After many weeks of teasing, it's now pretty safe to say that the old trash transfer building at 900 New Jersey Ave. SE is really getting demolished. Click to embiggen:
And some before-and-nows show that the eventual new block of I Street between 2nd and New Jersey is starting to be more than just a dream:
If you haven't been following along, this site spent much of the 1900s as a trash transfer station, before the DC Department of Public Works turned it into an operations area for heavy trucks and plows. The block to the north is going to be developed by William C. Smith, starting with the Park Chelsea apartment building, once some deep (deep!) utilities running below the site get relocated. The block between I and K is part of the Capper/Carrollsburg Hope VI redevelopment footprint, and is slated to eventually have a large mixed-income apartment building, though no announcements have been made of when that might actually happen.
I think it's also now safe to declare it Demolished Building #170 since 2003.
If you're already missing the trash transfer station {snort}, here's my galleries from back in June of its interior and exterior, as pre-demolition abatement was underway.
Comments (7)
 
 More Recent News

JDLand.com Home

Comments

Brian says: (10/8/12 8:27 PM)
As a former CHT resident who lived next to that super-inviting facility for two years, this is excellent news. PS - when I visit the old hood these days I don't know what to do with myself without the school buses to orient myself :)


G Street says: (10/9/12 9:19 AM)
Some great captions, esp. on *Interior* photos.


Maelstrom says: (10/9/12 11:51 AM)
May not be worth mentioning since it's not a teardown - but the McDonalds on I is getting a facelift.


JD says: (10/9/12 11:58 AM)
I mentioned in some tidbits post that this McDonald's redo would be coming, the building permits having been approved not too long ago.


PJY03 says: (10/10/12 10:55 AM)
Part of me will miss the building, as its tear down represents the impending loss of my view of the capitol. It is a long-term positive for the neighborhood, even though the construction on that site is going to take years.


Packinblackandred says: (10/11/12 8:20 AM)
@PJY03 I'm in exactly the same position as you--I've tried to focus on the fact that Canal Park will be very nice to look at once we lose the Capitol view.


Maelstrom says: (10/12/12 1:10 PM)
You know, I am really starting to wonder who bothered to dig THAT deep to place those utilities in the first place. Those pits have been open for four or five months now. Anyone know what they're actually moving down there?

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Recent Comments:  
screaminglemur on Frosty Friday Tidbits: With the height restrictions of the new bridge, I imagine that a decomissioned s...
Bruce on Frosty Friday Tidbits: From DCHA: If there are any questions, comments, or concerns please refer neigh...
conngs0 on Frosty Friday Tidbits: Wow. That's about the most anti-climactic ending to that bankruptcy saga I coul...
ZoolanderANDtheBoYz on Frosty Friday Tidbits: Willie owners headquarter is in Delaware. Way to go tax dodgers. I guess they jo...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1300 B/O 4TH ST SE   THEFT
Theft 1 (Theft F/Building)
 03/02/15
70 B/O I ST SE   THEFT
2nd Degree
 03/01/15
100 B/O K ST SE   THEFT F/AUTO
 03/01/15
1000 B/O 5TH ST SE   THEFT F/AUTO
Theft From Auto 1
 02/28/15
400 B/O M ST SE   THEFT
2nd Degree
 02/28/15
100 B/O K ST SE   THEFT F/AUTO
Theft From Auto 1
 02/27/15
1000 B/O 4TH ST SE   THEFT F/AUTO
 02/27/15
100 B/O CANAL ST SE   THEFT
2nd Degree
 02/24/15
1300 B/O 4TH ST SE   THEFT
Theft 1 (Theft F/Building)
 02/19/15
1000 B/O 2ND ST SE   THEFT F/AUTO
 02/18/15
100 B/O K ST SE   THEFT F/AUTO
 02/06/15

Active Public Space Permits Archive  
No records added or modified in the past two weeks.

Recent Issued Building Permits Archive  
1000 5TH ST SE   
02/24/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / KIM MITCHELL CDKM CONSULTING LLC
B1412422 / CONSTRUCTION
NEW BUILDING PERMIT FOR NEW COMMUNITY CENTER INCLUDING STEEL STRUCTURE BRICK AND MASONRY BACKUP
1240 12TH ST SE   
02/19/15 
WASHINGTON GAS LIGHT CO / CARLTON W ROBINSON
E1503465 / SUPPLEMENTAL
909 HALF ST SE   
02/25/15 
23 I LLC C/O RELATED COMPANIES / DAVID MILLER
SB1500157 / CONSTRUCTION
INSTALLATION AND MONITORING OF 8 INCLINOMETER MONITORING SYSTEMS. THREE INCLINOMETER CASINGS TO BE INSTALLED ALONG THE K STREET BORDER OF THE PROJECT. THREE CASINGS TO BE INSTALLED ALONG THE I STREET BORDER OF THE PROJECT. TWO CASINGS TO BE INSTALLED ALONG THE HALF STREET BORDER OF THE PROJECT.
   
02/23/15 
23 I LLC C/O RELATED COMPANIES / 23 I LLC C/O RELATED COMPANIES; ANDREW DANCE
SB1500132 / CONSTRUCTION
A HOLLOW STEM AUGER WILL INSTALL UP TO 30 TEMPORARY DEWATERING WELLS BY ADVANCING A 12 OD / 8 1 / 4 ID BOREHOLE TO A DEPTH OF 65 FEET. AT DEPTH A 4 INCH PVC FLUSH JOINT THREADED WELL ASSEMBLY WILL BE SET AND SELECT FILTER PLACED. INTO EACH WELL WILL BE INSTALLED A 1 HP TURBINE SUBMERSIBLE PUMP. EFFLUENT WILL BE DIRECTED THROUGH A COMMON MANIFOLD TO A BAFFLED SETTLING TANK AND DISCHARGED TO THE LO...
   
03/03/15 
23 I LLC C/O RELATED COMPANIES / JOHN DIEHL ECC INC.
UT1500019 / CONSTRUCTION
REMOVAL OF THREE UNDERGROUND STORAGE TANKS ENCOUNTERED DURING EXCAVATION FOR REDEVELOPMENT ACTIVITIES. ONE 1 000-GALLON HEATING OIL TANK ONE 1 000-GALLON KEROSENE TANK AND ONE 500-GALLON OIL / WATER SEPARATOR.
1015 HALF ST SE   
02/18/15 
HALF ST SE LLC / STEPHEN R. HOLMAN
P1503532 / SUPPLEMENTAL
   
03/02/15 
HALF ST SE LLC / MATT LOSIGNOR
P1503861 / SUPPLEMENTAL
50 M ST SE   
02/18/15 
ENGLEWOOD LLC / FVI2020
FD1500010 / CONSTRUCTION
FOUNDATION OF GRADE RELATED TO CONSTRUCTION OF A NEW HOTEL
55 M ST SE   
02/24/15 
HINES GLOBAL REIT 55 M STREET LLC / ANDREW P CARAYIANNIS
M1501184 / SUPPLEMENTAL
100 M ST SE   
02/13/15 
SQUARE 743 INC / RONNIE E WRIGHT
E1503331 / SUPPLEMENTAL
   
02/13/15 
SQUARE 743 INC / DAVID FLEMING
P1503495 / SUPPLEMENTAL
   
02/19/15 
SQUARE 743 INC / DAVID FLEMING
P1503597 / SUPPLEMENTAL
   
02/20/15 
SQUARE 743 INC / GREGORY E LIGON
E1503498 / SUPPLEMENTAL
   
02/23/15 
SQUARE 743 INC / ANTHONY G SAMBURG
E1503518 / SUPPLEMENTAL
901 M ST SE   
02/19/15 
US GOVERNMENT NAVY PWC / SUMMIT CONSTRUCTION AND ES
B1504570 / CONSTRUCTION
REQUEST AND E&S PERMIT FOR WORK ON FEDERAL INSTALLATION. INSTALLING FOOTINGS AND SLAB WITH PORTCH SUPPORTS. MINOR GRADING AND SEEDING. BUILDING FOOTPRINT IS UNDER 700SF. LAND DISTURBANCE INCLUDING GRADING AND SEEDING IS UNDER 2 500SF.
100 M ST SE   
02/19/15 
SQUARE 743 INC / JOHN H THOMSON
E1503464 / SUPPLEMENTAL
   
02/20/15 
SQUARE 743 INC / DAVID RAINE; SQUARE 743 INC; DAVID RAINE
P38575591 / SUPPLEMENTAL
800 NEW JERSEY AVE SE   
02/24/15 
NEW JERSEY AT H LLC / JOHN H THOMSON
E1503556 / SUPPLEMENTAL
   
02/13/15 
BAKER DC / CHRISTINE LONG
AH1500246 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 7:00PM THRU 7:00AM
909 NEW JERSEY AVE SE   
02/26/15 
909 NEW JERSEY AVENUE ACQUISITION LLC / DAVID L. HAHN
P1503815 / SUPPLEMENTAL
1000 NEW JERSEY AVE SE   
02/23/15 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / SHAWN ALEX HELLER
HO1500118 / HOME OCCUPATION
HOME OFFICE (LAW OFFICE).
25 POTOMAC AVE SE   
03/03/15 
RIVERFRONT HOLDINGS I LLC /
P1503907 / SUPPLEMENTAL
1500 SOUTH CAPITOL ST SE   
03/02/15 
WASHINGTON NATIONALS STADIUM LLC / MATT LOSIGNOR
P1503862 / SUPPLEMENTAL
   
03/03/15 
NATIONALS PARK / KEVIN HOOVER; NATIONALS PARK; KEVIN HOOVER
E21362502 / SUPPLEMENTAL
300 TINGEY ST SE   
02/13/15 
RICHARD CERVERA / NATHANIEL GILL
B1504014 / CONSTRUCTION
NEW SUMMER GARDEN
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;