that the Square 701/east side alley closing bill had its hearing on Oct. 10. UPDATE, 10/20: The starting times of the three alley closing hearings on Oct. 31 have been revised, and an additional council roundtable has been scheduled for the same day on the Capper alley closings and new streets bill. All the hearing notices are available in this file, which also includes the notices on the Oct. 23 hearing on the Capper PILOT funding bill and also an Oct. 26 roundtable on LSDBE participation in the baseball stadium. My Neighborhood Events Calendar has been updated as well. Also, the Square 701/east side alley closing bill has been placed on the council's Nov. 14 consent agenda.
 

With thanks to loyal reader Eric for providing the needed push, I've added another detail map, this time for New Jersey Avenue, giving the scoop on what's planned along what could eventually be quite the grand boulevard. And I added a few new photos, too, including finally officially documenting the horse stables tucked under the Southeast Freeway just east of NJ Ave. (I guess I didn't want everyone running over there and bothering them :-). ) The other maps, for your perusing pleasure, are of the Stadium Corridor, M Street, and Capper/Carrollsburg (and I've tweaked the main map at left to highlight these additional offerings).

More posts: New Jersey Ave.
 

The City Council's long summer break is at last over, and three alley closing proposals that we've been hearing about all summer have finally been entered into the council's online legislation system: Monument Realty's requests for alley closings on both the west side of Square 701 and the southern section of Square 700 (both part of Monument's Ballpark District sites), and William C. Smith's request for realigning the streets in Squares 737N and 739 to make way for a 900,000-sq-ft mixed-use project at New Jersey and H. (And, just for fun, here's the description of what's being requested in Square 739: "[T]he closing of the public alley in Square 739, bounded by New Jersey Avenue, Canal, 2nd, and K Streets, S.E.; the opening [of] I Street, S.E. between 2nd Street and New Jersey Avenue, S.E.; the widening [of] 2nd Street, S.E. between I and K Streets, S.E.; the widening of New Jersey Avenue north of Canal Street, S.E.; the opening of H Street, S.E. to connect to New Jersey Avenue, S.E.; the closure of Closing Canal Street (North), Canal Street (South), and a portion of First Street, S.E.; to accept the dedication and designation of Reservation 17-A and Lot 801, Square 737N for public street purposes; to authorize the improvement of the dedicated land for street purposes; to authorize modifications to the permanent system of highways in the District of Columbia; and to designate the dedicated streets as I Street, S.E. and H Street, S.E and New Jersey Avenue, S.E. in Ward 6." Whew! UPDATE: I should also note that the two Monument Realty requests (Square 700 and 701) are delegated agenda items at the Oct. 5 National Capital Planning Commission meeting.
 

WMATA has released a Joint Development Solicitation for two sites in Near Southeast--the eastern entrance to the Navy Yard subway station at New Jersey and M, and the chiller plant on the southwest corner of Half and L. The sites would be offered for long-term leases, with the goal being Transit-Oriented Development: "safe, walkable, mixed-use communities that emphasize transit connections and reduce auto dependency." The 4.400-sq-ft New Jersey and M site is interesting because it butts up against Donohoe's planned 1111 New Jersey Avenue office building, and the JDS states: "The Anacostia Waterfront Corporation has indicated a preference for the ground floor area around WMATAs eastern entrance to be an attractive public plaza, complimenting the new development in the area. In this case, development on the parcel would largely occur above the street level." I'm not sure how you create an attractive public plaza that has development above it.... I'm guessing that Donohoe will be quite interested in this land (and their rendering of 1111 NJ does indeed show a very nice plaza). As for the chiller site at Half and L, it's 14,100 square feet, with a 7,700-sq-ft privately owned strip right next to it that combined could allow for a 200,000-sq-ft development (just like 20 M Street just to its south). With two other parcels at the corner of Half and L ready to be developed (the Nation site and the Ron Cohen Square 699N project), I'd imagine this site will garner a fair amount of interest. Proposals are due to WMATA on Nov. 17.
 

Voice of the Hill has posted it's summary of the July 10 ANC 6D Meeting. It's a bit of water under the bridge at this point, but it's still worth noting here that the ANC did vote to oppose the Garages Wrapped With Development Goodness, which were then approved the next day by the city council. Also on the agenda had been William C. Smith's request for alley closings and street openings in preparation for its development project at 800 New Jersey Ave. The proposal was referred to the ANC's development subcommittee, with there again being debate about what "community benefits" the project would be providing. According to VOTH, the "William C. Smith representative pointed to amenities his company has already promised, including an affordable housing component and funding for a public park." The public park being Canal Park, which William C. Smith is helping to fund. (Note that the alley closing/street opening request is on the Aug. 3 NCPC agenda.)

 

The tentative agenda for the National Capital Planning Commission's August meeting has been posted, and there's one item of Near Southeast interest: a request for some street and alley closings, and also some street openings, in Squares 737 and 739 (see my terribly low-tech map of the Near Southeast Tax Parcels). What is being requested is to close the current 1st and Canal "streets" on Square 737, and at the same time allow H and I streets to be extended from 2nd Street through to New Jersey Avenue. Making the request is the William C. Smith Company, which owns the land on Square 737 that's currently a surface parking lot--they have plans for a big (900,000 sq ft) mixed-use development, although I've heard nothing about these plans moving forward. Perhaps this request is the first hint that they are thinking about it? And I know people will also be wondering if this means that the dreaded DPW station at New Jersey and K is also on the way out, to which the answer is: eventually, but I don't know when. (The DPW lot/Square 739 is actually part of the Capper/Carrollsburg planned-unit development, with an apartment building slated to be built there. Someday.)
More posts: Capper, Capper New Apt Bldgs, New Jersey Ave., WC Smith/Square 737
 

Donohoe appears to be continuing to move forward with its office project on New Jersey Ave., now christened 1111 New Jersey (just north of the Navy Yard Metro station at New Jersey and M). A page on the Donohoe Real Estate Services web site describes the project: 146,000 sq ft, 12 floors, designed by WDG (who've also designed a pile of other buildings in Near Southeast), and delivery in 2008 (which would mean that construction would need to start by early 2007). At this time, the project doesn't include the land still occupied by St. Matthew's Baptist Church at New Jersey & L--I've heard through the grapevine about negotiations over the past year or so, but apparently no deal has been reached. (I haven't yet created a page for this project, I'm waiting a bit to see if anything changes with the church.)

 

Thanks to a tip from an eagle-eyed correspondent, I can pass along that a sign has materialized on New Jersey Avenue just north of the Navy Yard Metro entrance at M Street that says: "Donohoe Real Estate Servies / CORFAC International / Office Space for Lease / 150,000 to 250,000 SF." A bit of poking around the Donohoe web site finds this "What Have We Been Doing Lately?" page, which includes this lot, and gives "late 2008" as a delivery date (and also says that the project will include retail). Donohoe paid $6.2 million in early 2005 for 10 lots (totalling about 16,000 sq ft) along New Jersey north of the Metro entrance, up to but not including the St. Matthew's Baptist Church. I know that the church has had developers knocking on their door, but I don't know whether Donohoe has bought the property (no such transaction appears in the DC land records through early April). With this project now appearing to move forward, that makes at least eight high-rise projects (maybe 10, maybe more) that are looking to start construction in the next 12 months. Between all that and the stadium, you might want to start wearing a mask to protect yourself from all the dust that will be flying in Near Southeast.

 
51 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6




                  © Copyright 2024 JD.