Since January, 2003

Ad by HillAds
 (a random before-and-after moment)
May 27, 2006
November 11, 2012
3rd Place at L, Looking East-Southeast (see more)

Did we say $435 million? We meant $535 million. Or $589 million. Or $714 million, if you watch NBC4 ("New Cost Estimate Jeopardizes Baseball Stadium Plan") or read this morning's Post ("D.C. Baseball Stadium Cost Could Exceed $700 Million") or Washington Times ("D.C. re-evaluates ballpark figure for higher costs"). Or is it really that high? "Officials stressed that the new estimates are preliminary and take into account all potential costs, including $41 million for underground parking, $20 million to upgrade the Navy Yard Metro station and $12 million to rebuild nearby roads. They added that some of the work might not have to be paid for by the city or done at all." Mayoral spokesman Vince Morris disputes the figure: "The $700 million doomsday budget is not ours and does not reflect reality." And as for the city's concession in the lease agreement, the city has agreed to give baseball one-third of parking revenue generated by a new stadium on non-game days. In the meantime, David Catania continues to fight the stadium, by introducing two emergency measures at today's council session: One would slap a $535 million limit on spending to build the stadium, and the second would state that the stadium and related infrastructure improvements can only be paid for by city bonds. UPDATE: AP is reporting that both of Catania's measures failed (votes were 8-5 in favor, but 9 votes are needed for emergency legislation).

 
 More About Nationals Park
 All posts: Nationals Park

JDLand.com Home

Comments

Sorry, comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Recent Comments:  
202_cyclist on A Week of: King Ribs was absolutely the best barbecue in the area but, unfortunately, it wa...
JD on A Week of: "Late November" now the latest on 100 Montaditos. (Forgot to include them in my ...
Daedam on A Week of: JD, any word on when 100 Montaditos will open? As for Willie's, I'm excited tha...
FedInExile on A Week of: Well, I tried Willie's...for $10, I got a diced chicken sandwich about the size ...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
200 B/O M ST SE   THEFT /  10/12/14
200 B/O I ST SE   THEFT /  10/08/14
70 B/O I ST SE   THEFT F/AUTO /  10/08/14
800 B/O L ST SE   BURGLARY /  10/07/14
9TH ST SE AND POTOMAC AVE SE   THEFT F/AUTO /  10/03/14
100 B/O K ST SE   THEFT F/AUTO /  10/03/14

Active Public Space Permits Archive  
1331 2ND ST SE    Carlton Ray 
Assigned
paving; streetfixture; excavation  
 02/10/14
to
02/09/15
1331 4TH ST SE    Forest City Forest City 
Issued
excavation; new  
 01/10/14
to
02/10/15
301 TINGEY ST SE    Potbelly Sandwich Works LLC 
Issued
new  
 03/21/12
to
11/27/14

Recent Issued Building Permits Archive  
1019 4TH ST SE   
10/14/14 
JOHN SHORT
F1500026 / CONSTRUCTION
WE WILL INSTALL AN ORNAMENTAL IRON FENCE IN THE FRONT YARD WITH A GATE. THE FENCE IS 3 FEET HIGH AND THE FENCE WILL BE BLACK IRON. FENCE IS ENTIRELY ON PUBLIC SPACE.
1212 4TH ST SE   
10/16/14 
FC 1212 LLC / PAUL R. JABLONSKI
E1500411 / SUPPLEMENTAL
   
10/16/14 
FC 1212 LLC / ARK SIGN SERVICES INC.; NONE
SG1500034 / CONSTRUCTION
INSTALL ONE WALL MOUNTED ILLUMINATED SIGN.
41 L ST SE   
10/24/14 
BILL CUMMINGS POC FOR WMATA MRP REALTY/CAS RIEGLER / EOIN DURCAN POC FOR SCHNABEL ENGINEERING
SB1400457 / CONSTRUCTION
TEMPORARY GEOTECHNICAL SOIL BORINGS NUMBER OF BORINGS: 3 DEPTH OF BORINGS: 60 FT DRILLING METHOD: 3.25 INCH HOLLOW STEM AUGER HOLE DIAMETER: 5 INCHES WELL ABANDONMENT PROCEDURE: TREMIE GROUTING WITH BENTONITE GROUT
20 M ST SE   
10/17/14 
SOUTHEAST REALTY LLC / DAMON ELLIS; .
SG1400457 / CONSTRUCTION
INSTALLATION OF NEW NON ELECTRIC SIGN 10FT L 1FT 8IN H 3IN W
100 M ST SE   
10/15/14 
NORTHWOOD INVESTERS LLC / STANLEY HUBBARD; NORTHWOOD INVESTERS LLC; STANLEY HUBBARD
E14516088 / SUPPLEMENTAL
   
10/17/14 
WASHINGTON D.C. / GARY MCVEY; WASHINGTON D.C.; GARY MCVEY
E50257566 / SUPPLEMENTAL
901 M ST SE   
10/16/14 
CARLTON RAY
AH1500035 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
1201 M ST SE   
10/14/14 
COMCAST CABLE / MICHAEL SONESEN
AH1500018 / CONSTRUCTION
PLACING INNERDUCT IN EXISTING VERIZON MANHOLES. OCTOBER 9 2014 ? NOVEMBER 9. 2014. 7PM ? 2AM WEEKNIGHTS ? SATURDAYS
   
10/16/14 
CARLTON RAY
AH1500034 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
1000 NEW JERSEY AVE SE   
10/14/14 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / RICHARD G. FINFROCK
P1500331 / SUPPLEMENTAL
1111 NEW JERSEY AVE SE   
10/16/14 
GALLERY CAPITOL RIVERFRONT / THOMAS P MCGUIRE
E1500402 / SUPPLEMENTAL
300 TINGEY ST SE   
10/15/14 
FC BOILERMAKER LLC / BIRKHEAD ELECTRIC INC.; ERIN ANCHOR SIGN INC
SG1500023 / CONSTRUCTION
2-COMMERCIAL SIGN INSTALLATION
301 WATER ST SE   
10/23/14 
FOREST CITY
B1408021 / CONSTRUCTION
REVISION TO B1305741 EXTERIOR SEATING LOAD FROM 188 TO 345 EXTERIOR SEATING CONSIDER AS SUMMER GARDEN ON PRIVATE PROPERTY PER GSA / DC GOV EASMENT.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
CUSHING PL   09/11/14
$ 9,000,000
HALF STREET RESIDENTIAL PJV LLC
 
HALF ST   09/11/14
$ 12,500,000
HALF STREET RESIDENTIAL PJV LLC
 
N ST   09/11/14
$ 12,500,000
HALF STREET RESIDENTIAL PJV LLC
 
CUSHING PL   09/11/14
$ 9,000,000
HALF STREET RESIDENTIAL PJV LLC
 
N ST   09/11/14
$ 12,500,000
HALF STREET RESIDENTIAL PJV LLC
 
N ST   09/11/14
$ 12,500,000
HALF STREET RESIDENTIAL PJV LLC
 
HALF ST   09/11/14
$ 12,500,000
MR BP RESIDENTIAL #1A LLC
 
N ST   09/11/14
$ 12,500,000
MR BP RESIDENTIAL #1A LLC
 
0025 POTOMAC AV   08/08/14
$ 78,486,500
RIVERFRONT HOLDINGS I LLC
 


Project Directory




Blog/Home
Project Directory
Photo Archive
Event Photos
 
Nats Park
Food Map
What's New
History

 
Demolished Buildings
Historic Photos
Satellite Images
Timeline
 
About JDLand
Message JD
Advertise
Photo Use
 
     © Copyright 2014 JD.