Since January, 2003
 (a random before-and-after moment)
February 16, 2006
December 13, 2014
1st at L, Looking North-Northeast (see more)

Voice of the Hill has just posted an informative article giving a lot more detail on the Marine Corps' plans to replace the aging barracks building "20" on the north side of the freeway at Eighth and I, along with their desire to build additional facilities, including a fire station, child development center, gym, pool, parking, meeting space, post office, basketball and tennis courts, an indoor parade field, and a new Marine Barracks Washington museum. All in all, the Marines are looking for 173,000 square feet of space, some of which would be accessible (they say) to Hill residents.
Possible locations they're looking at for the new barracks appear to be north of the freeway (and outside of my boundaries!), including the Potomac Gardens public housing project at 12th and G, SE, and the Tyler Elementary baseball field at 10th and I, SE, but they are also considering the Marine Corps Institute site within the Washington Navy Yard. Also shown on their maps as a possible site is Square 882 (across from the barracks annex built in 2004), currently Nats Parking lot W on the site of the old Capper Seniors building, but the Voice article says that the DC Housing Authority has taken that block off the table--I've been hearing that DCHA is close to securing financing for the mixed-income apartment building they intend to build on the north side of that block, and would possibly begin construction by the end of this year.
The article also says that the current owners of the Blue Castle, Madison Marquette, have expressed an interest in leasing space in the old trolley barn to the Marines.
The Marines' web site for the development project has been updated with the packet from last week's open house, an FAQ, and other materials. There apparently will be a series of community meetings, which are described by the FAQ thusly: "The current plan is for the first workshop (February) to focus on needs and goals, the second workshop (March) to focus on potential development sites, the third workshop (April) to focus on CIMP alternatives, and the fourth workshop (May) to focus on CIMP consensus elements. Additionally, a charrette focused on the CIMP way forward will be held in fall 2010." (If you're interested in these, you should plan to attend rather than waiting for a JDLand report--I tend to stay away from community meetings that are pure planning sessions, because, well, they drive me insane.)
And note that this is a *different* armed forces expansion plan from the one we heard about last week, where the Navy is looking for additional office space outside of the walls of the Navy Yard. Got to keep your service branches straight these days!
Comments (0)
 
 More About Barracks

JDLand.com Home

Comments

Mark says: (2/2/10 8:24 AM)
My wife and I were disappointed to learn that DCHA has pulled square 882 from consideration. It seemed to make the most sense as it would permit the Marines to all be stationed together - which would enhance the security for the Marines while concurrently adding to the overall military feel of our neighborhood. Do you believe there is any chance that DCHA and the USMC could still reach an accord as concerns square 882?


JD says: (2/2/10 8:55 AM)
Remember that it's not just the apartments on the north side of Square 882--it's also Forest City's 600,000-sq-ft office building on the south side. A lot of money involved on that square.... (Not to say anything's ever truly off-the-table until a new building is built, of course.) I also wonder if that office building is a spot that the Navy would be looking at for it's own expansion needs....


Mark says: (2/2/10 9:30 AM)
JD -
A Joint Navy/ USMC "invasion" of that square would satisfy many, if not all, of their combined needs.


G St says: (2/2/10 9:35 AM)
Yes = close the Potomac Gardens public housing project. (Crime factory)


Brent Johnson says: (2/2/10 9:58 AM)
I am confused. Exactly what block is Square 882? What are the cross streets?


JD says: (2/2/10 10:00 AM)
Block bounded by L, M, and 7th. Where the big surface parking lot is across from the Navy Yard. Used to be the old Capper Seniors building. Just south of the Marine Bachelor Enlisted Quarters building that opened in 2004.


B in DC says: (2/2/10 4:24 PM)
I"m concerned that most of these public amenities will never be open to the public or open on such a limited basis to make public access meaningless. I understand, however, the Marines' needs for additional space and their desire for co-location. Personally, I think it would be great if they would close Potomac Gardens and take over that area.


Mark says: (2/3/10 12:02 AM)
The field next to the new barracks is open to the public - you just have to show an ID to use the field.


MJM says: (2/3/10 9:53 AM)
It hit me yesterday as I was driving down L St - lots of fences outside the Marine buildings. With more Marine buildings - we are gonna see more security fences. That is not really a neighborhood when you have fences around half the hood. Might seem petty but you have Wells concerned about another Crystal City with the type of buildings going in now. We need open space not half the area with fences around it. Go build on the other side of 295/395.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Recent Comments:  
JD on Tuesday Tidbits: I'm guessing when he reaches the end of the lineup on the blog (which is conside...
conngs0 on Tuesday Tidbits: Sadly I'll miss this, but I'll be interested to know of any favorites that have ...
JD on Tuesday Tidbits: Come to 100 Montaditos at about 1:30 today (Thursday, Jan. 29) if you want to to...
JD on Bonchon Buildout Progressing/Half: Speaking of Scarlet Oak, PoPVille has them saying mid-May:



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1300 B/O M ST SE   THEFT F/AUTO
Theft From Auto 1
 01/27/15
1200 B/O 4TH ST SE   THEFT
Theft 1st Degree
 01/26/15
70 B/O I ST SE   SEX ABUSE
2nd Degree Sexual Abuse
 01/25/15
1000 B/O 8TH ST SE   THEFT F/AUTO
 01/25/15
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2 (Theft F/Building)
 01/22/15
1100 B/O NEW JERSEY AVE SE   THEFT
2nd Degree
 01/20/15
400 B/O M ST SE   THEFT
2nd Degree
 01/19/15
1000 B/O 7TH ST SE   ASSAULT W/DANGEROUS WEAPON
Adw -- Knife
 01/15/15
1100 B/O NEW JERSEY AVE SE   THEFT
2nd Degree
 01/12/15
1000 B/O NEW JERSEY AVE SE   THEFT F/AUTO
 01/12/15
1100 B/O 5TH ST SE   THEFT F/AUTO
Theft From Auto 1
 01/05/15
100 B/O L ST SE   THEFT F/AUTO
 12/30/14

Active Public Space Permits Archive  
1331 2ND ST SE    Carlton Ray 
Assigned
paving; streetfixture; excavation  
 02/10/14
to
02/09/15
1331 4TH ST SE    Forest City Forest City 
Issued
excavation; new  
 01/10/14
to
02/10/15

Recent Issued Building Permits Archive  
1025 1ST ST SE   
01/13/15 
FRANCISCA OTERO
PC52706432 / POST CARD
INSTALLATION OF NOT MORE THAN 1 NEW AIR CONDITIONING UNIT UP TO A MAXIMUM OF 10-TONS OF EQUIVALENT REFRIGERATING EFFECT.
801 2ND ST SE   
01/22/15 
BAKER DC LLC / CHRISTINE LONG
AH1500209 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FORM 7:00 PM THRU 7:00AM
1201 4TH ST SE   
01/13/15 
JGB/FEDERAL CENTER LLC / JIM CALABRESE
AN1500018 / CONSTRUCTION
REPLACE 10 EXISTING ANTENNAS WITH 10 NEW ANTENNAS. PLEASE NOTE THAT THE TOTAL NUMBER OF ANTENNAS PER SECTOR / MOUNT WILL NOT EXCEED 5 PER DCRA CODE. THEREFORE NO OFFICE PLANNING LETTER IS REQUIRED. AS PER PLANS AS PER CODE.
1240 12TH ST SE   
01/14/15 
AECOM TECHNICAL SERVICE / ERIKA FERGERSON - CARROLL
B1503361 / CONSTRUCTION
CONTRACTOR TO PLACE CONSTRUCTION TRAILER ON PRIVATE PROPERTY LOCATED AT 1240 12TH ST SE PROPERTY.
82 I ST SE   
01/23/15 
RUSSELL WHITWORTH GREYSTONE / SHELDON WILLIAMS WILES MENSCH CORP; RUSSELL WHITWORTH
BCIV1400098 / CONSTRUCTION
RELOCATE A 12 INCH WATER LINE THIS SUMMER.
100 I ST SE   
01/24/15 
NA NA NA
EHOP1590258 / HOME OCCUPATION
125 L ST SE   
01/12/15 
SOK C REED ANN'S BEAUTY SUPPLY & WIG CO / PAPA-KWESI COLEMAN
B1501967 / CONSTRUCTION
CONVERTING A PORTION OF EXISTING BEAUTY SALON TO OFFICE FOR CERTIFICATE OF OCCUPANCY PURPOSES.
20 M ST SE   
01/12/15 
SOUTHEAST REALTY LLC / JOHN GIUSEPPE-RAMCO
TL1500021 / CONSTRUCTION
REVISION TO PLANS AND PERMIT TL1400132 SUBWAY SANDWICH SHOP AS SHOWN ON THE ATTACHED ARCH ELECTRICAL PLUMBING AND MECHANICAL DWGS. AND WRITTEN DESCRIPTION OF CHANGES BEING MADE. INTERIOR WORK ONLY. NO STRUCTURAL WORK INVOLVED. NO CHANGE IN SEATING CAPACITY STAYING AT 41.
50 M ST SE   
01/26/15 
ENGLEWOOD LLC / FVI 2020
SH1400087 / CONSTRUCTION
SHEETING AND SHORING ACTIVITIES RELATED TO CONSTRUCTION OF NEW HOTEL 11 ABOVE GRADE 1 STORY BELOW GRADE 195 HOTEL SUITES
100 M ST SE   
01/20/15 
SQUARE 743 INC / JOHN MCDONALD
P1502784 / SUPPLEMENTAL
   
01/14/15 
SQUARE 743 INC / MATTHEW WERT
P1502642 / SUPPLEMENTAL
   
01/20/15 
SQUARE 743 INC. / SAM HOLLEN RAMCO OF DC INC.
B1503542 / CONSTRUCTION
INTERIOR RENOVATION FOR 7TH FLOOR TENANT CORRIDOR. PARTITIONS DOORS MECHANICAL ELECTRICAL AND LIFE SAFETY.
861 NEW JERSEY AVE SE   
01/28/15 
CSX TRANSPORTATION / CSX TRANSPORTATION; INTERAGENCY CONSULTANTS; ; JUSTIN DONNELLY
BCIV1400064 / CONSTRUCTION
THE VIRGINIA AVENUE TUNNEL RECONSTRUCTION PROJECT WILL MODIFY THE EXISTING CSX OWNED-AND-OPERATED TUNNEL AND TRACKS IN SE WASHINGTON DC APPROXIMATELY FROM SOUTH CAPITOL STREET TO WATER ST SE AND UNDERNEATH THE EASTBOUND LANES OF VIRGINIA AVE SE.
909 NEW JERSEY AVE SE   
01/15/15 
SCARLET OAK / EVAN O'BRIEN/ D MCKEEVER SERVICES
TL1500002 / CONSTRUCTION
NEW TENANT LAYOUT FOR NEW 3754 SF RESTAURANT. PARTITION PLAN NEW COMMERCIAL KITCHEN BAR MILL WORK AND DINING AREA INCLUDED NO OUT SIDE SEATING ON THIS PERMIT.
1000 NEW JERSEY AVE SE   
01/12/15 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / RICHARD G. FINFROCK
P1502547 / SUPPLEMENTAL
1111 NEW JERSEY AVE SE   
01/23/15 
DONOHOE DEVELOPMENT COMPANY / DANIEL M. NARH
P1502702 / SUPPLEMENTAL
25 POTOMAC AVE SE   
01/12/15 
RIVERFRONT HOLDINGS I LLC / DANIEL M. NARH
P1502450 / SUPPLEMENTAL
816 POTOMAC AVE SE   
01/13/15 
JAMES ANDERSON 818 POTOMAC AVE SE LLC / WILLIAM WESTERM FROEHLING AND ROBERTSON INC.
SB1400485 / CONSTRUCTION
5 SOIL BORINGS EIGHT INCHES IN DIAMETER TO DEPTHS RANGING FROM 40 TO 60 FEET. SOIL BORINGS WILL BE CONDUCTED IN THE PARKING LOT LOCATED ON THE EAST SECTION OF THE 816 POTOMAC AVE SE PROPERTY. HOLLOW STEM AUGER METHODS WILL BE USED TO CONDUCT THE SOIL BORINGS.
300 TINGEY ST SE   
01/23/15 
CM-YARDS LLC / DWIGHT SMITH; NONE
SG1400461 / CONSTRUCTION
INSTALL EXTERIOR SIGN ABOVE DOOR.
1301 WATER ST SE   
01/28/15 
EASTERN POWER BOAT CLUB / STANLEY HUBBARD JR
E90564415 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
M ST   11/26/14
$ 2,000
LHREV WASHINGTON M STREET LLC
 
0770 M ST SE   11/14/14
$ 23,900,000
770 M STREET LLC
 


Project Directory




Blog/Home
Project Directory
Photo Archive
Event Photos
 
Nats Park
Food Map
What's New
History

 
Demolished Buildings
Historic Photos
Satellite Images
Timeline
 
About JDLand
Message JD
Advertise
Photo Use
 
     © Copyright 2015 JD.