Since January, 2003

Ad by HillAds
 (a random before-and-after moment)
August 6, 2005
September 28, 2014
4th at Water St., Looking North-Northwest (see more)

In advance of Thursday's National Capital Planning Commission meeting that will review the surface parking lots zoning amendment, the Voice of the Hill has posted a piece about the controversial inclusion of the Canal Park blocks within the parcels approved for parking. Much of the piece covers territory I've written about over the past few days, but has some new nuggets. Money quote: "Joel Lawson, the Office of Planning's acting deputy director for neighborhood and long-range planning, said the portions of squares containing Canal Park were never intended to be used for parking and should not have been included. 'I can understand why people are concerned about this,' he said. But, he added, 'We knew the parking wasn't going to go there.' He said the planning office will amend its request to make explicit this provision." Another quote, from the spokesman for Deputy Mayor of Planning and Economic Development Neil Albert: "We have no intention to use this three-block site for stadium parking, and we fully expect to move forward in building this important public amenity on schedule." This would appear to make the NCPC meeting less of a critical juncture, but I'll still be there to check it out. Besides, they're also having a big presentation on the first-phase plans for The Yards.
 
 More About parking

JDLand.com Home

Comments

Sorry, comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 
 Top News
  
Recent Comments:  
JD on A Capper Mixed-Income: They are indeed new.
202_cyclist on A Capper Mixed-Income: Perhaps not the most exciting news but there are new parking meters that have be...
JD on A Capper Mixed-Income: There's a meeting coming on Nov. 20 for public comment on whether the city shoul...
ZoolanderANDtheBoYz on A Capper Mixed-Income: It sounds like they won't start construction till 2020. Off the topic. When the...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
200 B/O M ST SE   THEFT /  10/12/14
200 B/O I ST SE   THEFT /  10/08/14
70 B/O I ST SE   THEFT F/AUTO /  10/08/14
800 B/O L ST SE   BURGLARY /  10/07/14
9TH ST SE AND POTOMAC AVE SE   THEFT F/AUTO /  10/03/14
100 B/O K ST SE   THEFT F/AUTO /  10/03/14
VIRGINIA AVE SE AND 8TH ST SE   THEFT F/AUTO /  09/28/14
6D   THEFT F/AUTO /  09/27/14
1100 B/O NEW JERSEY AVE SE   THEFT /  09/26/14
300 B/O WATER ST SE   THEFT /  09/24/14
50 B/O M ST SE   THEFT /  09/24/14

Active Public Space Permits Archive  
1331 2ND ST SE    Carlton Ray 
Assigned
paving; streetfixture; excavation  
 02/10/14
to
02/09/15
1331 4TH ST SE    Forest City Forest City 
Issued
excavation; new  
 01/10/14
to
02/10/15
301 TINGEY ST SE    Potbelly Sandwich Works LLC 
Issued
new  
 03/21/12
to
11/27/14

Recent Issued Building Permits Archive  
1212 4TH ST SE   
10/10/14 
FORREST CITY
TL1500006 / CONSTRUCTION
CHANGE OWNER ADDRESS ON EXISTING BUILDING PERMIT TL1400136
1019 4TH ST SE   
10/14/14 
JOHN SHORT
F1500026 / CONSTRUCTION
WE WILL INSTALL AN ORNAMENTAL IRON FENCE IN THE FRONT YARD WITH A GATE. THE FENCE IS 3 FEET HIGH AND THE FENCE WILL BE BLACK IRON. FENCE IS ENTIRELY ON PUBLIC SPACE.
1212 4TH ST SE   
10/16/14 
FC 1212 LLC / PAUL R. JABLONSKI
E1500411 / SUPPLEMENTAL
   
10/16/14 
FC 1212 LLC / ARK SIGN SERVICES INC.; NONE
SG1500034 / CONSTRUCTION
INSTALL ONE WALL MOUNTED ILLUMINATED SIGN.
1103 9TH ST SE   
10/10/14 
ICP PARTNERS POTOMAC 810 LLC / HARRY RIDGEWAY
P1500293 / SUPPLEMENTAL
1220 12TH ST SE   
10/10/14 
WASHINGTON GAS LIGHT CO /
P1500284 / SUPPLEMENTAL
80 M ST SE   
10/10/14 
VEIC / GEORGE DELGADO
B1411521 / CONSTRUCTION
INTERIOR ALTERATION TO SUITE 310 AS REQUIRED FOR EXPANSION. WORK TO INCLUDE ELECTRICAL MECHANICAL AND PLUMBING
20 M ST SE   
10/17/14 
SOUTHEAST REALTY LLC / DAMON ELLIS; .
SG1400457 / CONSTRUCTION
INSTALLATION OF NEW NON ELECTRIC SIGN 10FT L 1FT 8IN H 3IN W
99 M ST SE   
10/07/14 
BALLPARK SQUARE 701 LLC / STEVEN ADAMCHAK ECS MID-ATLANTIC LLC
SB1400475 / CONSTRUCTION
TWO GEOTECHNICAL BORINGS TO A AN APPROXIMATE DEPTH OF 60 FT BELOW EXISTING SITE GRADES TO BE LOCATED WITHIN PRIVATE PROPERTY. TWO BORINGS WILL BE CONVERTED TO TEMPORARY MONITORING WELLS.
100 M ST SE   
10/10/14 
SQUARE 743 INC /
P1500281 / SUPPLEMENTAL
   
10/07/14 
SQUARE 743 INC / ANTHONY G SAMBURG
E1500145 / SUPPLEMENTAL
   
10/15/14 
NORTHWOOD INVESTERS LLC / STANLEY HUBBARD; NORTHWOOD INVESTERS LLC; STANLEY HUBBARD
E14516088 / SUPPLEMENTAL
   
10/17/14 
WASHINGTON D.C. / GARY MCVEY; WASHINGTON D.C.; GARY MCVEY
E50257566 / SUPPLEMENTAL
901 M ST SE   
10/16/14 
CARLTON RAY
AH1500035 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
1201 M ST SE   
10/14/14 
COMCAST CABLE / MICHAEL SONESEN
AH1500018 / CONSTRUCTION
PLACING INNERDUCT IN EXISTING VERIZON MANHOLES. OCTOBER 9 2014 ? NOVEMBER 9. 2014. 7PM ? 2AM WEEKNIGHTS ? SATURDAYS
   
10/16/14 
CARLTON RAY
AH1500034 / CONSTRUCTION
TO PERFORM TEMPORARY LANE CLOSURES
1000 NEW JERSEY AVE SE   
10/14/14 
CAPITOL HILL TOWER HOUSING COOPERATIVE INCF / RICHARD G. FINFROCK
P1500331 / SUPPLEMENTAL
1111 NEW JERSEY AVE SE   
10/10/14 
DONOHOE DEVELOPMENT COMPANY / HERB LAWHORN
SB1400488 / CONSTRUCTION
A HOLLOW STEM AUGER WILL INSTALL 10 TEMPORARY DEWATERING WELLS BY ADVANCING A 12 INCH OUTER DIAMETER / 8 1 / 4 INCH INNER DIAMETER BORE HOLE TO A DEPTH OF 70 FEET BGS. AT DEPTH A 4 INCH PVC FLUSH JOINT THREADED WELL ASSEMBLY WILL BE SET AND SELECT FILTER PLACED. INTO EACH WELL WILL BE INSTALLED 2 HP TURBINE SUBMERSIBLE PUMPS. EFFLUENT WILL BE DIRECTED THROUGH A COMMON MANIFOLD TO A BAFFLED SETTLIN...
   
10/16/14 
GALLERY CAPITOL RIVERFRONT / THOMAS P MCGUIRE
E1500402 / SUPPLEMENTAL
25 POTOMAC AVE SE   
10/08/14 
MRP REALTY / JASON BENTLEY
SH1400037 / CONSTRUCTION
SHEETING AND SHORING FOR NEW BUILDING
300 TINGEY ST SE   
10/06/14 
FC BOILERMAKER LLC FC BOILERMAKER LLC / FC BOILERMAKER FC BOILERMAKER LLC
B1500169 / CONSTRUCTION
INSTALLATION OF KITCHEN FIRE SUPPRESSION SYSTEM
   
10/15/14 
FC BOILERMAKER LLC / BIRKHEAD ELECTRIC INC.; ERIN ANCHOR SIGN INC
SG1500023 / CONSTRUCTION
2-COMMERCIAL SIGN INSTALLATION
301 WATER ST SE   
10/23/14 
FOREST CITY
B1408021 / CONSTRUCTION
REVISION TO B1305741 EXTERIOR SEATING LOAD FROM 188 TO 345 EXTERIOR SEATING CONSIDER AS SUMMER GARDEN ON PRIVATE PROPERTY PER GSA / DC GOV EASMENT.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
CUSHING PL   09/11/14
$ 9,000,000
HALF STREET RESIDENTIAL PJV LLC
 
HALF ST   09/11/14
$ 12,500,000
HALF STREET RESIDENTIAL PJV LLC
 
N ST   09/11/14
$ 12,500,000
HALF STREET RESIDENTIAL PJV LLC
 
CUSHING PL   09/11/14
$ 9,000,000
HALF STREET RESIDENTIAL PJV LLC
 
N ST   09/11/14
$ 12,500,000
HALF STREET RESIDENTIAL PJV LLC
 
N ST   09/11/14
$ 12,500,000
HALF STREET RESIDENTIAL PJV LLC
 
HALF ST   09/11/14
$ 12,500,000
MR BP RESIDENTIAL #1A LLC
 
N ST   09/11/14
$ 12,500,000
MR BP RESIDENTIAL #1A LLC
 
0025 POTOMAC AV   08/08/14
$ 78,486,500
RIVERFRONT HOLDINGS I LLC
 


Project Directory




Blog/Home
Project Directory
Photo Archive
Event Photos
 
Nats Park
Food Map
What's New
History

 
Demolished Buildings
Historic Photos
Satellite Images
Timeline
 
About JDLand
Message JD
Advertise
Photo Use
 
     © Copyright 2014 JD.