Since January, 2003

Ad by HillAds
 (a random before-and-after moment)
November 11, 2004
June 25, 2009
4th at L, Looking East (see more)

A slew of tidbits, some already tweeted, some not:
* The third Truckeroo food truck festival is now scheduled for next Friday, Aug. 12, from 11 am to 11 pm. They'll keep doing them monthly, through October.
* This isn't news for anyone who's seen the big holes punched in the sides, but work on the Boilermaker Shops retail space at the Yards is finally underway. It's expected to take about a year. This is where the new brewpub by the Churchkey folks will be, along with Buzz Bakery, Austin Grill Express, BRB, and Huey's 24-7 diner.
* Along with their announcement of a new Circulator route that will run from east of the river across the 11th Street Bridge and up 8th St. SE over to Potomac Avenue, DDOT has also announced that the Navy Yard Circulator route will no longer go into the Union Station garage. Instead, it will stop at a new location near the flagpoles in front of the building. There won't be any stop at Louisiana and D anymore, either. (See the DDOT presentation posted by DCist for the details, with the Navy Yard route stuff being on page 7.)
* The Capitol Hill Day School's blog is doing a good job keeping track not only of the renovation work at Dent School, but also on the progress on their temporary location at 5th and K, SE. The modular classrooms are arriving, plus there's now power!
* For people who don't stay glued to comment threads (for shame!), ANC commissioner David Garber recently posted with more details about the Georgetown University Health Disparities office moving into the retail space at Capitol Hill Tower: "I was reassured that this will not be a health clinic, and that it is better to think of it as the research center's "home base" on this side of the city. It will mostly be office space, and employees will spend most of their time outside the office at sites in Wards 6, 7, and 8, facilitating research on environmental health, obesity, and breast cancer research. I was told that no more than five clients would be visiting the office each day -- not as a medical clinic-- but that the space would likely also be used to hold meetings for the center's organizational and community-based task forces/committees."
* The Hill is Home gives an update on the 8th Street underpass, where a mural is about to be created to spiff up the space, and where the public parking lot is going to get new signage, lighting, and pricing to encourage Barracks Row visitors to use it.
* President Obama gave a big speech on jobs at the Navy Yard this morning, which will be notable mostly for how my Google News Alert for "washington navy yard" will take days to get back to normal.
There's probably more than this, but this has already cut into that mini-break I was trying to take....
Comments (3)
 
 More About Akridge/Half St.

JDLand.com Home

Comments

loonlaugh says: (8/6/11 9:15 PM)
Has the Circulator route change actually been announced? The DCist article is still showing it as a proposal and the Circulator website is also still discussing losing LA Ave and D St stops as a proposal. I have completed the survey, emailed, called and even spoken with supervisors hanging around the bus stops in their little white circulator cars in an effort to save those two stops. Seems like the Navy Yard route change was buried in the East of the River proposal and so many residents and riders likely missed the proposed change.

Is there any way to keep these stops? There are always people getting off and on with me at the LA Ave stop, at all hours of the day.

Save our stop!,
Kc


F says: (8/7/11 9:20 PM)
Another tidbit: Portions of the Canal Park pavillion are starting to poke above ground.


F says: (8/24/11 8:49 PM)
Vertical construction has started on the next block of Capitol Quarter homes.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Recent Comments:  
ZoolanderANDtheBoYz on VIDA Fitness Now: Does this mean 1212 is fully leased?
JD on Oct. 6 DC: They ought to announce a lineup of food trucks outside the door.
G Street on Oct. 6 DC: How many hours are budgeted for this event? (-: "Van Ness School and DCPS...
JD on The Latest from: @Gamble--At first I was trying to decide why you were babysitting for your neigh...
JD on Fence Peeking, Part: I have no news on Willie's, though will post as soon as I hear. You just have to...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1100 B/O 10TH ST SE   THEFT F/AUTO /  09/08/14
400 B/O K ST SE   THEFT F/AUTO /  09/08/14
1000 B/O 4TH ST SE   THEFT F/AUTO /  09/05/14
300 B/O M ST SE   ROBBERY /  09/03/14
900 B/O 1ST ST SE   THEFT F/AUTO /  09/03/14
1000 B/O 1ST ST SE   THEFT /  09/03/14
1200 B/O 4TH ST SE   THEFT F/AUTO /  09/02/14
200 B/O M ST SE   THEFT /  09/02/14
300 B/O M ST SE   THEFT /  09/02/14
1100 B/O NEW JERSEY AVE SE   THEFT /  09/01/14

Active Public Space Permits Archive  
1331 2ND ST SE    Carlton Ray 
Assigned
paving; streetfixture; excavation  
 02/10/14
to
02/09/15
1331 4TH ST SE    Forest City Forest City 
Issued
excavation; new  
 01/10/14
to
02/10/15
301 TINGEY ST SE    Potbelly Sandwich Works LLC 
Issued
new  
 03/21/12
to
11/27/14

Recent Issued Building Permits Archive  
1259 1ST ST SE   
09/24/14 
CAPITAL RIVERFRONT HOTEL LLC / CAPITAL RIVERFR LLC; KIM MITCHELL CDKM CONSULTING LLC
AH1400705 / CONSTRUCTION
AFTER HOURS FOR PERMIT NO B1401471 - MONDAY THRU SATURDAY FROM 5 AM TO 7 PM - SEPT 30 THRU OCTOBER 29
1265 1ST ST SE   
09/22/14 
CAPITAL RIVERFRONT HOTEL LLC / CYNTHIA H LOPEZ
M1403317 / SUPPLEMENTAL
1212 4TH ST SE   
09/23/14 
THE YARDS
TL1400136 / CONSTRUCTION
FIRST TIME TENANT LAYOUT RELATED TO THE CONSTRUCTION OF A NEW PET VETERINARY BOARDING HOSPITAL AND VET USES PER ZC ORDER 13 THRU 15 AND AMENDMENT TO SECTION 1803.16 TO ALLOW PROPOSED USE IN THE SEFC CR DISTRICT MINOR ARCHITECURAL MECHANICAL PLUMBING ELECTRICAL AND FIRE LIFE SAFTEY WORK AS PER PLANS.
   
09/24/14 
THE YARDS / MIKE WHITE; THE YARDS; KENNETH G. JOHNSON
P13190284 / SUPPLEMENTAL
   
09/25/14 
FC 1212 LLC / TERRY L BOETTNER
M1403366 / SUPPLEMENTAL
   
09/25/14 
FC 1212 LLC /
P1408863 / SUPPLEMENTAL
   
09/26/14 
THE YARDS / ANTHONY HARRIS; THE YARDS; ANTHONY HARRIS
E68185255 / SUPPLEMENTAL
   
09/30/14 
FOREST CITY LLC / FRED GRIFFITH; FOREST CITY LLC; JAY LIVESAY
E74701637 / SUPPLEMENTAL
1103 9TH ST SE   
09/16/14 
ICP PARTNERS POTOMAC 810 LLC / FRANKLIN T GAINES
P1408621 / SUPPLEMENTAL
1220 12TH ST SE   
09/18/14 
WASHINGTON GAS LIGHT CO / GREGORY E LIGON
E1409179 / SUPPLEMENTAL
   
09/19/14 
WASHINGTON GAS LIGHT CO / JAMES C. GYURAS
E1409204 / SUPPLEMENTAL
   
09/19/14 
WASHINGTON GAS LIGHT CO / JAMES C. GYURAS
E1409203 / SUPPLEMENTAL
   
09/22/14 
WASHINGTON GAS LIGHT COMPANY / RICHARD COLLINS; WASHINGTON GAS LIGHT COMPANY; ROBERT DIKE
E34340973 / SUPPLEMENTAL
601 L ST SE   
09/16/14 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / EDUARDO L. LOPEZ
E1409105 / SUPPLEMENTAL
   
09/18/14 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / RICHARD V CAREY
P1408678 / SUPPLEMENTAL
718 L ST SE   
09/22/14 
ALAN GAUNOUX G PROPERTIES
B1402025 / CONSTRUCTION
EXTERIOR WORK AT REAR OF PROPERTY ONLY. NO WORK ON FRONT FACADE REPAIR EXTERIOR BRICK AND POINT BRICK JOINTS AT REAR
20 M ST SE   
09/19/14 
SOUTHEAST REALTY LLC / MATT LOSIGNOR
P1408704 / SUPPLEMENTAL
   
09/19/14 
SOUTHEAST REALTY LLC / MATT LOSIGNOR
P1408703 / SUPPLEMENTAL
   
09/26/14 
SOUTH EAST REALTY LLC SOUTH EAST REALTY LLC / ADOLPHUS SIMMONS; SOUTH EAST REAL SOUTH EAST REALTY LLC; ADOLPHUS SIMMONS
P92093458 / SUPPLEMENTAL
55 M ST SE   
09/11/14 
HINES GLOBAL REIT 55 M STREET LLC / DANIEL O WHITE
E1408953 / SUPPLEMENTAL
100 M ST SE   
09/15/14 
SQUARE 743 INC. / SAM HOLLEN RAMCO OF DC INC.
TL1400150 / CONSTRUCTION
INTERIOR TENANT LAYOUT OF 6TH FLOOR OFFICE SPACE. PARTITIONS FURNITURE MEP AND LIFE SAFETY. REGUS 2429
   
09/20/14 
SQUARE 743 INC SQUARE 743 INC / KATE MITCHELL; SQUARE 743 INC SQUARE 743 INC; ROBERT HUNTER
AR53284155 / SUPPLEMENTAL
   
09/25/14 
SQUARE 743 INC / BERNARD D SASSER
E1409418 / SUPPLEMENTAL
   
09/29/14 
SQUARE 743 INC. 100 M ST SE / PAUL THIEBERGER; SQUARE 743 INC 100 M ST SE; PAUL THIEBERGER
P83348948 / SUPPLEMENTAL
901 M ST SE   
09/12/14 
CARLTON RAY
AH1400687 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
1201 M ST SE   
09/12/14 
CARLTON RAY
AH1400686 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
800 NEW JERSEY AVE SE   
09/17/14 
NEW JERSEY AT H LLC / COLIN CLARK
B1408553 / CONSTRUCTION
CONSTRUCTION OF A 11 STORY 336 UNIT APARTMENT BUILDING WITH FIRST FLOOR RETAIL AND THREE BELOW GRADE LEVELS FOR PARKING GARAGE PER BZA # 18619 GRANTED ON 9 / 24 / 13 WITH CONDITION: SCREENING OF THE PARKING ADJACENT TO H ST.--- SPECIFICALLY SHEETS 6 AND 7 OF EXHIBIT 23 - PLANS TO INCLUDE MECHANICAL PLUMBING AND ELECTRICAL WORK.
880 NEW JERSEY AVE SE   
09/25/14 
880 NEW JERSEY AVENUE LLC / JOHN H THOMSON
E1409407 / SUPPLEMENTAL
25 POTOMAC AVE SE   
09/26/14 
KEVIN SCHAAR MRP RESIDENTIAL / GEORGE KING MORETRENCH AMERICAN CORP
SB1400408 / CONSTRUCTION
DRILL AND INSTALL 106- 2 INCH WELLPOINTS IN 6 INCH BOREHOLE 25 FEET BAGS 4- 6 INCH WELLS IN 12 INCH BOREHOLE 40 FEET BAGS AND 2- 2 INCH OBSERVATION WELLS IN 6 INCH BOREHOLE 20 FEET BAGS. WELLPOINTS DRILLED BY DUAL-ROTERY USING CLEAN WATER. WELLS DRILLLED BY MUD-ROTARY DRILLING. SEE PROVIDED MORETRENCH WORK PLAN AND DRILLING SUMMARY."
300 TINGEY ST SE   
09/11/14 
FC BOILERMAKER LLC / CHRIS WING
B1407179 / CONSTRUCTION
INTERIOR ALTERATION FOR NEW UNLEASHED BY PETCO STORE.
   
09/13/14 
FC BOILERMAKER LIC FC BOILERMAKER LIC / DENNIS STUBBS; FC BOILERMAKER FC BOILERMAKER LIC; DENNIS STUBBS
P24303627 / SUPPLEMENTAL
   
09/18/14 
FC BOILERMAKER LLC /
P1408685 / SUPPLEMENTAL
   
09/18/14 
CHRIS WING / SHANDI COBB; CHRIS WING; CHARLES CLYNES
AR65033933 / SUPPLEMENTAL
   
09/25/14 
FC BOILERMAKER LLC / LOUIS N ROBINSON
E1409412 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




Blog/Home
Project Directory
Photo Archive
Event Photos
 
Nats Park
Food Map
What's New
History

 
Demolished Buildings
Historic Photos
Satellite Images
Timeline
 
About JDLand
Message JD
Advertise
Photo Use
 
     © Copyright 2014 JD.