Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Capitol Quarter
See JDLand's Capitol Quarter Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


150 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 15
Search JDLand Blog Posts by Date or Category

A couple small things from the past few days:
* For the second time in eight years, Capitol Quarter's EYA has been named America's Best Builder by Builder Magazine, which cited "its commitment to high-quality design, building in areas featuring life within walking distance, and industry leading results on homebuyer satisfaction and referral sales."
* From WTOP, news that the current occupants of the encampment at First and M are seeing the tab for their move escalate a touch: "The estimated cost of building a sprawling new complex at Fort Belvoir to house [the National Geospatial-Intelligence Agency] and its 8,500-strong work force will be $350 million more than prior estimates, according to a report from government auditors." It's mandated that they have to be moved into their new digs by September 2011, but the GAO report "warned that the agency's small window for delays means that 'any unmitigated disruptions can jeopardize' meeting the 2011 deadline." The price tag is now $2.44 billion.
* Today's Examiner has another installment of their Three-Minute Interview series, this time with, um, me. (Nationals historians might enjoy knowing that the accompanying photo [better non-cropped version here] was taken the night the team came home from spring training to see their completed ballpark for the first time.)
Comments (0)
More posts: Capper, Capitol Quarter, Nationals Park, The Yards, Parcel A/Yards
 

Some little items to head into the weekend:
* The Capitol Riverfront BID is going with a Best of the 80s theme for its Riverfront Reel summer outdoor movie series, and has a survey up to determine the most popular flicks. (Though let me just say that the omission of Die Hard has me white with rage....)
* DDOT is holding an "Anacostia Waterfront Forum" on Feb. 17 at the MLK Library at 6:30 pm, "on the role that replacing the 11th Street Bridges will have in creating a more inclusive and sustainable Distrct."
* Also from the BID, news that the Earth Conservation Corps has scheduled a dedication ceremony for Diamond Teague Park on April 28. I've been told that if all goes "as planned," the construction of the in-water structures (the docks and the piers) should be completed by Opening Day, though the plantings and other work on the dry-land portion of the park would be completed by the beginning of July.
* Greater Greater Washington is not happy that the US DOT is having a "sale" on its parking spaces.
* City Paper's Housing Complex blog is bewildered about where this Capitol Quarter "neighborhood" might possibly be. (Teh Google probably could have answered that.)
* The US Department of Justice and some Shell Oil entities are nearing a $2.1 million settlement for damages and cleanup costs at the Southeast Federal Center (now the Yards) after what the feds allege was benzene, toluene, ethylbenzene and xylene contamination of soil and groundwater "from leaking underground storage tanks located at a former filling station adjacent to the contamination."
* I did attend last night's zoning hearing on Akridge's Half Street project, and will post a summary when I recover from the nearly four-hour session. But I did hear that the bus garage on the site will be demolished pretty soon, to make way for temporary parking. Both Akridge and Monument are talking with the Nationals about providing their spaces for gameday parking. (Monument has told me that their underground garage at 55 M--and the little addition to the south--will be complete by Opening Day.) That's a lot of spaces that weren't around last year....
* DCRA has restarted the Building Permits feed. And there was much rejoicing.
 

From a press release just out, word that EYA will be seeking LEED for Homes certification for Capitol Quarter: "The neighborhood's proximity to public transportation, employment centers, parks and neighborhood retail reduces the amount of time homeowners spend in their cars. Add to that environmentally friendly building materials such as Energy Star appliances and windows, water saving plumbing fixtures, high efficiency heating and cooling equipment, and low VOC paints and finishes. The homes at Capitol Quarter provide more energy savings, better indoor air quality, and less impact on the environment than standard new townhomes -- all qualities that the LEED for Homes program is designed to promote." Also from the release, this: "Traditionally, LEED certification has been sought by builders for commercial buildings and custom residential homes. Capitol Quarter will serve as a model for volume builders in how to implement LEED for Homes on a larger scale."
UPDATE: Here's the release on EYA's site, which reminds me to note that this will be the largest LEED for Homes development in the country.
Comments (0)
More posts: Capper, Capitol Quarter
 

I took a nice tour of the action spots around the neighborhood today, getting updated photos of the very showy progress at Capitol Quarter and 1015 Half Street.
I also snuck across the river (don't tell) to get a peek through my zoom lens at the goings-on at Diamond Teague Park, plus I took a photo or two through the fence at First and Potomac. It looks like the gangplank from the shore to the pumphouse has been dismantled; and there's definitely "in-water" work going on.
I also got a good batch of updated photos for 55 M, and gave my Monument Half Street page a badly needed refreshing--there's also this shot of the construction on the extension of the underground garage (and the shored-up hole on the south end of the block), as seen from Nats Parking Garage B.
I even took my first(!) set of photos at 11th and L, where the Southeast Freeway bends toward the 11th Street Bridges, to get an official "before" baseline in advance of the reconstruction and reconfiguration of it all. (And I found this plaque on one of the flyover pillars, which might be worth a chuckle or two.)
If you want to see the entire batch of new photos on a single page, here they are, though it's about a hundred of them so be patient. But the links above are better if you want to see them matched with their "before"s.
(Oh, and that dinky little For Sale sign at 10th and M by the Exxon that I wrote about on Friday is gone. Drunken property advertising?)
 

I haven't seen it with my own eyes yet, but a couple readers reported yesterday (as I Twittered) that Capitol Quarter vertical construction has now begun on the north side of L Street between Fourth and Fifth, across from the units already well underway. (There's also a rumor that bricking will begin on those first townhouses soon.) The foundations have been underway on this block for a while, so I'm assuming it's the showier framing work that has begun. I'll give them a day or two to make some progress, and will get photos this weekend.
Comments (0)
More posts: Capper, Capitol Quarter
 

I was unfortunately unable to get to Monday night's ANC 6D meeting, thanks to an avalanche of Inauguration-related work at my real job that couldn't wait, plus there was the arrival yesterday afternoon of my brother's third child, Teddy. (And if you think you've got it bad over the next week, light a candle for him--he's Washington correspondent for the Cox Radio Network, and has to cover all of the inauguration while tending to a newborn and two other kids under the age of five who will be wondering what that squirming, crying package is that arrived at the house.)
Anyway, I've been able to find out that the ANC gave its support to Akridge's planned 700,000-sq-ft mixed-use project on Half Street between M and N, subject to the finalization of the community benefits package. I wrote a long entry after last month's ANC meeting describing Akridge's designs for the project, if you want all the details. I hope to get renderings within the next few weeks, in advance of the January 29 Capitol Gateway Overlay Review.
I hope to find out soon whether the illustrious Capitol Quarter trash enclosures discussions have been brought to a close.
(And I hope to make it to tonight's ANC 6B meeting, which will have a briefing on the South Capitol Street EIS. But only if work doesn't intervene again.)
Comments (0)
More posts: West Half St., ANC News, Capper, Capitol Quarter, inauguration09
 

The agenda is out (though not net yet online) for Monday's ANC 6D meeting, and if you've liked the past few meetings, you'll love this one, because it's pretty much a rehash of recent agendas: the Capper PUD modifications (described here), the Capitol Quarter trash enclosures (perhaps the fourth time's the charm), and Akridge's Half Street project, which is going to the Zoning Commission at the end of this month. (For Southwest folks, the Hogate's liquor license discussion is back, too.) And, although it's not on the agenda now, I'm guessing there might be some inauguration-related discussions. The ANC meets at St. Augustine's church, Sixth and M streets, SW, at 7 pm.
Comments (0)
More posts: West Half St., ANC News, Capper, Capitol Quarter, inauguration09, meetings, zoning
 

I don't dare tally up how many photos I've taken over the past 12 months, but suffice to say it's a lot. That didn't stop me from a quick lunchtime trek around the neighborhood to grab my final pictures of 2008, with a starkly blue sky as an end-of-year gift. Here's a boatload of before-and-afters for your perusal:
I started at Capitol Quarter, where the first three townhouses at Fourth and L are already framed, wrapped, and window'ed (I imagine the developers are trying to get those units finished as close to "on schedule" as possible). Here's the before-and-afters for the intersection's southwest corner; be advised that taking southward-facing photos in winter is no fun at all, so apologies for all glare, skipped angles, etc.

I next ventured to The Yards (USDOT security guards be damned!) for updated photos of the Foundry Lofts construction, where most of the framing of the two new top floors appears to be finished. And both Third and Tingey streets are now nicely paved and curbed, which you can see along with the Foundtry Lofts construction in these Third and Tingey photos, and also in shots from one block west, at what someday will be Second and Tingey. And, for the heck of it, here's a few new New Jersey and Tingey images. (Remember to look for the icon, as always.)
And, acting on tips from alert readers, I checked out the Third and K Market, which is now being gutted. There was no one around to answer any questions as to what is up, but seeing work getting done a few months after a For Rent sign went up (and quickly disappeared) would seem to be a good sign....?

I also went to First and M, where workers at 100 M have now given back one lane of M Street and told me that the median east of First will be rebuilt soon (as the one west of M recently was). The silver bullding against the unbelievably blue sky makes for a nice tableau in these updated photos.
There are also a few updated shots of 909 New Jersey, taken mainly from the First and I intersection, which is also notable for the nice little fence and landscaping that's now gone in across the empty lot to the east of 100 I, visible in many of these new photos.

Will that tide everyone over until the new year? I know I'm now good for a while....!
 

* As Tweeted on Saturday night (after cheering my Gators onto victory), framing has indeed begun on Capitol Quarter v2.0. They're not exactly the most thrilling photos (it was some tough almost-winter lighting conditions), but if you need proof, here they are, with their befores.
* Yet another mid-month event announcement to pass along--on December 16th, 17th, and 18th, the BID is putting on a Holiday Market at 1100 New Jersey Avenue. It will run from 11:30 am to 6 pm, and will feature "local artisans selling handcrafted jewelry, pottery, crafts, watercolors, photography, and more."
* Looks like maybe the 3rd and K Market might be stirring. I haven't heard anything official (though we saw that "For Rent" sign in the door a few months back), but there's been a slew of permits and the concrete surrounding the building has been torn up to apparently do some re-pointing of the bricks near ground-level.
* Less pleasant news from the same block--looks like there was a fire just within the past few days in the second floor of one of the rowhouses on Third Street--the top-row windows are gone, and there's black soot across the upper part of the front of the house. Anyone know what happened?
* I finally gave the new camera its first Hood workout on Sunday morning, despite the 40-mph winds and "variably sunny" weather that provided some icky overcast shots followed seconds later by brilliant blue-sky vistas, though it must be said that this model does a much better job of handling backlit buildings than my previous one. (And it was too dang cold to think about sticking around waiting for clouds to clear.) I'll post them in separate entries over the next few days. Got to s-t-r-e-t-c-h out the decent content nowadays.
Comments (0)
More posts: Capper, Capitol Quarter
 

The agenda for Monday's ANC 6D monthly meeting is out, and the most enticing item is Akridge looking for the commission's support in advance of its Jan. 29 Capitol Gateway zoning overlay review for its new 700,000-sq-ft mixed-use development at 25 M, on the site of the old WMATA Southeastern Bus Garage, in the block directly north of Nationals Park. At this point, little has been put forth publicly about the project other than it'll be a office/residential/retail mix, and is expected to get underway in early 2010.
Also on the agenda is a third go-round with the DC Housing Authority over the designs for some external trash enclosures for some of the units at Capitol Quarter. I wrote about the first discussion here, and the Hill Rag has the report on the second one. Will the third time be the charm, or will bad things come in threes? There will also be a status report about the Capper redevelopment in general.
There's also apparently a letter being brought by Commissioner Sobelsohn to express the ANC's support for retaining the Nats Express shuttle bus that brings stadium-goers to the neighborhood from the parking lots at RFK. I imagine that the ANC will be expressing some level of concern about increased traffic and parking problems if that shuttle service goes away (it was reported last month that Tommy Wells is in favor of ending it).
The ANC meeting is at 7 pm at St. Augustine's Church at Sixth and M streets, SW.
 
150 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 15
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.