Since January, 2003

Ad by HillAds
 (a random before-and-after moment)
December 7, 2008
July 12, 2014
4th at Water St., Looking West-Southwest (see more)

Voice of the Hill has just posted an informative article giving a lot more detail on the Marine Corps' plans to replace the aging barracks building "20" on the north side of the freeway at Eighth and I, along with their desire to build additional facilities, including a fire station, child development center, gym, pool, parking, meeting space, post office, basketball and tennis courts, an indoor parade field, and a new Marine Barracks Washington museum. All in all, the Marines are looking for 173,000 square feet of space, some of which would be accessible (they say) to Hill residents.
Possible locations they're looking at for the new barracks appear to be north of the freeway (and outside of my boundaries!), including the Potomac Gardens public housing project at 12th and G, SE, and the Tyler Elementary baseball field at 10th and I, SE, but they are also considering the Marine Corps Institute site within the Washington Navy Yard. Also shown on their maps as a possible site is Square 882 (across from the barracks annex built in 2004), currently Nats Parking lot W on the site of the old Capper Seniors building, but the Voice article says that the DC Housing Authority has taken that block off the table--I've been hearing that DCHA is close to securing financing for the mixed-income apartment building they intend to build on the north side of that block, and would possibly begin construction by the end of this year.
The article also says that the current owners of the Blue Castle, Madison Marquette, have expressed an interest in leasing space in the old trolley barn to the Marines.
The Marines' web site for the development project has been updated with the packet from last week's open house, an FAQ, and other materials. There apparently will be a series of community meetings, which are described by the FAQ thusly: "The current plan is for the first workshop (February) to focus on needs and goals, the second workshop (March) to focus on potential development sites, the third workshop (April) to focus on CIMP alternatives, and the fourth workshop (May) to focus on CIMP consensus elements. Additionally, a charrette focused on the CIMP way forward will be held in fall 2010." (If you're interested in these, you should plan to attend rather than waiting for a JDLand report--I tend to stay away from community meetings that are pure planning sessions, because, well, they drive me insane.)
And note that this is a *different* armed forces expansion plan from the one we heard about last week, where the Navy is looking for additional office space outside of the walls of the Navy Yard. Got to keep your service branches straight these days!
Comments (0)
 
 More About Barracks

JDLand.com Home

Comments

Mark says: (2/2/10 8:24 AM)
My wife and I were disappointed to learn that DCHA has pulled square 882 from consideration. It seemed to make the most sense as it would permit the Marines to all be stationed together - which would enhance the security for the Marines while concurrently adding to the overall military feel of our neighborhood. Do you believe there is any chance that DCHA and the USMC could still reach an accord as concerns square 882?


JD says: (2/2/10 8:55 AM)
Remember that it's not just the apartments on the north side of Square 882--it's also Forest City's 600,000-sq-ft office building on the south side. A lot of money involved on that square.... (Not to say anything's ever truly off-the-table until a new building is built, of course.) I also wonder if that office building is a spot that the Navy would be looking at for it's own expansion needs....


Mark says: (2/2/10 9:30 AM)
JD -
A Joint Navy/ USMC "invasion" of that square would satisfy many, if not all, of their combined needs.


G St says: (2/2/10 9:35 AM)
Yes = close the Potomac Gardens public housing project. (Crime factory)


Brent Johnson says: (2/2/10 9:58 AM)
I am confused. Exactly what block is Square 882? What are the cross streets?


JD says: (2/2/10 10:00 AM)
Block bounded by L, M, and 7th. Where the big surface parking lot is across from the Navy Yard. Used to be the old Capper Seniors building. Just south of the Marine Bachelor Enlisted Quarters building that opened in 2004.


B in DC says: (2/2/10 4:24 PM)
I"m concerned that most of these public amenities will never be open to the public or open on such a limited basis to make public access meaningless. I understand, however, the Marines' needs for additional space and their desire for co-location. Personally, I think it would be great if they would close Potomac Gardens and take over that area.


Mark says: (2/3/10 12:02 AM)
The field next to the new barracks is open to the public - you just have to show an ID to use the field.


MJM says: (2/3/10 9:53 AM)
It hit me yesterday as I was driving down L St - lots of fences outside the Marine buildings. With more Marine buildings - we are gonna see more security fences. That is not really a neighborhood when you have fences around half the hood. Might seem petty but you have Wells concerned about another Crystal City with the type of buildings going in now. We need open space not half the area with fences around it. Go build on the other side of 295/395.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Tell readers about your apartment/house/item
for two weeks for $5.
Someone's looking for
what you're selling!
List it here.
Recent Comments:  
BillP on Community Center Groundbreaking: @conngs, you beat me to it! The artist is clearly a car guy with a sense of humo...
MJM on Community Center Groundbreaking: Too bad the new name wasn't a reflection of the area rather a housing developmen...
JD on Community Center Groundbreaking: (And by the way, I've seen all those stories, and many more--it's the writing ab...
ZoolanderANDtheBoYz on Community Center Groundbreaking: @JD, surgical bills-- no. Narcotics - a brother can hook you up with that.



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
M ST SE AND HALF ST SE   ROBBERY /  08/17/14
800 B/O VIRGINIA AVE SE   THEFT F/AUTO /  08/17/14
M ST SE AND 5TH ST SE   THEFT F/AUTO /  08/15/14
1400 B/O 1ST ST SE   THEFT F/AUTO /  08/14/14
1000 B/O 1ST ST SE   BURGLARY /  08/12/14
800 B/O L ST SE   THEFT F/AUTO /  08/11/14
HALF ST SE AND L ST SE   THEFT F/AUTO /  08/11/14
1000 B/O NEW JERSEY AVE SE   THEFT /  08/07/14
1100 B/O 10TH ST SE   THEFT /  08/07/14
70 B/O I ST SE   THEFT /  08/02/14
100 B/O K ST SE   THEFT F/AUTO /  08/01/14
200 B/O L ST SE   THEFT F/AUTO /  07/30/14
L ST SE AND 2ND ST SE   THEFT F/AUTO /  07/30/14
70 B/O I ST SE   MOTOR VEHICLE THEFT /  07/29/14
70 B/O I ST SE   THEFT /  07/29/14
1100 B/O NEW JERSEY AVE SE   THEFT /  07/28/14
400 B/O K ST SE   THEFT /  07/24/14

Active Public Space Permits Archive  
1011 1ST ST SE    Pepco Holdings Inc 
Issued
excavation; new  
 06/26/14
to
08/26/14
1331 2ND ST SE    Carlton Ray 
Assigned
paving; streetfixture; excavation  
 02/10/14
to
02/09/15
908 3RD ST SE    Rachel Frankel 
Issued
streetfixture; new  
 07/24/14
to
09/21/14
1026 3RD ST SE    Wash Gas & Light Co. 
Issued
excavation; new  
 06/26/14
to
09/04/14
1331 4TH ST SE    Forest City Forest City 
Issued
excavation; new  
 01/10/14
to
02/10/15
913 5TH ST SE    Wash Gas & Light Co. 
Issued
excavation; new  
 06/26/14
to
08/28/14
1100 - 1199 BLOCK 1ST ST SE    tom cash 
Issued
excavation; new  
 06/27/14
to
08/25/14
410 M ST SE    Pepco Holdings Inc 
Issued
excavation; new  
 07/11/14
to
09/08/14
880 NEW JERSEY AVE SE    WASHINGTON GAS 
Issued
excavation; new  
 07/28/14
to
09/26/14
301 TINGEY ST SE    Potbelly Sandwich Works LLC 
Issued
new  
 03/21/12
to
11/27/14

Recent Issued Building Permits Archive  
1011 1ST ST SE   
08/06/14 
TOLL DC LP / MITCH A. PERMUY
E1407892 / SUPPLEMENTAL
   
08/11/14 
TOLL DC LP / ALBERT J. PEARCE
FB1400108 / SUPPLEMENTAL
1259 1ST ST SE   
08/11/14 
CAPITAL RIVERFRONT HOTEL LLC / CAPITAL RIVERFR HOTEL LLC
AH1400636 / CONSTRUCTION
AFTER HOURS FOR PERMIT NUMBER B1401471 FOR 8 / 12 THROUGH 9 / 11 FROM 5AM TO 7PM MONDAY THROUGH SATURDAY.
1212 4TH ST SE   
08/07/14 
TAKOREAN / FVI 2020
B1410615 / CONSTRUCTION
REVISION TO TL1400052 TO INCLUDE OUTDOOR SUMMER GARDEN WITH 14 SEATS AND 7 TABLES.
1201 4TH ST SE   
08/12/14 
JBG/FEDERAL CENTER LIC / JIM CALABRESE
AN1400129 / CONSTRUCTION
PLEASE EXTEND PERMIT AN1300174 THIS IS THE FIRST EXTENSION AND PERMIT WILL BE VALID UNTIL 1 / 31 / 2015.
1212 4TH ST SE   
08/05/14 
FC 1212 LLC / THE YARDS
TL1400165 / CONSTRUCTION
FIRST TIME TENANT LAYOUT FOR NEW MANAGEMENT OFFICE 2ND FLOOR TOTAL OF 780 SQ FT RENOVATION LIMIT TO MECHANICAL ELECTRIC AND FIRE LIFE SAFETY ONLY
1331 4TH ST SE   
08/14/14 
F. C. 1331 LLC / FVI 2020
B1402843 / CONSTRUCTION
CONSTRUCTION OF A BRAND NEW 11 STORY BUILDING. THE BUILDING IN TOTAL IS 350 000 SQ FT. ADDING 327 RESIDENTIAL RENTAL UNITS 20 000 SQ FT. IN COMMERCIAL SPACE AND 3 BELOW GRADE PARKING LEVELS.
   
08/15/14 
CLARK CONCRETE
AH1400650 / CONSTRUCTION
AFTER HOURS TO POUR CONCRETE ON JOBSITE FROM 7AM TO 7PM FROM SUNDAY TO SATURDAY 8 / 15 / 2014 TO 11 / 15 / 2014
1000 5TH ST SE   
08/07/14 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / KIM MITCHELL CDKM CONSULTING LLC
FD1400029 / CONSTRUCTION
FOUNDATION TO GRADE TO INCLUDE UTILITIES
   
08/13/14 
UNITED STATES OF AMERICA /
FD1400132 / CONSTRUCTION
NEW FOUNDATION TO GRADE PERMIT FOR NEW COMMUNITY CENTER INCLUDING UTILITIES. REVISION TO FD1400029 TO REVISE STRUCTURAL DETAILS OF COLUMS.
   
08/20/14 
UNITED STATES OF AMERICA / BRUCE G. PICKETT
E1408304 / SUPPLEMENTAL
1015 HALF ST SE   
08/12/14 
HALF ST SE LLC / SAM HOLLEN RAMCO OF DC INC.
TL1400162 / CONSTRUCTION
INTERIOR TENANT LAYOUT OF 1ST FLOOR PERFORMANCE STUDIO SPACE AND OFFICE SPACE. PARTITIONS FURNITURE MECHANICAL ELECTRICAL AND LIFE SAFETY. CBS
   
08/15/14 
HALF ST SE LLC / ROBERT L HUNTER
M1402951 / SUPPLEMENTAL
   
08/16/14 
SAM HOLLEN / DONALD VEALS; SAM HOLLEN; DONALD VEALS
E83010192 / SUPPLEMENTAL
200 I ST SE   
08/08/14 
DANIEL RILEY / OMAR BIAGAS; DANIEL RILEY; JOHN BIAGAS
E47247428 / SUPPLEMENTAL
41 L ST SE   
08/20/14 
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY (WMATA) / SAMIR ALQUTRI - GEOTECHNICAL SOLUTIONS INC.
SB1400402 / CONSTRUCTION
GSI PLANS TO DRILL 4 SOIL TEST BORINGS TO CONFIRM SOIL STRENGTH WITH A HOLLOW-STEM AUGER EQUIPPED WITH A SPLIT SPOON SAMPLER FOR THE SPT N-VALUE TESTS DOWN TO A MAXIMUM DEPTH OF 80 FEET BELOW EXISTING GRADES. ALL BORINGS WILL BE DRILLED TO THE MAXIMUM DEPTH OR AUGER REFUSAL WHICHEVER OCCURS FIRST. THE BORE HOLES DIMENSION WILL BE 3.25 INCHES AND SHALL BE GROUTED UPON COMPLETION.
601 L ST SE   
08/06/14 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / JOSEPH M MAGNOLIA
P1407161 / SUPPLEMENTAL
20 M ST SE   
08/06/14 
SOUTHEAST REALTY LLC /
P1407613 / SUPPLEMENTAL
100 M ST SE   
08/06/14 
SQUARE 743 INC /
P1407610 / SUPPLEMENTAL
   
08/16/14 
NORTHWOOD INVESTERS LLC / STANLEY HUBBARD; NORTHWOOD INVESTERS LLC; STANLEY HUBBARD
E14516088 / SUPPLEMENTAL
901 M ST SE   
08/14/14 
CARLTON RAY
AH1400642 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
1201 M ST SE   
08/14/14 
CARLTON RAY
AH1400641 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
1111 NEW JERSEY AVE SE   
08/12/14 
NJA ASSOCIATES LLC / COLIN CLARK
B1308085 / CONSTRUCTION
CONSTRUCT A NEW 13 STORY APARTMENT BUILDING WITH THREE BELOW GRADE PARKING LEVELS FIRST FLOOR RETAIL A PRIVATE SWIMMING POOL PROJECTIONS OF BAY WINDOWS 324 UNITS TO INCLUDE MECHANICAL PLUMBING ELECTRICAL AND ELEVATOR WORK.
1500 SOUTH CAPITOL ST SE   
08/04/14 
LIVE NATION / DAVID VEGA
AH1400629 / CONSTRUCTION
TO CLOSE OFF STREETS FOR LOADING AND UNLOADING OF STADIUM EVENTS 7PM - 7AM
300 TINGEY ST SE   
08/05/14 
FC BOILERMAKER LLC / PHILLIP B MOBLEY
M1402818 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




Blog/Home
Project Directory
Photo Archive
Event Photos
 
Nats Park
Food Map
What's New
History

 
Demolished Buildings
Historic Photos
Satellite Images
Timeline
 
About JDLand
Message JD
Advertise
Photo Use
 
     © Copyright 2014 JD.