Since January, 2003
 (a random before-and-after moment)
October 1, 2005
January 8, 2012
South Capitol at Potomac, Looking East (see more)

It may still be a number of months before Bluejacket Brewery opens on the eastern end of the Boilermaker Shops in the Yards, but that's not stopping owner Greg Engert and brewer Megan Parisi from getting a head start on the beers that will be offered at the new restaurant. So, tomorrow (Wednesday, Aug. 1) at 6 pm, Bluejacket's first five beers will be unveiled in an event at sibling ChurchKey.
If you go to the ChurchKey web site and then click on Events (come on, people, direct links!), you'll see hints about the lineup, which are mainly "mashups" created in collaboration with other breweries around the US, but also includes Sidewalk Saison, Bluejacket's first solo brew. (via WaPo)
It's expected that Bluejacket itself will open in early 2013.
UPDATE: At the risk of not being 1 billion percent accurate, I'll draw attention to the fact that two of the beers have already been "released" (Snack Attack and the Black Berliner Techno Weiss) and three are new, with Sidewalk Saison being the only one that is completely Bluejacket's own creation. But since ChurchKey also bills the event on its own web site as "World Premier: Bluejacket 5 Drafts Unveiled," you can just pick which part of "Premier" and "Unveiled" you'd like to focus on.
UPDATE II: More on the brews from WCP/Young & Hungry.
Comments (4)
 
 More About The Yards

JDLand.com Home

Comments

rdotis says: (7/31/12 2:23 PM)
This place is certainly going to delay walking home from ball games. Hope they have outdoor seating.


JD says: (7/31/12 2:26 PM)
Yes, I believe they're going to have seating on the patio on the south side of the building, at the 4th and Tingey intersection.


Alan says: (8/1/12 2:51 PM)
Their Snack Attack beer was the most unique beer I've ever had...and one of the most delicious. Here's hoping it becomes a staple at the new place, although you can't really have more than one or two in a sitting because of the sweeter taste.


JES says: (8/2/12 8:27 AM)
Checked it out last night. The Sidewalk Saison was excellent, and the others weren't too shabby either. Now they just need to open already!

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Recent Comments:  
JD on Brew Garden, Park: The west side of the current Douglass Bridge is actually on Florida Rock propert...
Tom on Brew Garden, Park: I don't recall anything about having to build the bridge first. Maybe I missed t...
JD on Tuesday Tidbits: Coffee mug? Mousepad? Needlepoint pillow? :-)
Blue on Tuesday Tidbits: This is great JD! I would buy one, but I'm just not a fan of printed t-shirts. ...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1300 B/O 4TH ST SE   THEFT
Theft 1 (Theft F/Building)
 03/02/15
70 B/O I ST SE   THEFT
2nd Degree
 03/01/15
100 B/O K ST SE   THEFT F/AUTO
 03/01/15
1000 B/O 5TH ST SE   THEFT F/AUTO
Theft From Auto 1
 02/28/15
400 B/O M ST SE   THEFT
2nd Degree
 02/28/15
100 B/O K ST SE   THEFT F/AUTO
Theft From Auto 1
 02/27/15
1000 B/O 4TH ST SE   THEFT F/AUTO
 02/27/15
100 B/O CANAL ST SE   THEFT
2nd Degree
 02/24/15
1300 B/O 4TH ST SE   THEFT
Theft 1 (Theft F/Building)
 02/19/15
1000 B/O 2ND ST SE   THEFT F/AUTO
 02/18/15
100 B/O K ST SE   THEFT F/AUTO
 02/06/15

Active Public Space Permits Archive  
No records added or modified in the past two weeks.

Recent Issued Building Permits Archive  
1000 5TH ST SE   
02/24/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / KIM MITCHELL CDKM CONSULTING LLC
B1412422 / CONSTRUCTION
NEW BUILDING PERMIT FOR NEW COMMUNITY CENTER INCLUDING STEEL STRUCTURE BRICK AND MASONRY BACKUP
1240 12TH ST SE   
02/19/15 
WASHINGTON GAS LIGHT CO / CARLTON W ROBINSON
E1503465 / SUPPLEMENTAL
909 HALF ST SE   
02/25/15 
23 I LLC C/O RELATED COMPANIES / DAVID MILLER
SB1500157 / CONSTRUCTION
INSTALLATION AND MONITORING OF 8 INCLINOMETER MONITORING SYSTEMS. THREE INCLINOMETER CASINGS TO BE INSTALLED ALONG THE K STREET BORDER OF THE PROJECT. THREE CASINGS TO BE INSTALLED ALONG THE I STREET BORDER OF THE PROJECT. TWO CASINGS TO BE INSTALLED ALONG THE HALF STREET BORDER OF THE PROJECT.
   
02/23/15 
23 I LLC C/O RELATED COMPANIES / 23 I LLC C/O RELATED COMPANIES; ANDREW DANCE
SB1500132 / CONSTRUCTION
A HOLLOW STEM AUGER WILL INSTALL UP TO 30 TEMPORARY DEWATERING WELLS BY ADVANCING A 12 OD / 8 1 / 4 ID BOREHOLE TO A DEPTH OF 65 FEET. AT DEPTH A 4 INCH PVC FLUSH JOINT THREADED WELL ASSEMBLY WILL BE SET AND SELECT FILTER PLACED. INTO EACH WELL WILL BE INSTALLED A 1 HP TURBINE SUBMERSIBLE PUMP. EFFLUENT WILL BE DIRECTED THROUGH A COMMON MANIFOLD TO A BAFFLED SETTLING TANK AND DISCHARGED TO THE LO...
   
03/03/15 
23 I LLC C/O RELATED COMPANIES / JOHN DIEHL ECC INC.
UT1500019 / CONSTRUCTION
REMOVAL OF THREE UNDERGROUND STORAGE TANKS ENCOUNTERED DURING EXCAVATION FOR REDEVELOPMENT ACTIVITIES. ONE 1 000-GALLON HEATING OIL TANK ONE 1 000-GALLON KEROSENE TANK AND ONE 500-GALLON OIL / WATER SEPARATOR.
1015 HALF ST SE   
02/18/15 
HALF ST SE LLC / STEPHEN R. HOLMAN
P1503532 / SUPPLEMENTAL
   
03/02/15 
HALF ST SE LLC / MATT LOSIGNOR
P1503861 / SUPPLEMENTAL
50 M ST SE   
02/18/15 
ENGLEWOOD LLC / FVI2020
FD1500010 / CONSTRUCTION
FOUNDATION OF GRADE RELATED TO CONSTRUCTION OF A NEW HOTEL
55 M ST SE   
02/24/15 
HINES GLOBAL REIT 55 M STREET LLC / ANDREW P CARAYIANNIS
M1501184 / SUPPLEMENTAL
100 M ST SE   
02/13/15 
SQUARE 743 INC / RONNIE E WRIGHT
E1503331 / SUPPLEMENTAL
   
02/13/15 
SQUARE 743 INC / DAVID FLEMING
P1503495 / SUPPLEMENTAL
   
02/19/15 
SQUARE 743 INC / DAVID FLEMING
P1503597 / SUPPLEMENTAL
   
02/20/15 
SQUARE 743 INC / GREGORY E LIGON
E1503498 / SUPPLEMENTAL
   
02/23/15 
SQUARE 743 INC / ANTHONY G SAMBURG
E1503518 / SUPPLEMENTAL
901 M ST SE   
02/19/15 
US GOVERNMENT NAVY PWC / SUMMIT CONSTRUCTION AND ES
B1504570 / CONSTRUCTION
REQUEST AND E&S PERMIT FOR WORK ON FEDERAL INSTALLATION. INSTALLING FOOTINGS AND SLAB WITH PORTCH SUPPORTS. MINOR GRADING AND SEEDING. BUILDING FOOTPRINT IS UNDER 700SF. LAND DISTURBANCE INCLUDING GRADING AND SEEDING IS UNDER 2 500SF.
100 M ST SE   
02/19/15 
SQUARE 743 INC / JOHN H THOMSON
E1503464 / SUPPLEMENTAL
   
02/20/15 
SQUARE 743 INC / DAVID RAINE; SQUARE 743 INC; DAVID RAINE
P38575591 / SUPPLEMENTAL
800 NEW JERSEY AVE SE   
02/24/15 
NEW JERSEY AT H LLC / JOHN H THOMSON
E1503556 / SUPPLEMENTAL
   
02/13/15 
BAKER DC / CHRISTINE LONG
AH1500246 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 7:00PM THRU 7:00AM
909 NEW JERSEY AVE SE   
02/26/15 
909 NEW JERSEY AVENUE ACQUISITION LLC / DAVID L. HAHN
P1503815 / SUPPLEMENTAL
1000 NEW JERSEY AVE SE   
02/23/15 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / SHAWN ALEX HELLER
HO1500118 / HOME OCCUPATION
HOME OFFICE (LAW OFFICE).
25 POTOMAC AVE SE   
03/03/15 
RIVERFRONT HOLDINGS I LLC /
P1503907 / SUPPLEMENTAL
1500 SOUTH CAPITOL ST SE   
03/02/15 
WASHINGTON NATIONALS STADIUM LLC / MATT LOSIGNOR
P1503862 / SUPPLEMENTAL
   
03/03/15 
NATIONALS PARK / KEVIN HOOVER; NATIONALS PARK; KEVIN HOOVER
E21362502 / SUPPLEMENTAL
300 TINGEY ST SE   
02/13/15 
RICHARD CERVERA / NATHANIEL GILL
B1504014 / CONSTRUCTION
NEW SUMMER GARDEN
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




     © Copyright 2015 JD.