Since January, 2003

Ad by Google
 (a random before-and-after moment)
January 19, 2003
April 8, 2012
3rd at M, Looking South (see more)

A few bullet points to pass along on this lovely day (man, I wish I was in Minneapolis right now):
* I took a few photos (belatedly) of the newly installed stainless steel baseballs hung this week on the Nationals Park garages on N Street. You can see a hint of the red and blue LED lights that will "activate" the balls, though I imagine it will be more impressive when it's dark out. (Also, if you're as desperate in your Christmas shopping as I am, remember that the Nats Team Store at Half and N is open from 11 am to 5 pm every day except Sunday.)
* A reader reported this morning that the fences have been taken down around the all-but-completed 1015 Half Street office building, on the site of the old Nation nightclub. Douglas Wilson Companies, which took over the project when Opus East went belly up, had said when construction restarted in May that they would deliver 1015 Half by the end of the year, and they seem to have basically hit that date. No announcement of any tenants for the 440,000-square-foot building, though.
* The ANC 6D meeting is on Monday at 7 pm at St. Augustine's church at 6th and M streets, SW, but, as of now, no agenda has been posted. I'm sure it'll be a wonderful holiday potpourri of topics, though. (The agenda for Tuesday's ANC 6B meeting has been up for quite a while, and includes the new beer garden at 8th and L.)
* A reader passed along this DCMud piece trying to play up movement on Akridge's Half Street project (just north of the ballpark), but I see a lot of "expects" and "luck" and "hope to" rather than any concrete start dates, and so, to me, that means there's really no news of impending construction. The fact that the Bullpen has apparently gotten it's lease renewed for the 2011 season would point to Akridge not expecting to do any work before fall. (And I'd also note that the first sentence gets everything wrong about the disposition of the Southeastern Bus Garage site, as is so often the case with DCMud items on Near Southeast: Akridge was the winning bid for the entire bus garage site in 2007, while Monument [which itself is not bankrupt, though its financial backer Lehman Brothers did croak] had earlier gotten the Metro station entrance on the other side of the street. Monument had owned land south of the bus garage, on the Bullpen site, but then sold that to Akridge in 2008.) The post also gives some background on the project, which might be new for people who haven't been following along, but which is basically what Akridge has been saying since they first unveiled the project two years ago.
You can see my Akridge Half Street project page for all of the details and renderings of the 700,000-square-foot office/residential/retail project, or, heck, read the zoning hearing transcript from January 2009. I think new residents will be happy about Akridge's long-mentioned plans for the "stall"-like vending area along the "Via" as well as a "neighborhood retail" feel for the Van Street side of the project, though people will probably be even happier about that once they know the project is actually going to start....
Comments (0)
 
 More Recent News

JDLand.com Home

Comments

C says: (12/12/10 12:12 PM)
Found the DC Mud piece informative and necessarily hopeful in today's market - renderings of prospective half street buildings are beautiful and the plans for retail and other spaces for locals terrific.

Stainless baseballs are impressive close up and though it will make the once "temporary" garages more permanent, they do a nice job sprucing up the street.

BID's holiday market starts 14 December.

Prediction, canal park "construction" to begin in January.


JD says: (12/12/10 1:04 PM)
Of course you see "necessarily hopeful" prose in a DCMud post--they're real estate professionals. No one should be under any illusions that they are objective observers.


C says: (12/13/10 1:04 PM)
the sensitivity around here is fun...so I will contribute

may we then man up and admit canal park is moving forward or is it practice to allow musings to remain when facts fail to support


G Street says: (12/13/10 3:56 PM)
Re: shiny objects = "It's art if I say it's art."

I still think they should have cartoonish versions of *the monuments* (Lincoln, Jefferson, Washington, etc.) throughout the stadium, but then I wasn't consulted about this.


arm says: (12/13/10 6:11 PM)
The baseballs look almost like Christmas decorations to me.


MJM says: (12/14/10 10:27 AM)
@ C - is it gonna "re-start" in Jan? Didn't you post that Canal park survived the budget axe or was that someone else - can't remember? Hope it starts soon.

At least there are outward visible signs of 'construction' on 220 I St/225 Va Ave or so the new 'windows' would indicate there is something going on inside for the last few weeks....


C says: (12/14/10 1:41 PM)
I confirmed via three high-level sources with direct knowledge of the project that it is not included on the list of projects frozen by the new mayor.

I also heard that we should begin to see physical construction beginning in January at the latest. But knowing how much this project has slipped the past few years, I cannot gaurantee it?

I do think there has been sufficient investment in this project between design, infrastructure work, removal of the buses, sodding the lots and its play as the centerpiece of the hood that its eventual completion is inevitable. But I will celebrate with many others when we see signficant work underway.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Recent Comments:  
JD on The Big Stick: There is a door into the Stick from its Half Street frontage.
Whatevs on The Big Stick: Technically, there still isn't a restaurant on Half St. SE since the formal addr...
JD on The Big Stick: Mr. JDLand and I did go--I had the polish sausage and he had the half smoke, and...
JES on The Big Stick: JD, I saw some menu pics on twitter. Did you go? How was it?



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
200 B/O I ST SE   THEFT F/AUTO
 12/18/14
700 B/O L ST SE   THEFT
2nd Degree
 12/17/14
1200 B/O 1ST ST SE   THEFT
Theft F/Building
 12/08/14
1200 B/O 1ST ST SE   THEFT
 11/21/14
900 B/O 5TH ST SE   BURGLARY
 11/21/14
200 B/O I ST SE   THEFT
 11/21/14
1200 B/O NEW JERSEY AVE SE   THEFT
 11/20/14

Active Public Space Permits Archive  
1331 2ND ST SE    Carlton Ray 
Assigned
paving; streetfixture; excavation  
 02/10/14
to
02/09/15
1331 4TH ST SE    Forest City Forest City 
Issued
excavation; new  
 01/10/14
to
02/10/15

Recent Issued Building Permits Archive  
1025 1ST ST SE   
12/03/14 
NA NA NA
EHOP1590134 / HOME OCCUPATION
   
12/10/14 
KAREN NZAKIMUENA
PC74349112 / POST CARD
INSTALLATION OF NOT MORE THAN 1 NEW AIR CONDITIONING UNIT UP TO A MAXIMUM OF 10-TONS OF EQUIVALENT REFRIGERATING EFFECT.
1016 3RD ST SE   
12/15/14 
ANAMARIA R MOTTOLA / DIXON
B1502438 / CONSTRUCTION
RENOVATIONS MINOR MEP
1212 4TH ST SE   
12/10/14 
FC 1212 LLC / SCHINDLER ELEVATOR CORP
ER1500593 / SHOP DRAWING
REPLACE MAXTON UC2A VALVE EST. COST OF WORK $ 2 2120. 00
927 5TH ST SE   
12/15/14 
AARON LORENZO
PC25919394 / POST CARD
REPLACEMENT IN KIND OF EXISTING FENCE ON PRIVATE PROPERTY. REPLACEMENT IN KIND WHEN APPLIED TO ARCHITECTURAL FEATURES MEANS REPLACEMENT WITH A FEATURE OF LIKE MATERIAL THAT REPLICATES THE EXISTING FEATURE IN PROPORTION APPEARANCE TEXTURE DESIGN DETAIL AND DIMENSIONS.
1000 5TH ST SE   
12/04/14 
UNITED STATES OF AMERICA / WALTER T JONES
E1501598 / SUPPLEMENTAL
1015 HALF ST SE   
12/10/14 
HALF STREET LLC / ART DISPLAY; BOB BIROONAK ART DISPLAY CO.
SG1400465 / CONSTRUCTION
ONE ILLUMINATED NEWS TICKER SIGN
1201 HALF ST SE   
12/10/14 
WEST HALF 1 LLC / MARK W GIBSON
E1501746 / SUPPLEMENTAL
   
12/12/14 
JASON YORK
TN1500036 / CONSTRUCTION
INSTALLING SMALL TENT ON DEC 29 2014 FOR THE BRIDGESTONE WINTER CLASSIC ON 1-1-15 WITH GENERATOR TENTS REMOVED ON 1-2-15
808 L ST SE   
12/10/14 
NAVY YARD ASSOCIATES LLC / KE-MAURELLE PREDDIE
B1412006 / CONSTRUCTION
NEW OFFICE USE FOR 1254 SQ. FT. EXISTING TWO STORIES PLUS BASEMENT STRUCTURE ON SE / C-3-A ZONING DISTRICT. MECHANICAL ELECTRICAL AND PLUMBING REMAIN AS IS.
80 M ST SE   
12/10/14 
WELLS REIT II 80 M STREET LLC / ANTHONY G SAMBURG
E1501724 / SUPPLEMENTAL
14 M ST SE   
12/16/14 
ROMAN CATHOLIC ARCHBISHOP OF WASHINGTON / PHILLIP B. MOBLEY
FB1500047 / SUPPLEMENTAL
20 M ST SE   
12/04/14 
TRANSWESTERN JEFFREY GROSS / OLLIE READ; TRANSWESTERN JEFFREY GROSS; CHRISTOPHER SCHULZE
AR66514546 / SUPPLEMENTAL
   
12/04/14 
TRANSWESTERN JEFFERY W GROSS / ANDREW ARNTSON; TRANSWESTERN JEFFERY W GROSS; ANDREW ARNTSON
P96600069 / SUPPLEMENTAL
80 M ST SE   
12/03/14 
MARY JACKSON
PC44081129 / POST CARD
REPLACEMENT OF NOT MORE THAN 1 GAS APPLIANCE ON A RESIDENTIAL COMMERCIAL OR INDUSTRIAL PROJECT.
   
12/05/14 
WELLS REIT II 80 M STREET LLC /
P1501746 / SUPPLEMENTAL
100 M ST SE   
12/03/14 
SQUARE 743 INC. / SAM HOLLEN RAMCO OF DC INC.
B1502037 / CONSTRUCTION
INTERIOR RENOVATION TO 4TH FLOOR OFFICE SPACE. SUBDIVIDE TENANT SPACE AND ADD PANTRY. PARTITIONS MEP AND LIFE SAFETY. NORTHWOOD INVESTORS LLC
202 M ST SE   
12/10/14 
DISTRICT OF COLUMBIA / WOODY WICKLIFFE
TN1500035 / CONSTRUCTION
INSTALL 50FT X 100FT TENT NO GENERATORS NO COOKING NO SMOKING NO STAGES 10FT X 70FT TENT INSTALLED DEC 11-15 2014 EVENTS DEC 12-14 2014 12:01PM - 9:00 PM
1201 M ST SE   
12/11/14 
CARLTON RAY
AH1500149 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
75 N ST SE   
12/11/14 
CRANE SERVICE CO / CHRISTINE LONG
AH1500150 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 2:00AM THRU 11:00PM
800 NEW JERSEY AVE SE   
12/08/14 
SQUARE 737 LLC / GLENNWOOD ROGERS
P1501673 / SUPPLEMENTAL
25 POTOMAC AVE SE   
12/02/14 
RIVERFRONT HOLDINGS I LLC C/O ECC INC. / ECC INC.
UT1500007 / CONSTRUCTION
REMOVAL OF ONE 100-GALLON UNDERGROUND STORAGE TANK DURING MASS EXCAVATION ACTIVITIES FOR SITE REDEVELOPMENT.
   
12/03/14 
RIVERFRONT HOLDINGS I LLC / WOODY WICKLIFFE
TN1500032 / CONSTRUCTION
INSTALL 40FT X 80FT TENT NO COOKING NO SMOKING NO PROPANE NO LIGHTING 40FT X 40FT TENT 2 GENERATORS 25KW EACH 20FT X 20FT TENT 8FT X 20FT PLATFORM 40FT X 40FT PLATFORM 20FT X 20FT PLATFORM INSTALLED DEC 8 -9 2014 EVENT DEC 9 2014 9AM - 4PM
   
12/05/14 
FLORIDA ROCK PROPERTIES INC / ROBERT S. WATTS
E1501658 / SUPPLEMENTAL
   
12/05/14 
RIVERFRONT INVESTMENT PARTNERS / JASON BENTLEY
B1408697 / CONSTRUCTION
CONSTRUCTION OF NEW 9 STORY BUILDING. THIRD PARTY REVIEW
1500 SOUTH CAPITOL ST SE   
12/18/14 
NATIONALS PARK / MARK W GIBSON
E1501975 / SUPPLEMENTAL
300 TINGEY ST SE   
12/15/14 
FC BOILERMAKER LLC / GREGORY BIRCKHEAD; FC BOILERMAKER LLC; MICHAEL BELL
E55526822 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




Blog/Home
Project Directory
Photo Archive
Event Photos
 
Nats Park
Food Map
What's New
History

 
Demolished Buildings
Historic Photos
Satellite Images
Timeline
 
About JDLand
Message JD
Advertise
Photo Use
 
     © Copyright 2014 JD.