Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


6 Blog Posts Since 2003

Still waiting for the school buses to be removed from the Canal Blocks area. Once they're gone (DC was given 90 days notice about 100 days ago), William C. Smith plans to start clearing the blocks in the spring, with the real construction on the park (including hopefully a "water feature") will begin in the future.

More posts: Canal Park
 

The National Capital Planning Commission has released a preview of a Urban Land Institute Advisory Panel's recommendations for South Capitol Street; the detailed report will be made public at a later date.

More posts: South Capitol St.
 

DC Builds: The Anacostia Waterfront, an exhibit at the National Building Museum, is running from January 17 to May 23. Read also the piece the exhibit and the project by Post architecture critic Benjamin Forgey.

More posts:
 

The Office of Planning has released the completed Anacostia Waterfront Framework Plan, a 20-year blueprint for transforming the areas on both sides of the river, at an estimated cost of at least $8 billion. (12/3 WP article, plus a graphic detailing the plans). See my Other Projects page for more AWI links.

More posts:
 

M Street SE, from the waterfront to the Navy Yard, is included in the "high priority corridors" in the DC Metro system's 10-year expansion plan for light rail or bus rapid transit. Two corridors--from the Anacostia Corridor to the Waterfront Metro station, and from the Silver Spring Metro station to Anacostia--would run along M Street. A three-mile demonstration version will be built in Anacostia in 2004.

More posts: M Street
 

One of the "landmarks" of the old M Street disappeared at some point in the last month--the boarded up gas station on the northwest corner of 3rd and M. Eventually there will be another office building there (250 M Street), but there's no firm construction date yet ("maybe in 2004", according to a William C. Smith rep). (May 2004 update: fences have gone up around the lot, but not for construction--it's been turned into a parking lot, so it doesn't look like they're planning for development anytime soon.)

More posts: M Street, Retail
 




                  © Copyright 2024 JD.